Answer
Flashcards · 2059 · Topic 2.3
Power flashcards
9 cards on Topic 2.3. Pick a subtopic or study them all.
Study mode needs JavaScript. Every card is listed below, so you can still cover the answers and test yourself.
Choose your cards
Session complete
Worth another look:
All 9 cards
For a quick read-through or printing. Cover the right-hand side to test yourself.
Topic 2.3: Power
- How is coal extracted by open cast, adit and shaft mining?
- Open cast: overburden is stripped and a near-surface seam dug from a pit (Thar). Adit: a near-horizontal tunnel driven into a hillside where a seam outcrops (Balochistan hills). Shaft: a vertical shaft to deep seams, with horizontal galleries.
- How are oil and gas found and extracted?
- Seismic surveys locate folded rock (anticlines) where oil and gas are trapped under impermeable cap rock. A rig drills a well and the fuel rises under pressure or is pumped.
- Why is most Thar coal burned in power stations next to the mine?
- It is low-grade lignite with high moisture and ash and a low heat value, so hauling it long distances is uneconomic. Electricity is sent out by transmission line instead. Steel and cement use imported higher-grade coal.
- How does gas reach places away from the pipeline network, and what are the limits?
- As LPG in cylinders delivered by road. Limits: higher cost per unit than piped gas, shortages in winter when demand peaks, slow delivery on poor roads, and safety risks from leaks.
- Why does Pakistan import large amounts of oil?
- Transport, power stations and industry all use oil, but domestic fields (Potwar Plateau, Badin area) are small and old, meeting only around a fifth or less of demand (early-to-mid 2020s, approximate).
- How does imported refined fuel reach northern Punjab?
- By tanker to Karachi or Port Qasim, then through the White Oil Pipeline to Mahmood Kot near Multan, then by rail tank wagons or road tankers to depots.
- What physical and human conditions favour a multi-purpose hydel scheme?
- Physical: narrow gorge, strong impermeable rock, large reliable river flow, wide valley upstream to store water. Human: capital, engineering skill, demand for power and irrigation water, few people to resettle.
- Why is electricity supply unreliable in many parts of Pakistan?
- Demand has outgrown supply, imported fuel is costly, hydel output falls in winter, transmission losses and unpaid bills (circular debt) are high, and remote areas are far from the grid, causing load-shedding.
- Exam trap: is hydel output steady all year?
- No. In winter snowmelt stops and rainfall is low, so river flow and hydel output drop sharply.