Revision Notes
Cambridge O Level Pakistan Studies: Power — Revision Notes
Revision notes on fuel extraction, coal, gas and oil supply, generation and renewables for Cambridge O Level Pakistan Studies 2059 Paper 2 Section 3 Power.
- Subject
- Pakistan Studies
- Level
- O LEVELS
- Topic
- Paper 2 – The Environment of Pakistan
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to Cambridge O Level Pakistan Studies (2059), 2026. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge O Level Pakistan Studies.
Syllabus points this page covers
2059
- 2.3 Power
Found an error? Report a correction.
Need help with this topic? Request a free trial class for O Level Pakistan Studies (2059).
These notes compress Section 3 Power of Cambridge O Level Pakistan Studies 2059 Paper 2 into tables and checklists for the last weeks before the exam. You must be able to draw the extraction methods, name where each fuel comes from and how it is moved, and judge which power sources can best close Pakistan’s energy gap. For full explanations, use the Power study guide.
Syllabus checklist (2059, 2026)
- ☐ 3(a) Diagrams of open cast, adit and shaft mining, and of drilling for oil and gas
- ☐ 3(a) Renewable versus non-renewable; how hydel, wind, solar, wave, tidal, biofuel and geothermal power work
- ☐ 3(a) Why power matters for development
- ☐ 3(b) Coal quality, amount, reserve life, imported coal types, transport to users
- ☐ 3(b) Gas output, reserve life, pipeline extent, supply beyond the pipelines and its limits
- ☐ 3(b) Oil output, reserve life, imports and why, pipelines and other carriers
- ☐ 3(b) Ways electricity is generated; non-renewables running out and rising in price
- ☐ 3(c) Pros and cons of water, wind, wave and solar electricity
- ☐ 3(c) Conditions for multi-purpose hydel; factors helping or hindering supply; small-scale schemes
- ☐ 3(c) Why supply is insufficient and unreliable in many areas
Key terms
| Term | Definition |
|---|---|
| Overburden | Soil and rock lying above a coal seam, removed in open cast mining |
| Adit | A horizontal or gently sloping tunnel into a hillside to reach a seam |
| Anticline | An upfold of rock layers that can trap oil and gas beneath cap rock |
| Lignite | Low-grade “brown” coal with high moisture and ash; most Thar coal |
| LPG | Liquefied petroleum gas, sold in cylinders where there is no pipeline |
| LNG | Liquefied natural gas, imported by ship and regasified at Port Qasim |
| Thermal power | Electricity from burning fuel (coal, oil, gas, waste) to make steam |
| Run-of-river | Hydel scheme using river flow without a large storage reservoir |
| Load-shedding | Planned power cuts when demand exceeds supply |
| Circular debt | Unpaid bills passed along the power chain, so fuel cannot be bought |
Fuel facts to quote (approximate, early-to-mid 2020s)
| Fuel | Where | Moved by | Headline fact |
|---|---|---|---|
| Coal | Thar, Lakhra, Sonda; Duki, Sor Range, Chamalang; Makarwal, Salt Range | Mostly burned at mine; trucks; rail from ports for imports | Thar about 175 billion tonnes of lignite |
| Gas | Sui, Mari, Qadirpur, Uch, Kandhkot, Sawan | Trunk pipelines (two gas companies); LPG cylinders by road | Output near 3.2 billion cubic feet a day and falling |
| Oil | Potwar fields (Khaur, Dhulian, Toot, Meyal); Badin area | Tankers to Karachi; White Oil Pipeline to Mahmood Kot; rail and road tankers | Home output a fifth or less of demand |
Always add “approximately” and a year. A figure without a date reads as a guess.
Generation mix in one line each
- Thermal: imported oil, gas and LNG, imported coal (Sahiwal, Port Qasim) and Thar coal
- Nuclear: Chashma units (Punjab) and K-2, K-3 (Karachi)
- Hydel: Tarbela, Mangla, Warsak; run-of-river Ghazi–Barotha, Neelum–Jhelum
- Wind: Jhimpir–Gharo corridor, Thatta district, Sindh
- Solar: solar parks and, since about 2022, a boom in rooftop panels
Renewables: one advantage, one drawback, one Pakistani fact
| Source | Advantage | Drawback | Pakistan link |
|---|---|---|---|
| Hydel | No fuel bill; stores irrigation water | Silting; low winter flow; people resettled | Upper Indus schemes under construction |
| Wind | No emissions; steady sea breezes | Variable; needs new grid lines | Jhimpir–Gharo corridor |
| Solar | Sunshine most of the year | No output at night; dust on panels | Rooftop growth in cities and farms |
| Wave/tidal | Long coastline | Untested, costly technology | Not yet developed |
Worked example: a part (d) style judgement
“Pakistan should spend on solar power rather than on new large dams.” Do you agree? Give reasons.
Solar can be installed quickly in small units, needs no fuel and suits scattered villages in Balochistan and Thar far from the grid. However, it produces nothing at night, and batteries are costly. Large dams such as Tarbela give cheap power for decades and also store irrigation water and reduce floods, but they take many years to build, silt up and displace people. Judgement: solar is the better short-term choice for remote areas, but dams remain necessary for irrigation, so Pakistan needs both rather than one instead of the other.
The shape: argument for, argument against, Pakistani example on each side, a clear judgement.
Exam traps
- Drawing an adit as a vertical hole. An adit goes in sideways from a hillside; a shaft goes down.
- Saying Pakistan “has no coal”. It has huge reserves; the problem is quality and location.
- Forgetting the limits of LPG. Higher cost, winter shortages and safety risk must be stated when asked how gas reaches areas off the network.
- Treating hydel as reliable all year. River flow and output drop sharply in winter.
- Quoting undated statistics. Reserve and output figures change each year.
- Listing renewables without judging them. “Evaluate” needs a conclusion.
Self-test
- Which mining method suits a thick seam near the surface?
- Name two Balochistan coal areas.
- Why is most Thar coal burned close to the mine?
- Give two limits of supplying LPG instead of piped gas.
- Name the pipeline carrying refined fuel inland from Port Qasim.
- Give two physical conditions for a multi-purpose hydel scheme.
- Why does hydel output fall in winter?
Answers: 1. Open cast. 2. Any two of Duki, Sor Range, Chamalang. 3. It is low-grade lignite with high moisture, so it is uneconomic to transport. 4. Any two of higher cost, irregular supply in winter, safety risk. 5. The White Oil Pipeline (to Mahmood Kot). 6. Any two of narrow gorge, strong impermeable rock, reliable river flow, large storage valley. 7. Snowmelt stops and rainfall is low, so river flow is reduced.
Frequently asked questions
What is the quickest way to revise the three coal-mining methods? Draw each from memory in under a minute, with four labels, then check the labels against the study guide.
Is nuclear power renewable? No. Nuclear stations use uranium, which is a finite resource, even though they emit little carbon dioxide while running.
Why is power linked to development? Industry, irrigation tubewells, hospitals, schools and telecommunications all need reliable, affordable energy, so shortages slow growth and cost jobs.
Related resources
Source: Cambridge International, Cambridge O Level Pakistan Studies 2059 syllabus for examination in 2026, Paper 2 Section 3 Power. Figures are approximate and dated.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.
Related resources
-
Study guides
Cambridge O Level Pakistan Studies: Trade (2059)
Study guide to Section 6 Trade of Cambridge O Level Pakistan Studies 2059 Paper 2: exports, imports, GNP and GDP, the balance of trade and trading partners.
Pakistan Studies · Cambridge · O Level
Read guide -
Practice questions
Cambridge O Level Pakistan Studies: Trade — Practice Questions
Two original 25-mark data questions on exports, imports, GDP, GNP and trading partners, with mark schemes, for Cambridge O Level Pakistan Studies 2059 Paper 2.
Pakistan Studies · Cambridge · O Level
Try questions -
Revision notes
Cambridge O Level Pakistan Studies: Trade — Revision Notes
Revision notes on exports, imports, GDP versus GNP, the trade deficit, partners, blocs and exchange rates for Cambridge O Level Pakistan Studies 2059 Section 6.
Pakistan Studies · Cambridge · O Level
Revise topic
Related articles
-
teaching
A Level tuition in Dubai: Cambridge or Pearson Edexcel International A Level?
Schools in Dubai and Abu Dhabi teach either Cambridge International AS & A Level or Pearson Edexcel International A Level. How the two are structured, why it matters for tuition, and how online classes from Lahore work.
9 October 2026
-
curriculum guides
Choosing subjects at IGCSE and A Level
How subject choices at 14 and 16 affect university options later, and how to keep pathways open without overloading a timetable.
28 July 2026
Studying this with a teacher
Working through Pakistan Studies O LEVELS?
This page is free and stays free. If you would rather be taught it, Marlbridge runs Pakistan Studies classes one-to-one and in small groups of up to 15, online in your own time zone. The first trial class is free. WhatsApp replies within an hour (8am–11pm Pakistan time, every day); email the same day.
Cambridge Pakistan Studies teachers at Marlbridge