Revision Notes
Cambridge IGCSE Economics: Opportunity cost and production possibility curves (0455) – Revision Notes
Condensed revision notes on opportunity cost and production possibility curves for Cambridge IGCSE Economics, with a ten-question self-test.
- Subject
- Economics
- Level
- IGCSE
- Topic
- Opportunity cost and production possibility curves
- Author
- Marlbridge Academic Team
- Updated
Aligned to Cambridge IGCSE Economics (0455), For examination in 2026. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge IGCSE Economics.
Syllabus points this page covers
0455
- 1.3 Opportunity cost
- 1.4 Production possibility curve (PPC) diagrams
Found an error? Report a correction.
Need help with this topic? Request a free trial class for IGCSE Economics (0455).
These notes condense sections 1.3 and 1.4 of the Cambridge IGCSE Economics 0455 syllabus for examination in 2026 (opportunity cost and production possibility curves). For full explanations and longer worked examples, use the study guide. Test yourself with the practice questions. Other links: the Cambridge IGCSE Economics hub, the printable checklist, the earlier unit on scarcity and the factors of production and the free diagnostics. All names and figures are invented.
1.3 Opportunity cost
Key definitions
| Term | Definition |
|---|---|
| Scarcity | Limited resources set against unlimited wants |
| Choice | Selecting one use of resources, which means rejecting others |
| Opportunity cost | The value of the best option passed up by a choice |
| Production possibility curve (PPC) | A curve showing the largest amounts of two goods an economy can make together when resources are fully and efficiently used and technology is fixed |
| Economic growth | A rise in the economy’s capacity to produce (potential output) |
Method: finding an opportunity cost
- List the options and rank them.
- Mark the one chosen.
- The opportunity cost is the next best one only.
- Say what was lost (the benefit), not just the price.
Reminder. A shop worker can spend a free day on a trip (value 12), a course (value 9) or a rest (value 5). She takes the trip. Opportunity cost = the course, valued at 9. The gap between best and next best is 12 − 9 = 3, but the opportunity cost is the course, not 3.
Who decides, and how opportunity cost matters
| Decision maker | Typical choice | Opportunity cost |
|---|---|---|
| Consumer | Which goods to buy with limited income | The next best good or saving |
| Worker | Job A or B; work or leisure; work or study | Pay, leisure or experience given up |
| Producer | Which product, location or inputs | Profit from the next best use of resources |
| Government | Health, education, defence, transport, tax levels | Services or tax cuts forgone |
Chain of reasoning (government). Budget is limited, so more on one service means less on another. This can mean longer waiting lists or fewer schools. The government should compare benefits across the options.
Chain of reasoning (worker). A higher wage makes an hour of leisure more costly in terms of income given up. Some workers therefore work longer hours. Others value time more highly and choose leisure.
Evaluation points. Non-money benefits are hard to value. Information is imperfect. Different people rank options differently. The opportunity cost of a choice may change over time.
1.4 Production possibility curve diagrams
Drawing a PPC
- Vertical axis: good A. Horizontal axis: good B. Label both.
- Plot combinations and join them with a smooth curve from one axis to the other.
- Mark the curve (PPC), and label points on it, under it and beyond it.
Sketch in words: a curve starts on the vertical axis, bows outward (concave to the origin) and ends on the horizontal axis.
Interpreting positions
| Position | Meaning |
|---|---|
| On the PPC | Full employment and efficient use of resources: maximum output |
| Under the PPC | Unemployed or inefficiently used resources: more of one good possible without losing the other |
| Beyond the PPC | Not attainable with current resources and technology |
Reminder. A small economy can produce at most 50 units of bread when it makes 30 units of tools. It produces 42 units of bread and 30 of tools.
- Shortfall = 50 − 42 = 8 units of bread.
- As a percentage of potential: 8 / 50 × 100 = 16%.
- It can reach the curve by using idle resources, at no opportunity cost.
Shape and opportunity cost
| Shape | Opportunity cost | Reason |
|---|---|---|
| Straight line | Constant | Resources suit both goods equally |
| Bowed outward | Increasing | Resources suit the goods unequally |
Method: opportunity cost of a movement.
- Read the two points.
- Find the change in the good that is gained and the change in the good that is lost.
- Divide: good lost / good gained (the opportunity cost of one unit gained).
- Name both goods in the answer.
Reminder. A straight PPC runs from 60 units of cloth to 30 units of tools. Opportunity cost of 1 tool = 60 / 30 = 2 cloth. Opportunity cost of 1 cloth = 30 / 60 = 0.5 tools.
A movement along the PPC shows a change in the mix of goods. Nothing about the economy’s capacity has changed.
Shifts in the PPC
| Shift | Meaning | Examples of causes |
|---|---|---|
| Outward (both axes) | Growth in capacity for both goods | Investment in capital, better education, new technology, more workers, new land |
| Outward (on one axis only) | Growth in capacity for one good | New technique or resource used for one good only |
| Inward | Fall in capacity | War, disaster, resource depletion, loss of workers |
Reminder. Maximum output of good A rises from 40 to 45 units. Growth = (45 − 40) / 40 × 100 = 12.5%. Maximum output of good B rises from 60 to 66. Growth = (66 − 60) / 60 × 100 = 10%. These are different percentages, so the two axes do not grow by the same proportion.
Why the curve bows outward
Moving from good A to good B first uses the resources best suited to B. As output of B rises, resources that are better at A must switch, so each extra unit of B costs more units of A. A short table shows it for an invented economy making cloth and tools.
| Tools gained | Cloth lost | Cloth lost per tool |
|---|---|---|
| 0 to 6 | 3 | 0.5 |
| 6 to 12 | 9 | 1.5 |
| 12 to 18 | 24 | 4.0 |
Actual and potential growth
| Type | Diagram | Meaning |
|---|---|---|
| Actual growth | Move from under the PPC to the PPC | Idle resources used |
| Potential growth | PPC shifts outward | Capacity increases |
Consequences of growth
- Benefits: more output per person is possible, higher incomes and tax revenue, better health and education become affordable.
- Costs: pollution, resource depletion, more unequal incomes, and investing now can mean less consumption now.
- Evaluation: growth in potential does not guarantee that resources are used, or that the extra output reaches the people who need it.
Must-know distinctions
| Pair | Difference |
|---|---|
| Money cost and opportunity cost | The price paid versus the benefit of the best alternative given up |
| Movement along and shift of a PPC | A change of mix versus a change of capacity |
| Actual and potential growth | Using idle resources versus increasing capacity |
| Under and beyond the PPC | Inefficient but possible versus impossible |
| Constant and increasing opportunity cost | Straight line versus bowed outward |
Quick self-test
- Define opportunity cost.
- Dina can buy a coat (30), boots (26) or a bag (22) with her money and buys the coat. State her opportunity cost.
- A worker gives up a job paying 1,800 a month to study full-time for 10 months. Calculate the earnings forgone.
- A farmer’s field would earn 9,000 growing barley or 7,500 growing oats. What is the opportunity cost of growing barley?
- A government has money for either a 40-unit hospital or two 20-unit schools. Calculate the opportunity cost of the hospital in schools.
- State what a point under a PPC shows.
- A PPC is a straight line between 80 units of good X and 40 units of good Y. State the opportunity cost of one unit of Y in X, and say what kind of opportunity cost it shows.
- Moving along a PPC raises good M from 10 to 14 units and lowers good N from 90 to 78. Calculate the opportunity cost of one unit of M.
- Maximum output rises from 200 to 230. Calculate the percentage growth.
- State one cause of an inward shift of a PPC and one cause of an outward shift.
Answers
- The value of the best option passed up by making a choice.
- The boots (valued at 26).
- 1,800 × 10 = 18,000.
- The 7,500 from oats, the next best use.
- 40 / 20 = 2 schools.
- Unemployed or inefficiently used resources: the economy could produce more of at least one good.
- 80 / 40 = 2 units of X per unit of Y. It is constant opportunity cost.
- Gained 14 − 10 = 4 of M. Lost 90 − 78 = 12 of N. 12 / 4 = 3 units of N per unit of M.
- (230 − 200) / 200 × 100 = 15%.
- Inward: a flood destroying farmland (or war, or loss of workers). Outward: investment in machinery (or training, or new technology).
Where marks are usually lost
- Naming the money price instead of the next best alternative.
- Giving two or more alternatives as the opportunity cost.
- Reversing the division, so the opportunity cost of the wrong good is calculated.
- Leaving out units, or naming only one of the two goods.
- Drawing a PPC that is straight when the question describes increasing cost, or without labelled axes.
- Describing a movement along the curve as economic growth.
- Placing the new curve inside the old one when showing growth.
- Giving a list of causes of growth with no link to capacity, for example “technology” with no statement of what it changes.
- Evaluation that says “it depends” without saying on what.
Official syllabus
Cambridge IGCSE Economics 0455 syllabus for examination in 2026, version 2, published by Cambridge University Press & Assessment: sections 1.3 Opportunity cost and 1.4 Production possibility curve (PPC) diagrams.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.
Related resources
-
Study guides
Cambridge IGCSE Economics: Opportunity cost and production possibility curves (0455)
Study guide to opportunity cost and production possibility curves for Cambridge IGCSE Economics, with worked calculations and evaluation.
Economics · Cambridge · IGCSE
Read guide -
Practice questions
Cambridge IGCSE Economics: Opportunity cost and production possibility curves (0455) – Practice Questions
Original practice questions with worked answers on opportunity cost and production possibility curves for Cambridge IGCSE Economics.
Economics · Cambridge · IGCSE
Try questions -
Study guides
Cambridge IGCSE Economics: Population and differences in development between countries (0455)
Study guide to population and differences in development for Cambridge IGCSE Economics, with worked calculations, pyramid reading and evaluation chains.
Economics · Cambridge · IGCSE
Read guide
Related articles
-
teaching
A Level tuition in Dubai: Cambridge or Pearson Edexcel International A Level?
Schools in Dubai and Abu Dhabi teach either Cambridge International AS & A Level or Pearson Edexcel International A Level. How the two are structured, why it matters for tuition, and how online classes from Lahore work.
9 October 2026
-
curriculum guides
Choosing subjects at IGCSE and A Level
How subject choices at 14 and 16 affect university options later, and how to keep pathways open without overloading a timetable.
28 July 2026
Studying this with a teacher
Working through Economics IGCSE?
This page is free and stays free. If you would rather be taught it, Marlbridge runs Economics classes one-to-one and in small groups of up to 15, online in your own time zone. The first trial class is free. WhatsApp replies within an hour (8am–11pm Pakistan time, every day); email the same day.
Cambridge Economics teachers at Marlbridge