4.1 Production processes

Job, batch and flow production
Job: a one-off product made to order (a custom wedding cake). Batch: a set quantity of identical items, then switch product (a tray of rolls). Flow: continuous production of identical items (a bottled-water line).
Strengths and weaknesses of batch and flow production
Batch: variety and can follow demand, but idle time at changeovers and stock waiting. Flow: low unit cost at high volume, but costly set-up, inflexible, and a fault stops everything.
Automation, computers and robotics in production
Automation: machines do tasks with little human input. Computers: control machines, plan production, hold stock and quality data. Robotics: programmable machines that weld, pack and move goods.
Benefits and drawbacks of using technology in production
Benefits: consistency, speed, lower labour cost in the long run, can work through the night. Drawbacks: high set-up and maintenance costs, technical skills needed, redundancy worries.

4.2 Quality of goods and services

Quality control versus quality assurance
Quality control finds faults, by inspecting and testing at the end or at checkpoints. Quality assurance prevents faults at every stage, through standards, training, supplier checks and fixing causes.
Why quality matters to a business (four points)
The reputation of the business; gaining and retaining customers; fewer product returns; less risk of a product recall.
A sample of 400 pens has 12 faulty. What is the reject rate?
Reject rate = faulty ÷ items checked × 100 = 12 ÷ 400 × 100 = 3%.
A shop sells 3,000 items and 2% are returned at a cost of £20 each. What is the cost of returns?
3,000 × 0.02 = 60 items returned. 60 × £20 = £1,200.

4.3 The sales process and customer service

Methods of selling: e-commerce, face to face and telesales
E-commerce: open all hours, wide market, customer data; but delivery, returns and security costs. Face to face: demonstration, advice, immediate sale; but premises cost and limited reach. Telesales: cheap and direct; but can annoy and the product is not seen.
The influence of e-commerce on business activity
Small firms can reach national and overseas markets; less need for expensive high-street premises; more data on what customers view and buy; but more competition and more returns, with extra packing and delivery costs.
Customer service, and the three features to know
The help given before, during and after a sale, important to gain and retain customers. After-sales service (updates, repairs, returns), product knowledge (staff can advise), customer engagement (listening, replying quickly, asking for feedback).

4.4 Consumer law

Consumer law: what it requires and its impact on a business
Goods must be safe, of satisfactory quality and as described; otherwise the customer may be entitled to a repair, replacement or refund. Impact: testing, honest descriptions, refund costs and staff training; good compliance builds trust and reputation.

4.5 Business location

The four factors influencing business location
Costs (rent, rates, utilities, transport), proximity to the market, labour (suitable workers at an affordable wage) and materials (how far inputs must travel). Add up each site's costs, then weigh what the numbers leave out.

4.6 Working with suppliers

The four parts of procurement
Identifying goods and services to buy; choosing suppliers; ordering goods and services; receiving deliveries from suppliers.
Impact of logistical and supply decisions on a business
Time (delays hold up production or orders), length of supply chain (more links, more delay and risk), reliability of supply (stock-outs), costs (lower prices may bring risk) and customer service (late deliveries lose trust).
Supplier P charges £5.10 a unit and supplier R £4.80. For 2,000 units, how do you choose?
P: 2,000 × £5.10 = £10,200. R: 2,000 × £4.80 = £9,600, saving £600. But if R delivers late more often, a stoppage could cost more than £600, so weigh price against reliability and quality.