Study Guides
AQA A-Level Accounting: Budgeting (7127)
Study guide to AQA A-Level Accounting section 3.9 Budgeting: functional and cash budgets, budgeted statements, variances, ZBB and incremental budgets.
- Subject
- Accounting
- Level
- A LEVELS
- Topic
- Budgeting
- Author
- Marlbridge Academic Team
- Updated
Aligned to AQA A Level Accounting (7127), 2017-onwards. Official specification .
Syllabus page (what it covers and how it is assessed): AQA A Level Accounting.
Syllabus points this page covers
7127
- 9 Budgeting (whole topic)
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Accounting (7127).
This study guide teaches section 3.9, Budgeting, of the AQA A-level Accounting (7127) specification, version 1.1 (October 2026), for A-level exams from June 2019 onwards. The qualification is linear and untiered. Section 3.9 is examined on Paper 2, which assesses sections 1–3, 8–13 and 17–18. Budgeting is management accounting: forward-looking information for managers, as set out in the role of the accountant. All businesses and figures below are invented.
Course links: AQA A-level Accounting hub and the printable checklist. Afterwards, condense the topic with the revision notes, test yourself with the practice questions, and find your weak spots with the free diagnostics.
What this topic covers
| Spec content (3.9) | What you must be able to do |
|---|---|
| The need for budgeting in business organisations | Explain the purpose of budgeting |
| The benefits and limitations of budgeting and budgetary control | Evaluate budgeting in general and specific budgets, including zero-based and incremental budgeting |
| The use of accounting techniques in the preparation and analysis of budgets | Prepare cash, sales, purchases, production and labour budgets, a budgeted income statement and a budgeted statement of financial position |
| How budgets are used in planning and control | Calculate and interpret variances between budgeted and actual results |
Why businesses budget
A budget is a plan for a future period, expressed in money and quantities. Budgetary control compares actual results with the budget, finds the differences (variances), and acts on them.
Budgeting serves several purposes:
- Planning. Managers think ahead about sales, costs and cash before committing resources.
- Co-ordination. The sales, production, purchasing and personnel plans must fit together.
- Communication. Each manager learns what is expected of their department.
- Control. Actual results can be checked against a target, so problems show up early.
- Motivation and responsibility. Each budget has a budget holder who answers for it.
- Performance evaluation. Variances show which managers met their targets.
Budgets are prepared in an order. The principal budget factor (often sales demand) limits activity, so its budget comes first. The sales budget drives the production budget, which drives the materials purchases and labour budgets. All of these feed the cash budget, then the budgeted income statement and budgeted statement of financial position. Together these form the master budget.
Sales, production, purchases and labour budgets
Worked example 1: Thornby Benches
Thornby Benches makes garden benches. Sales forecast: April 400, May 500, June 600, July 550 benches, at £120 each. Closing inventory of finished benches is 20% of the next month’s sales. Each bench uses 2 kg of resin at £5 per kg. Closing resin inventory is 25% of the next month’s usage, and July production is planned at 560 benches. Each bench takes 1.5 labour hours at £14 per hour.
Sales budget (units × price): April £48 000, May £60 000, June £72 000.
Production budget (units). Production = sales + closing inventory − opening inventory.
| April | May | June | |
|---|---|---|---|
| Sales | 400 | 500 | 600 |
| Add closing inventory (20% of next month) | 100 | 120 | 110 |
| Less opening inventory | (80) | (100) | (120) |
| Production | 420 | 520 | 590 |
April’s opening inventory is 20% of April’s sales (80), because March closed on the same policy. Each month’s closing inventory becomes the next month’s opening inventory. Likewise April’s opening resin is 25% × 840 = 210 kg.
Materials purchases budget. Usage is production × 2 kg: April 840, May 1 040, June 1 180, July 1 120 kg.
| April | May | June | |
|---|---|---|---|
| Usage (kg) | 840 | 1 040 | 1 180 |
| Add closing inventory (25% of next month’s usage) | 260 | 295 | 280 |
| Less opening inventory | (210) | (260) | (295) |
| Purchases (kg) | 890 | 1 075 | 1 165 |
| Purchases at £5 per kg | £4 450 | £5 375 | £5 825 |
Labour budget. Hours = production × 1.5: April 630, May 780, June 885. Cost at £14: April £8 820, May £10 920, June £12 390, a quarter total of £32 130.
The labour budget shows whether the workforce can deliver the plan. If normal hours available are fewer than hours needed, the budget must include overtime (at a premium rate), new recruits or reduced output.
The cash budget
A cash budget shows expected receipts and payments month by month, and the bank balance at the end of each month. It records cash flows only. Depreciation, irrecoverable debts written off and provisions never appear, because no cash moves. Capital receipts and payments (loans received, new non-current assets, capital introduced, drawings) do appear.
Worked example 2: Tate Tiles (sole trader)
Rhian Tate’s budgeted sales: May £30 000, June £32 000, July £36 000, August £40 000, September £38 000. 25% of sales are for cash. Of credit sales, 60% are received the month after the sale and 40% two months after. Purchases are 60% of each month’s sales and are paid the following month. Wages: £5 200 in July and August, £5 600 in September. Rent of £4 500 for the quarter is paid in July. General expenses are £1 800 a month. A delivery van costing £15 000 is paid for in August. Drawings are £2 500 a month. The bank balance on 1 July is £3 200.
Step 1: receipts schedule (July shown; August and September follow the same pattern).
July: cash sales 25% × 36 000 = 9 000
June credit sales 75% × 32 000 × 60% = 14 400
May credit sales 75% × 30 000 × 40% = 9 000
32 400
Step 2: the cash budget.
| £ | July | August | September |
|---|---|---|---|
| Receipts | 32 400 | 35 800 | 38 300 |
| Payments to suppliers | 19 200 | 21 600 | 24 000 |
| Wages | 5 200 | 5 200 | 5 600 |
| Rent | 4 500 | – | – |
| General expenses | 1 800 | 1 800 | 1 800 |
| Delivery van | – | 15 000 | – |
| Drawings | 2 500 | 2 500 | 2 500 |
| Total payments | 33 200 | 46 100 | 33 900 |
| Opening balance | 3 200 | 2 400 | (7 900) |
| Net cash flow | (800) | (10 300) | 4 400 |
| Closing balance | 2 400 | (7 900) | (3 500) |
Brackets show an overdraft. The budget warns Rhian, two months ahead, that the van purchase will push the account £7 900 overdrawn. She can arrange an overdraft facility or a loan, delay the van, or reduce drawings. That early warning is the main benefit of a cash budget.
Budgeted financial statements
The budgeted income statement uses the accruals basis, so it differs from the cash budget. On 1 July Tate Tiles had equipment (cost £60 000, accumulated depreciation £18 000), inventory £8 000, trade receivables £33 000, trade payables £19 200, bank £3 200 and capital £67 000. Equipment is depreciated at 10% a year on cost; the van at 20% a year on cost, from August. Inventory stays at £8 000 because each month’s purchases equal that month’s cost of sales.
Budgeted income statement for the quarter ending 30 September
| £ | £ | |
|---|---|---|
| Revenue (36 000 + 40 000 + 38 000) | 114 000 | |
| Cost of sales (60%) | (68 400) | |
| Gross profit | 45 600 | |
| Wages | 16 000 | |
| Rent | 4 500 | |
| General expenses | 5 400 | |
| Depreciation: equipment (60 000 × 10% × 3/12) | 1 500 | |
| Depreciation: van (15 000 × 20% × 2/12) | 500 | (27 900) |
| Profit for the period | 17 700 |
Budgeted statement of financial position at 30 September
| £ | £ | |
|---|---|---|
| Equipment (60 000 − 19 500) | 40 500 | |
| Van (15 000 − 500) | 14 500 | |
| Non-current assets | 55 000 | |
| Inventory | 8 000 | |
| Trade receivables (75% × 38 000 + 75% × 40 000 × 40%) | 40 500 | 48 500 |
| Trade payables (September purchases) | 22 800 | |
| Bank overdraft (from the cash budget) | 3 500 | (26 300) |
| Net assets | 77 200 | |
| Capital: 67 000 + 17 700 profit − 7 500 drawings | 77 200 |
Notice the link: a profit of £17 700, yet the bank moves from £3 200 in hand to a £3 500 overdraft. The van, drawings and growing trade receivables absorb the cash.
Budgetary control and variances
A variance is the difference between a budgeted and an actual figure.
- Favourable (F): actual profit higher than budget, i.e. revenue above budget or a cost below it.
- Adverse (A): actual profit lower than budget, i.e. revenue below budget or a cost above it.
Comparing actual results with the original (fixed) budget misleads when output differs, because variable costs rise with volume. A flexed budget recalculates revenue and variable costs at the actual output, with fixed costs unchanged. Variances against the flexed budget show efficiency and pricing; the gap between the flexed and fixed budget profit shows the effect of volume.
Worked example 3: Ridley Lamps
Budget: 2 000 lamps at £60, materials £18 and labour £12 per lamp, fixed overheads £30 000. Actual output and sales were 2 200 lamps.
| £ | Fixed budget | Flexed budget (2 200) | Actual | Variance (flexed v actual) |
|---|---|---|---|---|
| Revenue | 120 000 | 132 000 | 128 700 | 3 300 A |
| Materials | 36 000 | 39 600 | 41 250 | 1 650 A |
| Labour | 24 000 | 26 400 | 25 960 | 440 F |
| Fixed overheads | 30 000 | 30 000 | 31 100 | 1 100 A |
| Profit | 30 000 | 36 000 | 30 390 | 5 610 A |
Reconciliation: budgeted profit £30 000 + volume variance £6 000 F (36 000 − 30 000) − flexed variances £5 610 A = actual profit £30 390.
Interpretation: on the fixed budget, profit is only £390 F and materials look £5 250 A, which hides the real story. Selling 200 more lamps added £6 000 of profit, but that gain was almost wiped out. The selling price averaged £58.50, not £60, perhaps a discount used to win the extra sales. Materials cost £18.75 a lamp instead of £18, through a supplier price rise or more wastage. Labour was efficient. Managers should investigate the large adverse items first and ask whether they are controllable. Section 3.11 splits these variances further into price and usage, rate and efficiency.
Benefits and limitations of budgeting
Generic benefits: planning, co-ordination, a basis for control and appraisal, clear responsibility, and motivation when targets are agreed and achievable.
Generic limitations: budgets rely on forecasts that may be wrong; preparation takes time and money; rigid budgets can stop managers reacting to change; imposed or unrealistic targets demotivate; managers may build in budgetary slack (padding costs) or spend up to the limit to protect next year’s allocation; departments may chase their own budget at the expense of the whole business.
Specific budgets:
- Cash budget: shows shortages early so finance can be arranged; but timing assumptions (when customers pay) are uncertain.
- Sales budget: sets the activity level for every other budget; any error flows through them all.
- Production budget: plans capacity and inventory levels; less useful where demand is volatile.
- Purchases budget: avoids stock-outs and excess inventory; prices may change.
- Labour budget: shows overtime or recruitment needs early; ignores staff absence and productivity changes unless built in.
- Budgeted income statement and statement of financial position: show whether the plans give an acceptable profit and financial position; only as reliable as every budget beneath them.
Incremental and zero-based budgeting
Incremental budgeting takes last period’s budget or actual figures and adjusts them, for example by adding inflation. It is quick, cheap and stable. But it carries forward past inefficiency, assumes existing activities are still worth doing, and encourages “spend it or lose it”.
Zero-based budgeting (ZBB) starts every budget from zero: each activity and every pound must be justified as if it were new. It removes waste and links spending to current objectives. But it is slow and costly, needs skilled managers, and may favour activities with easily measured benefits. Many businesses use ZBB periodically, or only for discretionary costs such as marketing and training, and incremental budgeting otherwise.
Common errors
- Putting depreciation or irrecoverable debts in a cash budget.
- Forgetting that this month’s closing inventory is next month’s opening inventory.
- Applying a credit percentage to total sales when only part of sales is on credit.
- Labelling a cost below budget as adverse; a lower cost is favourable.
- Comparing actual with the fixed budget when output differs, without flexing.
- Treating the cash budget closing balance as profit.
Official syllabus
AQA A-level Accounting (7127) specification, version 1.1, October 2026, A-level exams June 2019 onwards (AQA), section 3.9 Budgeting.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.
Related resources
-
Practice questions
AQA A-Level Accounting: Budgeting (7127) – Practice Questions
Original practice questions with worked answers for AQA A-Level Accounting 7127 section 3.9: functional, cash and master budgets, variances and ZBB.
Accounting · AQA · A Level
Try questions -
Revision notes
AQA A-Level Accounting: Budgeting (7127) – Revision Notes
Revision notes for AQA A-Level Accounting 7127 Budgeting: budget formulas, cash budget steps, flexed budget variances and a quick self-test.
Accounting · AQA · A Level
Revise topic -
Practice questions
AQA A Level Accounting: Types of Business Organisation — Practice Questions
Original exam-style practice questions with full worked answers on the four business ownership types, their benefits, risks and reporting requirements, and sources of finance for AQA A-Level Accounting (7127), Topic 3.2.
Accounting · AQA · A Level
Try questions
Related articles
-
teaching
A Level tuition in Dubai: Cambridge or Pearson Edexcel International A Level?
Schools in Dubai and Abu Dhabi teach either Cambridge International AS & A Level or Pearson Edexcel International A Level. How the two are structured, why it matters for tuition, and how online classes from Lahore work.
9 October 2026
-
curriculum guides
Choosing subjects at IGCSE and A Level
How subject choices at 14 and 16 affect university options later, and how to keep pathways open without overloading a timetable.
28 July 2026
Studying this with a teacher
Working through Accounting A LEVELS?
This page is free and stays free. If you would rather be taught it, Marlbridge runs Accounting classes one-to-one and in small groups of up to 15, online in your own time zone. The first trial class is free. WhatsApp replies within an hour (8am–11pm Pakistan time, every day); email the same day.
AQA Accounting teachers at Marlbridge