Skip to content
Marlbridge

Revision Notes

AQA A-Level Computer Science (7517): Aspects of Software Development – Revision Notes

Condensed AQA 7517 section 4.13.1 recall: analysis, design, implementation, testing and evaluation, prototyping and agile, and normal, boundary and erroneous test data.

Level
A LEVELS
Topic
Systematic approach to problem solving
Updated

Aligned to AQA A Level Computer Science (7517), 2015-onwards. Official specification .

Syllabus page (what it covers and how it is assessed): AQA A Level Computer Science.

Syllabus points this page covers

7517

  • 4.13.1 Aspects of software development

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Computer Science (7517).

Condensed recall for 4.13.1 Aspects of software development, AQA A-Level Computer Science (7517): analysis, design, implementation, testing and evaluation. A worked design and test plan are in the aspects of software development study guide; questions are in the aspects of software development practice questions.

The five stages

Stage Key points
Analysis Define the problem; establish requirements by interacting with the intended users; create a data model; use abstraction; prototyping or agile can clarify requirements
Design Plan data structures; design algorithms; design a modular structure with clear documented interfaces; design the human user interface; can be iterative (prototyping or agile)
Implementation Turn models and algorithms into data structures and code; write, debug and test; argue for correctness and efficiency with logical reasoning, test data and user feedback; iterative, solving the critical path first
Testing Test for errors with selected normal, boundary and erroneous data; acceptance testing with the intended users
Evaluation Judge the solution against criteria for evaluating a computer system

The stages can loop back: testing may expose a design fault.

Analysis detail

  • Requirements come from users: interviews, questionnaires, observation, existing documents.
  • Abstraction: keep the details that matter, ignore the rest.
  • Data model: entities, attributes and relationships.
  • Prototype: an early version that users react to, revealing needs they could not describe.

Design detail

  • Module: a subroutine with a clear, documented interface (inputs, outputs, purpose).
  • Benefits of a modular structure: modules can be written and tested separately, reused, and shared between programmers; the program is easier to maintain.
  • User interface: layout, navigation, validation, messages, accessibility.
Module Inputs Output
calculateFine(daysLate) integer decimal, 0.20 × days, capped at 5.00

Implementation detail

  • Meaningful names and comments.
  • Test each module as it is finished and debug it.
  • Critical path first: build the parts everything depends on, or that carry most risk, first.

Test data

Type Meaning Example (age accepted from 11 to 18)
Normal Valid, typical data 15
Boundary At the edge of what is valid, and just outside 11, 18 (valid); 10, 19 (invalid)
Erroneous Invalid data that should be rejected “abc”, −5
  • Always give the expected result with each test, before running it.
  • Acceptance testing: the intended users check that the system meets its specification.

Check (fine capped at 5.00, 20p a day): the cap is reached at 5.00 ÷ 0.20 = 25 days. Boundary tests: 24 days gives 4.80, 25 gives 5.00, 26 gives 5.00.

Evaluation criteria (commonly used)

Criterion Question
Meets requirements Does it do everything in the analysis?
Usability Is it easy to learn and use?
Robustness Does it cope with invalid or unexpected input?
Efficiency Does it use time, memory and storage sensibly?
Maintainability Can it be understood and changed later?

Use evidence (test results, user feedback), note limitations, and suggest improvements.

Prototyping and agile

Prototyping Agile
Idea Build an early version for feedback Short cycles delivering working parts
Strength Clarifies requirements; users see something early Copes with change; frequent user contact
Weakness May be mistaken for the finished product Scope and cost less certain; documentation can slip

Key terms

Term Definition
Requirement A statement of what the system must do
Abstraction Removing detail that is not relevant to the problem
Data model A description of the data and its relationships
Module A self-contained part of a program with a defined interface
Interface The inputs, outputs and purpose of a module
Prototype An early working version used to get feedback
Critical path The parts of the work on which everything else depends
Acceptance testing Testing by the intended users that the system meets its specification
Boundary data Test data at the limits of the valid range
Erroneous data Invalid test data that should be rejected

Exam traps

  • The process is iterative, not a one-way line.
  • Requirements come from the users.
  • Every test needs an expected result.
  • Boundary is not the same as erroneous.
  • Give normal, boundary and erroneous data in a test plan.
  • Acceptance testing is by the user.
  • Evaluate with evidence against stated criteria.

Self-test

  1. Name the five stages.
  2. How are requirements established?
  3. What is abstraction?
  4. What is a modular structure?
  5. Name three kinds of test data.
  6. Give a boundary value for a mark accepted from 0 to 100.
  7. Give an erroneous value for the same input.
  8. What is acceptance testing?
  9. What does “critical path first” mean?
  10. Name two criteria for evaluating a system.
  11. Give one strength of an agile approach.
  12. Why must an expected result be stated for each test?

Answers

  1. Analysis, design, implementation, testing, evaluation.
  2. By interaction with the intended users, for example interviews, questionnaires and observation.
  3. Keeping the details relevant to the problem and ignoring the rest.
  4. A program divided into modules with clear, documented interfaces.
  5. Normal, boundary and erroneous.
  6. 0 or 100 (also 101 or −1 just outside).
  7. For example “abc” or −20.
  8. Testing by the intended users that the system meets its specification.
  9. Build first the parts everything else depends on, or that carry most risk.
  10. Any two of: meets requirements, usability, robustness, efficiency, maintainability.
  11. For example: copes with changing requirements; users see working parts early.
  12. Otherwise there is nothing to compare the actual result with, so an error cannot be recognised.

More resources on this topic

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.