Practice Questions
Cambridge A Level Business (9609): Operations strategy – Practice Questions
Original practice questions with mark-scheme answers on flexibility, ERP, lean production and critical path analysis for Cambridge A Level Business 9609 9.3.
- Subject
- Business
- Level
- A LEVEL
- Topic
- Operations management
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Salman Ahmad (what this means)
Aligned to Cambridge A Level Business (9609), For examination in 2026, 2027 and 2028. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge A Level Business.
Syllabus points this page covers
9609 (A Level)
- 9.3 Operations strategy
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Business (9609).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.
These questions cover section 9.3 Operations strategy of the Cambridge International AS & A Level Business 9609 syllabus for examination in 2026, 2027 and 2028. Revise first with the operations strategy study guide and the operations strategy revision notes. More questions are in the quality management and operations strategy practice.
All businesses are invented. Money is in dollars.
Section A
1. Define process innovation. [2]
2. Explain what is meant by flexibility of specification, with an example. [3]
3. Identify two main features of an enterprise resource planning (ERP) programme. [2]
4. Explain one link between lean production and the role of employees. [3]
5. Explain the difference between total float and free float. [4]
6. Explain how the availability of finance might influence a decision to automate a production line. [3]
Section B
7. Oakhurst Builders is planning a garden office project. Durations are in days.
| Activity | Follows | Duration |
|---|---|---|
| P | – | 2 |
| Q | P | 4 |
| R | P | 3 |
| S | Q | 5 |
| T | Q and R | 2 |
| U | S and T | 3 |
The network has nodes 1 to 6. P runs from 1 to 2, Q from 2 to 3, R from 2 to 4, a dummy from 3 to 4, S from 3 to 5, T from 4 to 5 and U from 5 to 6.
(a) Explain why the dummy activity is needed. [2]
(b) Calculate the earliest start time and latest finish time for each node. [4]
(c) State the critical path and the minimum project duration. [2]
(d) Calculate the total float and free float for activities R and T. [4]
8. Ilford Snacks is considering an ERP programme costing $300,000 to install. It is expected to reduce inventory holding costs by $55,000 a year and administration costs by $30,000 a year. Running costs are $25,000 a year.
(a) Calculate the payback period of the ERP programme. [3]
(b) Analyse how ERP could improve Ilford’s efficiency in two of the areas named in the syllabus. [6]
9. Halden Motors assembles electric scooters. It holds four weeks of components in its warehouse. A consultant recommends JIT manufacturing with deliveries twice a day. Most components come from one overseas supplier, and shipping delays have occurred twice this year. Evaluate whether Halden should adopt JIT manufacturing. [12]
10. Wren Bridal makes made-to-measure wedding dresses. Demand peaks strongly in spring and summer. Assess whether Wren should give a higher priority to flexibility than to lean production. [10]
11. Calver Bakeries has been asked by a supermarket chain to supply bread overnight, seven days a week. Calver currently works one day shift. Analyse how the availability of human and finance resources will influence Calver’s decision. [6]
Answers
1. Changing current processes or adopting new ways of producing products or delivering services [1], for example to cut costs or improve speed or quality [1].
2. The ability to change the design or features of a product to meet a customer’s needs [1] without large delays or costs [1], for example a furniture maker producing a sofa in the fabric and size each customer chooses [1].
3. Any two: one shared database [1]; linked modules for different functions [1]; real-time updating; automatic data transfer; reporting tools.
4. Lean production gives employees responsibility for quality and improvement [1], for example through kaizen suggestions and quality circles [1], so they need to be multi-skilled and involved rather than simply following instructions [1].
5. Total float is the time an activity can be delayed without delaying the whole project [1] [1]. Free float is the time it can be delayed without delaying the start of the next activity [1] [1].
6. Automation needs a large capital outlay [1]. If the business lacks retained profit or cannot borrow on acceptable terms, it may delay or choose a cheaper, partial automation [1], or lease the equipment, which affects how quickly productivity gains are achieved [1].
7. (a) T needs both Q and R to be finished, but S needs only Q [1]. The dummy shows that T depends on Q without making S depend on R [1].
(b) EST: node 1 = 0, node 2 = 2, node 3 = 6, node 4 = 6 (larger of 2 + 3 = 5 and 6 + 0 = 6), node 5 = 11 (larger of 6 + 5 = 11 and 6 + 2 = 8), node 6 = 14 [1] [1]. LFT: node 6 = 14, node 5 = 11, node 4 = 9, node 3 = 6 (smaller of 11 − 5 = 6 and 9 − 0 = 9), node 2 = 2 (smaller of 6 − 4 = 2 and 9 − 3 = 6), node 1 = 0 [1] [1].
(c) Critical path: P, Q, S, U [1]. Minimum duration = 2 + 4 + 5 + 3 = 14 days [1].
(d) R: total float = 9 − 2 − 3 = 4 [1]; free float = 6 − 2 − 3 = 1 [1]. T: total float = 11 − 6 − 2 = 3 [1]; free float = 11 − 6 − 2 = 3 [1]. [12]
8. (a) Net annual saving = 55,000 + 30,000 − 25,000 = $60,000 [1]. Payback = 300,000 ÷ 60,000 [1] = 5 years [1].
(b) Inventory control: live stock data and automatic re-ordering [1] mean Ilford holds less stock of ingredients and packaging [1], cutting holding costs and waste of out-of-date stock, as the $55,000 saving suggests [1]. Management information: all departments share one database [1], so managers see orders, costs and stock in real time [1] and can make faster pricing and production decisions with fewer errors [1]. [9]
9. For JIT: four weeks of components ties up working capital and warehouse space [1]; JIT would release cash and cut holding costs [1], and reduce the risk of components becoming obsolete as scooter designs change [1]. Against: twice-daily deliveries from one overseas supplier are risky [1]; shipping delays have already occurred twice this year [1], and under JIT any delay would stop assembly [1], causing lost sales and idle workers [1]. JIT also needs very reliable quality, as there is no buffer stock to replace faulty parts [1]. Alternatives: find a local supplier, or keep a smaller safety stock while moving towards JIT [1]. Judgement: Halden should not adopt full JIT now [1], because reliance on one distant supplier with a record of delays makes the risk of stopping production too high [1]; it should first reduce supplier risk, then move gradually [1]. [12]
10. Flexibility matters: each dress is made to measure, so flexibility of specification is essential to meet customer expectations [1] [1]. Demand peaks in spring and summer, so Wren needs volume flexibility, such as temporary skilled staff or overtime [1], or it will lose orders at its busiest time [1]. Delivery-time flexibility matters because wedding dates cannot move [1]. Lean production still has value: reducing waste of expensive fabric [1] and using kaizen to speed up fitting processes [1]. But lean’s high capacity utilisation leaves little slack for peaks [1], and JIT is risky when a missing fabric would delay a fixed wedding date [1]. Judgement: Wren should prioritise flexibility, because its premium, customised product and fixed deadlines make responsiveness the source of value, while applying lean ideas to reduce fabric waste [1]. [10]
11. Human: overnight production needs a night shift, so Calver must recruit or move bakers [1]; night work may be hard to recruit for and may need higher pay [1], so if skilled bakers cannot be found, quality and reliability suffer and the supermarket contract could be lost [1]. Finance: extra staff, ingredients and possibly delivery vehicles must be paid for before the supermarket pays [1], straining working capital [1], so Calver may need an overdraft or may be unable to accept the order unless finance is arranged [1]. [6]
Where marks are usually lost
- Leaving out the zero-duration dummy when calculating the forward pass.
- Taking the smaller value on the forward pass.
- Forgetting running costs when calculating the payback period of new systems.
- Evaluating JIT without referring to supplier reliability in the case.
- Treating lean production and flexibility as the same thing.
Related resources
-
Revision notes
Cambridge A Level Business (9609): Operations strategy – Revision Notes
Condensed revision notes for Cambridge A Level Business 9609 section 9.3: resources, IT and AI, flexibility, ERP, lean production and CPA with floats.
Business · Cambridge · A Level
Revise topic -
Study guides
Cambridge A Level Business (9609): Quality management
In-depth guide to section 9.2 Quality management in Cambridge A Level Business 9609: customer expectations, cost of quality, QC, QA, TQM and benchmarking.
Business · Cambridge · A Level
Read guide -
Practice questions
Cambridge A Level Business (9609): Quality management – Practice Questions
Original practice questions with mark-scheme answers on quality control, quality assurance, TQM and benchmarking for Cambridge A Level Business 9609 9.2.
Business · Cambridge · A Level
Try questions
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.