Practice Questions
Cambridge O Level Commerce (7100): Global supply chain management – Practice Questions
Original questions with full answers on Cambridge O Level Commerce 7100 sub-topic 3.2: supply chain types, benefits, cost sums, risks and risk assessment.
- Subject
- Commerce
- Level
- O LEVELS
- Topic
- Topic 3: Globalisation of trade
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Salman Ahmad (what this means)
Aligned to Cambridge O Level Commerce (7100), 2026-2028. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge O Level Commerce.
Syllabus points this page covers
7100
- 3.2 Global supply chain management
This page covers 1 of the 2 subtopics in topic 3, Globalisation of trade.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for O Level Commerce (7100).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs. Use these alongside the official past papers available from your board.
Related: Global supply chain management study guide and Global supply chain management revision notes
Section A
1. Identify the links in a simple supply chain. [3]
2. State what is meant by upstream in a supply chain. [1]
3. State two benefits of global supply chain management. [2]
4. Name two types of risk to a global supply chain. [2]
5. State what is meant by risk assessment. [1]
Section B
6. A company needs 25,000 units of a part each year. Home production costs $4.80 per unit. An overseas supplier charges $3.10 per unit. Shipping and customs add $0.65 per unit.
(a) Calculate the cost per unit when the part is bought overseas. [1]
(b) Calculate the total saving per year by buying overseas. [3]
(c) Explain one risk that the company should consider before changing supplier. [2]
7. Describe the difference between a simple and a complex supply chain. [3]
8. A toy company designs toys, buys plastic from a supplier and sells the toys to shops through a distributor. Identify one upstream, one enterprise and one downstream activity. [3]
9. Explain why suppliers are important to a business. [3]
10. A clothing company buys cotton from a country where a river flood destroys the harvest. Name the type of risk and explain two effects on the business. [4]
11. A supplier is found to be using child labour. Name the type of risk and explain one effect on the business that buys from it. [3]
12. Explain two actions a business can take after a risk assessment to reduce the chance of supply problems. [4]
13. Discuss whether a small furniture business should buy its wood from an overseas supplier rather than a local one. [6]
Answers
1. Supplier [1], manufacturer [1], consumer [1].
2. The suppliers and activities that come before the business, such as sourcing raw materials and components [1].
3. Any two from: lower cost of production; lower labour costs; lower cost of purchasing; advancement in logistics; advancement in communication [1 each].
4. Any two from: environmental; natural disasters; financial; ethical; technological; political [1 each].
5. Identifying the risks, judging how likely and how serious they are, and deciding what to do about them [1].
6. (a) 3.10 + 0.65 = $3.75 [1].
(b) Saving per unit = 4.80 − 3.75 = $1.05 [1]. Total saving = 1.05 × 25,000 [1] = $26,250 [1].
(c) Any one developed: delivery could be delayed by distance or bad weather [1], so production could stop [1]; the supplier could fail or the exchange rate could change [1], so the cost could rise [1]; a political change such as a new tariff [1] could remove the saving [1].
7. A simple supply chain has few links, supplier, manufacturer and consumer [1]. A complex supply chain has more links, supplier, agent, wholesaler, retailer and consumer [1]. Each extra link adds cost, but also does a job such as finding customers or breaking bulk [1].
8. Upstream: buying plastic from the supplier [1]. Enterprise: designing or making the toys [1]. Downstream: distribution to shops or selling in shops [1].
9. They provide the materials, parts or services the business needs [1]. Reliable suppliers deliver on time and in good quality, so production can continue and goods are not faulty [1]. If a supplier fails, production may stop and customers are let down [1]. Accept: fair prices and credit terms help the business’s costs.
10. Natural disaster [1]. The business may not be able to buy cotton, so production stops or slows [1]. It may have to buy from another supplier at a higher price, so costs rise [1]. Maximum 4 (accept late deliveries and lost sales).
11. Ethical risk [1]. When customers find out, they may stop buying from the business [1], so it loses sales and its reputation is damaged [1].
12. Any two developed: use more than one supplier [1] so that if one fails the other can supply [1]; hold extra stock [1] so production can continue during a delay [1]; buy insurance [1] to cover losses from disasters [1]; choose suppliers in stable countries [1] to reduce the chance of political problems [1]. Maximum 4.
13. Any six from: overseas may be cheaper because wood or labour costs are lower [1]; may offer a wider choice of wood types [1]; the business may get bulk discounts [1]; but shipping and customs add to the cost [1]; delivery takes longer, so stock may run out [1]; risks include floods, exchange rate changes and political problems [1]; a local supplier is more reliable and easier to visit [1]; a justified conclusion, for example using a local supplier for urgent orders and an overseas supplier for bulk wood [1]. Maximum 6.
Where marks are usually lost
- Question 1: adding a wholesaler or retailer to the simple chain.
- Question 6(b): forgetting to include the shipping and customs cost.
- Question 8: placing the distributor upstream.
- Question 10: naming the risk as “environmental” because a river is involved. A flood is a natural disaster.
- Question 11: not naming the type or giving the effect only.
- Question 13: only one side of the argument and no conclusion.
Quick reference for checking your answers
| Item | Key point |
|---|---|
| Simple chain | Supplier, manufacturer, consumer |
| Complex chain | Supplier, agent, wholesaler, retailer, consumer |
| Risks | Environmental, natural disasters, financial, ethical, technological, political |
Related resources
-
Revision notes
Cambridge O Level Commerce: Commercial Operations — Revision Notes (7100)
Recall notes for Cambridge O Level Commerce 7100 Topic 2: enterprise types, multinationals, franchises, outsourcing, retail, wholesale and communication.
Commerce · Cambridge · O Level
Revise topic -
Revision notes
Cambridge O Level Commerce (7100): Global supply chain management – Revision Notes
Revision notes for Cambridge O Level Commerce 7100 sub-topic 3.2: types of global supply chain, features, benefits, six types of risk and why risk assessment matters.
Commerce · Cambridge · O Level
Revise topic -
Study guides
Cambridge O Level Commerce (7100): International trade
Study guide to Cambridge O Level Commerce 7100 sub-topic 3.1: benefits and challenges of international trade, Balance of Trade and Balance of Payments sums, free trade, trading blocs, tariffs, quotas, embargoes and support for exporters.
Commerce · Cambridge · O Level
Read guide
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.