Practice Questions
Cambridge O Level Environmental Management (5014): Extraction of rocks, ores and minerals – Practice Questions
Original 5014 practice questions with mark-scheme answers on ores, mining methods, ore grade data, the decision to mine, impacts and restoring land.
- Subject
- Environmental Management
- Level
- O LEVELS
- Topic
- Topic 1 – Natural resources
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to Cambridge O Level Environmental Management (5014), 2027-2029. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge O Level Environmental Management.
Syllabus points this page covers
5014
- 1.2 Extraction of rocks, ores and minerals
Found an error? Report a correction.
Need help with this topic? Request a free trial class for O Level Environmental Management (5014).
These questions test every learning outcome in sub-topic 1.2 Extraction of rocks, ores and minerals of the 2027-2029 Cambridge O Level Environmental Management (5014) syllabus. All places and figures are invented.
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs — examination boards hold copyright in their own papers. Use these alongside the official past papers available free from your board.
Related: extraction study guide | extraction revision notes
Section A
1. Define an ore. [1]
2. Name two methods of subsurface extraction. [2]
3. State what is meant by overburden. [1]
4. Identify the extraction method that uses bacteria. [1]
5. State three types of pollution that a quarry can cause. [3]
Section B
6. Describe how phytomining is used to recover metal from mine waste. [4]
7. Explain why strip mining is suitable for a coal seam lying 20 m below flat farmland, but shaft mining is needed for a seam 800 m deep. [4]
8. A company has found a tin deposit in a remote, mountainous area with very heavy seasonal rainfall. Explain how three factors in the syllabus could affect its decision to extract the tin. [6]
9. Invented data. The table shows two copper deposits.
| Deposit X | Deposit Y | |
|---|---|---|
| Mass of ore (tonnes) | 400 000 | 1 500 000 |
| Ore grade (% copper) | 2.0 | 0.5 |
(a) Calculate the mass of copper in each deposit.
(b) Calculate the mass of waste rock left after the copper is removed from Deposit Y.
(c) Explain why Deposit Y would cause greater problems with waste management. [6]
10. A large open-pit mine opens next to a rural village. Describe and explain two economic and two environmental impacts on the village. [8]
11. Describe how bioremediation and tree planting can help restore land damaged by mining. [4]
12. Discuss the benefits and limitations of using a worked-out quarry as a landfill site. [6]
Answers
1. Rock containing minerals and metals [1].
2. Deep mining [1]; shaft mining [1].
3. The soil and rock lying above a deposit [1].
4. Bioleaching [1].
5. Any three: air [1]; land [1]; noise [1]; visual [1]; water [1].
6. Any four:
- Plants that absorb metal compounds through their roots are grown on the mine waste [1].
- The metal compounds build up in the plants as they grow [1].
- The plants are harvested [1].
- They are burned [1].
- The metal is extracted from the ash [1].
7. Any four:
- At 20 m the overburden is thin, so it is cheap to remove [1].
- The flat, near-horizontal seam can be uncovered in long strips [1].
- Surface extraction is cheaper and safer for workers and recovers more coal [1].
- At 800 m there is far too much overburden to remove economically [1].
- A vertical shaft must be sunk and tunnels dug to reach the seam [1].
8. Three factors, each named [1] and explained in this context [1], for example:
- Accessibility and terrain: steep mountains and no roads [1] mean roads must be built and machinery transported, raising costs [1].
- Climate: heavy rainfall [1] can flood pits and stop work for part of the year, cutting income [1].
- Quantity and quality (ore grade): if the deposit is large and high-grade [1], it may still make a profit despite the high costs [1].
- Cost and profit: high costs of access and flood control [1] mean extraction only goes ahead if the tin price is high enough [1].
- Environmental impact assessment: steep slopes and heavy rain increase the risk of landslides and polluted run-off [1], so permission could be refused or conditions set [1].
9. (a) X: 2.0 / 100 x 400 000 = 8000 tonnes [1]. Y: 0.5 / 100 x 1 500 000 = 7500 tonnes [1].
(b) 1 500 000 - 7500 = 1 492 500 tonnes [1].
(c) Any three:
- Y has a lower ore grade, so much more rock must be mined for each tonne of copper [1].
- Y leaves far more waste rock: 1 492 500 tonnes against 392 000 tonnes for X [1].
- More land is needed for spoil heaps, destroying more habitat [1].
- More waste means more rain washing through it, increasing the risk of water pollution [1].
10. Two economic and two environmental impacts, each described [1] and explained [1]:
Economic
- Jobs are created at the mine [1], so incomes in the village rise [1].
- Local shops and services gain customers [1] because miners spend their wages locally [1].
- The village may come to depend on the mine [1], so jobs are lost when it closes [1].
Environmental
- Land is cleared for the pit and spoil heaps [1], so habitats are destroyed and biodiversity falls [1].
- Blasting and lorries create dust [1], which settles on crops and causes breathing problems [1].
- Run-off from spoil heaps carries chemicals into streams [1], killing fish and polluting drinking water [1].
Maximum 4 marks for economic and 4 marks for environmental impacts.
11. Bioremediation, any two:
- Organisms such as plants or microorganisms are added to the polluted ground [1].
- They remove or break down pollutants, cleaning the soil without digging it out [1].
- This makes the land safe for vegetation to grow again [1].
Tree planting, any two:
- Tree roots bind the soil and reduce erosion [1].
- Trees provide habitat, increasing biodiversity [1].
- Trees take in carbon dioxide and store carbon [1].
- Trees screen the site, reducing visual pollution [1].
12. Benefits, any three:
- The hole is filled, so the land surface is restored [1].
- The quarry operator earns income from waste disposal [1].
- It provides a place for a town’s waste close to where it is produced [1].
- Once full, the site can be covered with soil and planted [1].
Limitations, any three:
- Leachate can drain from the waste and pollute ground water and rivers [1].
- Rotting waste releases methane, a greenhouse gas [1].
- Lorries, smell and litter affect nearby residents [1].
- The land can only be used for limited purposes afterwards, because it may settle and is unsuitable for building [1].
Maximum 6 marks; at least one benefit and one limitation are needed for full marks.
Where marks are usually lost
- Confusing bioleaching (bacteria) with phytomining (plants).
- In 9(c), giving only the calculation without explaining what extra waste does.
- Naming factors without linking them to the scenario.
- Writing “it causes pollution” without naming the type and cause.
- Answering 12 with benefits only.
Related resources
-
Revision notes
Cambridge O Level Environmental Management (5014): Extraction of rocks, ores and minerals – Revision Notes
Recall notes for 5014 sub-topic 1.2 (2027-2029): ores, surface, subsurface and biological mining, eight decision factors, impacts and land restoration.
Environmental Management · Cambridge · O Level
Revise topic -
Study guides
Cambridge O Level Environmental Management (5014): Formation of rocks
Sub-topic 1.1 of O Level Environmental Management 5014 (2027-2029): how seven named rocks form, reading rock cycle diagrams, and rock permeability.
Environmental Management · Cambridge · O Level
Read guide -
Practice questions
Cambridge O Level Environmental Management (5014): Formation of rocks – Practice Questions
Original 5014 practice questions with mark-scheme answers on how named rocks form, rock cycle diagrams, permeability data and classifying rocks.