Practice Questions
Pearson Edexcel International A Level Business (YBS11): Resource management – Practice Questions
Twelve original source-based questions with full answers on productivity, capacity utilisation, inventory control, JIT and quality for Edexcel IAL 2.3.4.
- Subject
- Business
- Level
- AS LEVEL
- Topic
- Managing business activities
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Salman Ahmad (what this means)
Aligned to Pearson Edexcel A Level Business (WBS12/01), Issue 1, September 2017. Official specification .
Syllabus page (what it covers and how it is assessed): Pearson Edexcel A Level Business.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Business (YBS11).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs. Examination boards hold copyright in their own papers. Use these alongside the official past papers available free from your board.
Related: Resource management study guide | Resource management revision notes
Each question uses one of the specification’s command words at its published International AS tariff: define (2), calculate (4), explain (4), analyse (6), discuss (8) and assess (10). All businesses and figures are invented.
Sources
Source 1: Tallon Bikes
Tallon assembles bicycles by batch production. Year 2 maximum capacity is 12,600 bikes. Fixed costs are $450,000 a year.
Year 1 Year 2 Bikes made 9,600 11,340 Employees 48 54 Total costs ($) 1,344,000 1,474,200 Source 2: Glenmore Foods
Glenmore makes jars of sauce and sells 25,000 a month. It uses JIT for its fresh tomatoes but holds a buffer of other ingredients. For one key ingredient the maximum inventory is 800 kg and the buffer is 200 kg. Usage is 100 kg a day and the supplier takes 3 days to deliver. Currently 3% of jars are returned as faulty and each replacement costs $2.40. The owner is considering Total Quality Management (TQM), which she hopes will cut returns to 1%.
Section A
Questions 1 to 6 refer to Source 1.
1. Define the term “productivity”. [2]
2. Calculate Tallon’s labour productivity in Year 1 and Year 2, and the percentage change. [4]
3. Calculate Tallon’s capacity utilisation in Year 2. [4]
4. Calculate Tallon’s average cost per bike in each year. [4]
5. Explain one advantage to Tallon of its high capacity utilisation in Year 2. [4]
6. Analyse why Tallon’s average cost per bike fell between Year 1 and Year 2. [6]
Section B
Questions 7 to 12 refer to Source 2.
7. Define the term “buffer inventory”. [2]
8. Calculate the reorder level and the order quantity for Glenmore’s key ingredient. [4]
9. Calculate the monthly saving if TQM cuts returns from 3% to 1%. [4]
10. Analyse one risk to Glenmore of using JIT for fresh tomatoes. [6]
11. Discuss whether Glenmore should introduce TQM. [8]
12. Assess whether Tallon would be better to remain a batch producer or move to flow production. [10]
Answers
1. Output per unit of input [1] per time period, for example per employee per year [1]. [2]
2. Year 1 = 9,600 / 48 = 200 bikes per employee [1]. Year 2 = 11,340 / 54 = 210 bikes per employee [1]. Change = (210 - 200) / 200 x 100 [1] = 5% increase [1]. [4]
3. Capacity utilisation = current output / maximum output x 100 [1] = 11,340 / 12,600 [1] x 100 [1] = 90% [1]. [4]
4. Year 1 = 1,344,000 / 9,600 = $140 [2]. Year 2 = 1,474,200 / 11,340 = $130 [2]. (Award 1 mark per year for the correct method if the answer is wrong.) [4]
5. Fixed costs of $450,000 are spread over more bikes [1]. Fixed cost per bike falls from $46.88 (450,000 / 9,600) to $39.68 (450,000 / 11,340) [1], a saving of about $7 a bike [1]. This lowers average cost and lets Tallon either widen its profit margin or cut prices to win more orders [1]. [4]
6. Output rose by 18.1% (9,600 to 11,340) while total costs rose by only 9.7% [1]. Fixed costs of $450,000 were spread across more bikes, so fixed cost per bike fell [1]. Labour productivity rose by 5%, so each employee made more bikes, cutting labour cost per bike [1]. Higher capacity utilisation (90%) means machines and workshops were used more fully [1]. Together, these cut average cost from $140 to $130 [1], a fall of about 7%, which improves Tallon’s efficiency and ability to compete on price [1]. [6]
7. The minimum amount of inventory a business keeps [1] as a safety net against late deliveries or unexpectedly high demand [1]. [2]
8. Reorder level = buffer + (usage x lead time) = 200 + (100 x 3) [1] = 500 kg [1]. Order quantity = maximum - buffer = 800 - 200 [1] = 600 kg [1]. [4]
9. Current returns = 3% x 25,000 = 750 jars, costing 750 x $2.40 = $1,800 [1]. Returns after TQM = 1% x 25,000 = 250 jars, costing 250 x $2.40 = $600 [1]. Saving = 1,800 - 600 [1] = $1,200 a month [1]. [4]
10. With JIT, Glenmore holds very little tomato inventory [1], so any late delivery stops production almost immediately [1]. Tomatoes are fresh and perishable, so Glenmore cannot easily buy extra from elsewhere at short notice or stockpile them [1]. If production stops, 25,000 jars a month of sales could be lost [1], customers may switch to rival sauces [1], and fixed costs still have to be paid, cutting profit [1]. [6]
11. For TQM: returns would fall from 750 to 250 jars, saving $1,200 a month [1]; fewer faulty jars protects Glenmore’s reputation and customer loyalty [1]; staff responsibility for quality could raise motivation and cut waste [1]. Against: TQM needs training and time, which cost money [1]; a $1,200 monthly saving may not cover those costs for a long time [1]; it needs commitment from all staff and managers or it will fail [1]. Judgement: TQM is probably worthwhile if the training cost is recovered within a year or two and reputation is important in the sauce market [1]; the decision depends on the cost of the programme and the owner’s ability to engage staff [1]. [8]
12. For staying with batch: batch production allows Tallon to make different models and respond to customer tastes [1]; flow production needs expensive machinery and Tallon’s output of 11,340 bikes may not justify the capital cost [1]; a breakdown on a flow line stops everything [1]. For flow: unit costs would fall further as fixed costs spread over a larger output [1]; Tallon is at 90% utilisation, so extra demand would need extra capacity, and a flow line could provide it [1]; standardised production can raise productivity beyond 210 bikes per employee [1]. Judgement: Tallon is probably better to stay with batch production for now, because the range of models and flexibility are valuable and utilisation is already high [1]. It should consider flow production only if demand becomes high and steady enough to fill a much larger line [1], and if it can finance the investment without harming its liquidity [1]. [10]
Where marks are usually lost
- Calculating productivity from total cost instead of output and employees.
- Dividing by current output instead of maximum output in capacity utilisation.
- Forgetting to add the lead-time usage to the buffer in the reorder level.
- Giving a general advantage of JIT without linking it to perishable tomatoes.
- Listing arguments for and against TQM without a judgement based on the figures.
Related resources
-
Revision notes
Pearson Edexcel International A Level Business (YBS11): Resource management – Revision Notes
Revision notes for Edexcel IAL Business 2.3.4: production methods, productivity, efficiency, capacity utilisation, inventory control, JIT and quality, with a self-test.
Business · Pearson Edexcel · AS Level
Revise topic -
Study guides
Edexcel International A Level Business: Managing Business Activities (WBS12)
Study guide to Unit 2 Managing business activities (WBS12) for Edexcel International A Level Business: finance, planning, resources and external influences.
Business · Pearson Edexcel · AS Level
Read guide -
Practice questions
Edexcel International A Level Business: Managing Business Activities — Practice Questions
Original practice questions with worked answers on finance, break-even, ratios, business failure and resources for Edexcel IAL Business (WBS12) Unit 2.
Business · Pearson Edexcel · AS Level
Try questions
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.