OCR A Level Business (H431): Budgets and variances – Practice Questions

Original OCR A Level Business H431 questions with full answers on budgets and variances: calculating, labelling and analysing variances and evaluating budgeting.

Subject
Business
Level
A LEVELS
Topic
Accounting and financial considerations
Updated

Aligned to OCR A Level Business (H431), Version 2.1 (January 2026), for first assessment in 2017; final assessment summer 2027. Official specification .

Syllabus page (what it covers and how it is assessed): OCR A Level Business.

Syllabus points this page covers

H431

  • 6.7 Budgets and variances

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (H431).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.

These questions cover the Budgets and variances content (6.7 on this site) in the Area of Study Management accounting, OCR A Level Business H431, Version 2.1 (January 2026). Every business and figure is invented. Revise first with the study guide or the revision notes.

Questions

Section A: short-answer questions

1. Explain what is meant by a budget. [2]

2. Explain the difference between a favourable and an adverse variance. [3]

3. A department budgeted £30,000 for wages and spent £32,400. State the amount of the variance, whether it is favourable or adverse, and the variance as a percentage of the budget. [3]

4. Which one of the following would be a favourable variance?

A: Sales revenue £5,000 below budget.

B: Materials cost £2,000 above budget.

C: Advertising cost £1,500 below budget.

D: Wages £800 above budget. [1]

5. Explain one reason why a business should involve managers in setting budgets. [2]

Section B: structured and extended questions

6. Larkin Tours produced this budget for March and recorded these actual results.

Item Budget Actual
Revenue £80,000 £84,000
Wages £30,000 £32,400
Marketing £8,000 £6,500
Other costs £20,000 £20,400

(a) Calculate the budgeted profit and the actual profit. [3]

(b) Calculate each variance (revenue, wages, marketing, other costs) and state whether it is favourable or adverse. [4]

(c) Calculate the profit variance and show that it equals the sum of the item variances. [3]

(d) Analyse the variances for wages and marketing. [6]

7. Larkin Tours’ wages variance continues at the same level each month. Calculate the extra wage cost over a year, and evaluate the action the owner should take. [7]

8. Evaluate the usefulness of variance analysis to the manager of a hotel and to the hotel’s owners. [8]

9. The finance director of a supermarket chain says that all budgets should be cut by 5% each year. Evaluate the effect of this policy on the managers and the chain. [8]

Answers

1. A budget is a financial plan for a future period [1], expressed in money terms, setting out expected revenue and allowed spending [1]. [2]

2. A favourable variance is a difference between budget and actual that increases profit [1], such as revenue above budget or costs below budget [1]. An adverse variance reduces profit, for example revenue below budget or costs above budget [1]. [3]

3. Variance = £32,400 − £30,000 = £2,400 [1]. It is adverse, because the cost is higher than budget [1]. Percentage = 2,400 ÷ 30,000 × 100 = 8% [1]. [3]

4. C [1]. [1]

5. Managers know how their area works, so the budget is more realistic [1], and they are more committed to meeting a budget they helped to set [1]. [2]

6. (a) Budgeted profit = 80,000 − 30,000 − 8,000 − 20,000 = £22,000 [1] [1]. Actual profit = 84,000 − 32,400 − 6,500 − 20,400 = £24,700 [1]. [3]

(b) Revenue: £4,000 favourable [1]. Wages: £2,400 adverse [1]. Marketing: £1,500 favourable [1]. Other costs: £400 adverse [1]. [4]

(c) Profit variance = £24,700 − £22,000 = £2,700 favourable [1]. Sum of item variances = +4,000 − 2,400 + 1,500 − 400 [1] = +£2,700 [1]. [3]

(d) Wages: £2,400 over budget, 8% [1]. Higher revenue may have needed more staff or overtime, so the cost may be linked to the extra sales [1]; or wage rates may have risen, or staffing was higher than planned [1]. The owner should check the cause, because a link to sales would be acceptable but poor control would not [1]. Marketing: £1,500 under budget, 18.75% [1]. This may be good if the same revenue was achieved at lower cost, but it may show that planned campaigns were cut, which could reduce future bookings [1]. [6]

7. Extra cost over a year = 12 × £2,400 = £28,800 [1]. Evaluation: if the extra wages are caused by extra sales (revenue was £4,000 above budget), the cost may be justified because profit is still £2,700 above budget [1] [1]. If sales return to budget but wages stay high, profit would fall by £2,400 a month [1]. The owner should find out whether the rise comes from overtime, extra staff or higher pay rates [1], and set a flexible budget that rises with sales [1]. Judgement: no drastic action is needed now, because profit is above budget, but the owner should monitor the wages-to-revenue ratio and act if it keeps rising [1]. [7]

8. For the manager: variance analysis shows where results differ from the plan, such as room revenue or staff costs, so action can be taken at once [1]; it focuses attention on the largest variances [1]; it identifies good performance as well as problems [1]. For the owners: it shows whether managers are meeting targets and spending within limits [1]; it supports decisions about bonuses and investment [1]. Limits: it looks backwards, so the cause may already have gone [1]; an adverse variance may result from events the manager cannot control, such as energy prices [1]; the analysis is useful only if the budget was realistic [1]. Judgement: variance analysis is very useful for control if managers are expected to explain and act on the largest variances, not to be blamed for everything [1]. (Maximum 8 marks.) [8]

9. Effects on managers: they may be demotivated if cuts are unrealistic [1]; they may cut spending on training, maintenance or staff to meet the budget [1]; or they may build slack into budgets to protect themselves [1]. Effects on the chain: costs fall in the short term, which may raise profit [1]; but service and store appearance may suffer, which could reduce sales [1]; different stores face different circumstances, so an equal cut is unfair and ignores efficiency [1]. Judgement: an across-the-board cut is a poor policy, because it does not target waste, and the director should consider cutting where there is evidence of inefficiency [1], while keeping spending that supports sales [1]. [8]

Where marks are usually lost

  • Calling a cost overspend favourable.
  • Giving a variance without saying favourable or adverse.
  • Stopping at the calculation without analysis.
  • Forgetting to check that item variances add to the profit variance.
  • Treating all favourable variances as good.

More on this topic

Official syllabus

OCR, Advanced GCE in Business (H431), specification Version 2.1 (January 2026): Area of Study Management accounting, content Budgets and variances.