Skip to content
Marlbridge

Practice Questions

OCR A Level Business (H431): Risk and uncertainty – Practice Questions

Original OCR A Level Business H431 questions with full answers on risk and reward, expected value, risk matrices, entrepreneurs' risks and uncertainty.

Subject
Business
Level
A LEVELS
Topic
Business objectives and strategic decisions
Updated

Aligned to OCR A Level Business (H431), Version 2.1 (January 2026), for first assessment in 2017; final assessment summer 2027. Official specification .

Syllabus page (what it covers and how it is assessed): OCR A Level Business.

Syllabus points this page covers

H431

  • 1.7 Risk and uncertainty

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (H431).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.

These questions cover the Risk and uncertainty content (1.7 on this site) in Business objectives and strategy, OCR A Level Business H431, Version 2.1 (January 2026). Every business and figure is invented. Revise first with the risk and uncertainty study guide or the risk and uncertainty revision notes. Questions that combine this content with opportunity cost are in the risk, uncertainty and opportunity cost practice set.

Questions

Section A: short-answer questions

1. Explain the usual relationship between risk and reward. [2]

2. Distinguish between quantifiable and unquantifiable risk. [3]

3. Keldry Events estimates that a new festival will make a net gain of £45,000 with probability 0.3, £15,000 with probability 0.5, and a loss of £25,000 with probability 0.2. Calculate the expected value. [2]

4. Explain one internal cause of uncertainty for a newly opened restaurant. [2]

5. Which one of the following is an example of transferring a risk?

A: Training staff in food hygiene.

B: Taking out insurance against fire damage.

C: Refusing to sell on credit.

D: Keeping a cash reserve. [1]

Section B: structured and extended questions

6. Holloway Garden Rooms builds wooden garden offices. It has cash reserves of £35,000 and must choose one option. Figures are net gains over three years.

Option A, a show site near a motorway: £90,000 with probability 0.5, or £30,000 with probability 0.5.

Option B, exporting to Ireland: £200,000 with probability 0.4, £20,000 with probability 0.2, or a loss of £40,000 with probability 0.4.

(a) Calculate the expected value of each option. [4]

(b) Evaluate which option Holloway Garden Rooms should choose. [8]

7. Brookside Care Home has identified four risks and scored each for likelihood and impact on a scale of 1 to 5.

Risk Likelihood Impact
Agency staff costs rise sharply 4 3
Failing an official inspection 2 5
A food poisoning outbreak 1 5
Boiler failure in winter 3 3

(a) Calculate a score for each risk and rank them. [3]

(b) Recommend and justify a response to the highest-ranked risk. [4]

8. Owen is leaving a job that pays £45,000 a year to open a bicycle repair shop as a sole trader. He is investing £30,000 of savings and borrowing £20,000 from a bank. He forecasts a profit of £28,000 in the first year. Evaluate the specific risks Owen faces as an entrepreneur. [9]

9. Tregar Ski Holidays is a UK business that sells skiing holidays in Austria. It sets its prices in pounds a year in advance, but pays hotels in euros. Bookings also depend on how much snow falls.

(a) Using Tregar Ski Holidays as an example, explain the difference between risk and uncertainty. [3]

(b) Analyse how uncertainty affects Tregar’s planning and forecasting. [6]

10. Fenmoor Foods makes ready meals for supermarkets. A failure in its hygiene checks led to a product recall costing £400,000. Its annual profit is usually about £250,000. Two supermarkets have suspended orders. Evaluate the consequences of this poor risk management for Fenmoor Foods and its stakeholders. [9]

11. Pellow Builders employs 18 people and has been offered a contract to build 40 houses, three times larger than any job it has done before. Evaluate two ways in which Pellow Builders could reduce the risk of accepting this contract. [8]

Answers

1. Options with higher potential reward usually carry a higher chance of loss [1], because they involve new markets, new products or more competition, where outcomes are less certain [1]. [2]

2. A quantifiable risk can be measured from data, so its likelihood or cost can be estimated [1]. An unquantifiable risk has no reliable basis for a number [1]. Quantifiable risks can be insured or provided for; unquantifiable risks can only be managed through flexibility and reserves [1]. [3]

3. (0.3 × 45,000) + (0.5 × 15,000) + (0.2 × −25,000) = 13,500 + 7,500 − 5,000 [1] = £16,000 [1]. [2]

4. Whether new kitchen staff can cook consistently to the standard needed [1], because the owner cannot know how they will perform until the restaurant is busy, so quality and reviews are uncertain [1]. Also accept equipment reliability or the accuracy of cost estimates. [2]

5. B [1]. [1]

6. (a) Option A: (0.5 × 90,000) + (0.5 × 30,000) [1] = £60,000 [1]. Option B: (0.4 × 200,000) + (0.2 × 20,000) + (0.4 × −40,000) = 80,000 + 4,000 − 16,000 [1] = £68,000 [1]. [4]

(b) Option B has the higher expected value, by £8,000 [1], and its best outcome, £200,000, is far above anything A offers [1]. But B has a 40% chance of a £40,000 loss [1], which is more than Holloway’s cash reserves of £35,000, so the worst case could threaten the business’s survival [1]. Option A cannot make a loss on these figures [1]. The probabilities for B relate to a market Holloway has never sold in, so they are less reliable than those for A [1]. Judgement: Holloway should choose Option A, because a small business should not take a 40% chance of a loss larger than its reserves for an extra £8,000 of expected value [1]. This would change if Holloway could test the Irish market with a few orders first, or if it had more reserves [1]. [8]

7. (a) Agency staff 4 × 3 = 12; inspection 2 × 5 = 10; boiler 3 × 3 = 9; food poisoning 1 × 5 = 5 [1] [1]. Ranking: agency staff costs, inspection, boiler, food poisoning [1]. [3]

(b) Reduce the risk by recruiting more permanent staff or a bank of the home’s own relief staff [1], so that fewer shifts need expensive agency cover [1]. This is better than accepting the risk because staff costs are a large, recurring cost and the likelihood is high [1]; the trade-off is that permanent staff are paid even when occupancy is low, so the home should recruit to its usual minimum level rather than its peak [1]. [4]

8. Income risk: Owen’s forecast profit of £28,000 is £17,000 below his salary [1], and it is only a forecast, so he could earn much less in year 1 [1]. Capital risk: his £30,000 of savings could be lost if the shop fails [1]. Liability: as a sole trader he has unlimited liability, so if the business cannot repay the £20,000 loan, his personal assets, possibly his home, could be used to repay it [1]. Personal: he loses employment benefits such as sick pay and a pension, and faces long hours [1]. Rewards to set against these: independence, all profits if the shop grows, and a business that may later be sold [1]. Evaluation: the risks are significant because he has put his savings in and borrowed on top [1]. They would be smaller if he had experience of bicycle repair and evidence of local demand, or if he formed a private limited company [1]. Judgement: the venture is reasonable only if he has savings beyond the £30,000 to live on while the shop builds up, since the first year’s income is uncertain [1]. [9]

9. (a) Risk can be measured: Tregar can use past records to estimate, for example, how many customers cancel [1]. Uncertainty cannot be given a reliable probability [1]: Tregar cannot know next winter’s exchange rate or how much snow will fall [1]. [3]

(b) Planning: because prices are fixed a year ahead but hotel costs are paid in euros, a fall in the pound would raise costs without raising revenue [1], so Tregar’s budgets may need to plan for several exchange rates [1]; it may fix the exchange rate with its bank in advance to make the cost certain [1]. Forecasting: bookings depend on snow, which is unpredictable [1], so a single sales forecast is unreliable [1]; Tregar is more likely to forecast a range of bookings and plan staffing and hotel contracts flexibly, for example with cancellation terms [1]. [6]

10. Business: the recall cost of £400,000 is 1.6 times its usual annual profit [1], so Fenmoor is likely to make a loss this year [1]. The suspended orders cut future revenue [1], and its reputation for food safety, which matters greatly to supermarkets, has been damaged [1]. Stakeholders: employees may face reduced hours or redundancy if orders do not return [1]; owners lose profit and possibly the value of the business [1]; supermarkets face empty shelves and their own reputational risk, so they may switch suppliers permanently [1]. Evaluation: the severity depends on whether Fenmoor has reserves to absorb the loss and whether the supermarkets return after improvements [1]. Judgement: the reputational damage is likely to be more serious than the one-off cost, because lost supermarket contracts would reduce revenue for years [1]. [9]

11. Phasing or staged contracts: Pellow could agree to build the houses in phases, with payment at each stage [1], so cash comes in as costs are paid and a problem in phase one does not commit the firm to all 40 houses [1]. However, the client may not agree, or may pay more to a rival that will take the whole job [1]. Subcontracting part of the work: Pellow could use other firms for specialist tasks such as roofing [1], so it does not need to hire and train many new staff quickly [1]. The limitation is less control over quality and timing, and a lower profit margin [1]. Evaluation: staged payments are more important, because the main risk for a small firm on a job three times its normal size is running out of cash before it is paid [1]. Judgement: Pellow should accept only if staged payments are agreed, combined with subcontracting to cover the skills gap [1]. [8]

Where marks are usually lost

  • Choosing the option with the highest expected value without checking the worst case.
  • Treating risk and uncertainty as the same thing.
  • Saying an entrepreneur “could lose everything” without referring to liability.
  • Listing ways to reduce risk without saying what each costs.
  • Ignoring the size of a loss relative to the business’s resources.

More on this topic

Official syllabus

OCR, Advanced GCE in Business (H431), specification Version 2.1 (January 2026): area of study Business objectives and strategy, content Risk and uncertainty.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.