Skip to content
Marlbridge

Revision Notes

OxfordAQA International GCSE Business (9225): Organisational structures – Revision Notes

Revision notes for OxfordAQA IGCSE Business 9225 section 3.4.1: span of control, chain of command, delayering, delegation, tall and flat structures, centralisation and a self-test.

Subject
Business
Level
IGCSE
Topic
Human resources
Updated

Aligned to OxfordAQA IGCSE Business (9225), First teaching September 2020, first examined May/June 2022. Official specification .

Syllabus page (what it covers and how it is assessed): OxfordAQA IGCSE Business.

Syllabus points this page covers

9225

  • 3.4.1 Organisational structures

This page covers 1 of the 4 subtopics in topic 4, Human resources.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for IGCSE Business (9225).

Condensed recall for section 3.4.1 of OxfordAQA International GCSE Business (9225). For full explanations and worked examples, use the study guide. Figures are invented.

What the specification asks

  • Internal organisational structures, including span of control, chain of command, delayering and delegation.
  • Why businesses have structures, and the job roles and responsibilities in them.
  • The impact of a tall or flat structure on how a business is managed.
  • Centralisation and decentralisation.
  • The appropriateness of structures for a business.
  • How structure may affect communication.

Key terms

Term Meaning
Organisational structure How a business is organised: levels, roles and who reports to whom
Organisation chart A diagram of the structure
Chain of command Line of authority from the top to the bottom
Span of control Number of people who report directly to one manager
Delegation Passing authority for a task or decision to a lower level; the manager stays responsible
Delayering Removing one or more levels from the structure
Tall structure Many levels and narrow spans
Flat structure Few levels and wide spans
Centralisation Decisions made at the top
Decentralisation Decisions passed down to lower levels

Levels and roles

Level Roles Responsibility
Top Directors Aims, strategy, major decisions
Middle Managers Plans, budgets, managing supervisors
Lower Supervisors Day-to-day organisation of staff
Operational Workers Carry out tasks

Tall against flat

Tall Flat
Levels Many Few
Span of control Narrow Wide
Supervision Close Looser
Communication Slow, may change on the way Faster, more direct
Cost Higher (more managers) Lower
Promotion Many steps Few steps
Staff responsibility Less More

Delegation and delayering

Delegation

  • Benefits: frees managers; develops and motivates staff; faster decisions.
  • Drawbacks: task may be done less well; staff need training; manager is still responsible.

Delayering

  • Benefits: lower costs; faster communication; more responsibility for remaining staff.
  • Drawbacks: bigger spans overload managers; redundancy costs; falling morale; fewer promotion steps.

Centralisation against decentralisation

Centralised Decentralised
Who decides Senior managers Local or department managers
Speed Slower Faster
Consistency High May vary
Local knowledge Less More
Motivation of managers Lower Higher
Risk Senior managers overloaded Poor local decisions; loss of control

Communication

  • More levels means more delays and more chance that messages are changed or lost.
  • Flat structures allow direct contact between staff and senior managers.
  • Decentralised structures encourage two-way communication.
  • A message taking one day per level through 5 levels takes 4 days; through 3 levels it takes 2 days.

Choosing a structure

Situation Suited to
Small business Flat and simple
Factory with strict safety rules Taller, closer supervision
Creative or fast-changing business Flat and decentralised
Branches in several countries Decentralised

The best structure can change as the business grows.

Calculation practice

  • Number of people at each level: span x people at the level above. Span of 4 under 1 director gives 4 managers, then 16 supervisors, then 64 workers.
  • Span of control = number of workers / number of supervisors.
  • Cost saving from delayering = number of posts removed x salary, less one-off costs such as redundancy.

Example: removing 10 supervisors on $30,000 saves $300,000 a year; redundancy at $5,000 each costs $50,000 once, so the first-year saving is $250,000.

Exam traps

  • Span of control is not the number of levels.
  • Delegation passes authority, not responsibility.
  • Tall and flat each have both advantages and drawbacks. Judge them against the business described.
  • Explain how a feature affects communication or motivation, not just that it does.
  • Delayering is removing levels, not simply sacking workers.
  • Use case details such as the numbers of levels, spans and staff.

Model answer outline: a 9-mark “evaluate” question

Question style: “Evaluate whether a company with 5 levels of management should delayer.”

  • For: lower wage costs, faster communication (a message takes fewer days), more responsibility for staff.
  • Against: wider spans of control, overloaded managers, redundancy costs, fear of job losses, fewer promotion steps.
  • Calculation: annual saving = posts removed x salary; first-year saving = annual saving minus redundancy costs.
  • Judgement: delayering is worth doing if the saving is large and staff can handle more responsibility, but the business should delegate some decisions and check the new spans of control are workable. Make a clear recommendation.

Revision checklist

  • I can define chain of command, span of control, delegation and delayering.
  • I can describe four levels of a hierarchy and their roles.
  • I can compare tall and flat structures.
  • I can compare centralisation and decentralisation.
  • I can explain how structure affects communication.
  • I can calculate span of control and the saving from delayering.
  • I can recommend a structure for a given business.

Self-test

  1. Define “chain of command”.
  2. Define “span of control”.
  3. A supervisor manages 7 workers. State the span of control.
  4. Give two features of a flat structure.
  5. State one advantage and one disadvantage of a tall structure.
  6. Define delegation.
  7. Give one reason why a business might delayer.
  8. Give one risk of delayering.
  9. State one benefit of decentralisation.
  10. Explain how a tall structure can slow down communication.
  11. A business removes 8 supervisors paid $28,000 each. Calculate the annual saving.
  12. A firm has 1 director, with a span of 5, 3 levels in all. How many people are at the bottom level?

Answers

  1. The line of authority from the top of a business to the bottom, showing who reports to whom.
  2. The number of people who report directly to one manager.
  3. 7.
  4. Any two: few levels; wide spans of control; faster communication; lower costs; more responsibility for staff.
  5. Advantage: close supervision (or clear promotion path). Disadvantage: slow communication (or higher costs).
  6. Passing authority to a lower level to carry out a task or make a decision, while the manager stays responsible.
  7. To cut costs, speed up communication or give staff more responsibility.
  8. Any one: remaining managers are overloaded; staff morale falls; redundancy costs; fewer promotion chances.
  9. Faster decisions that fit local needs (or motivated local managers).
  10. Messages pass through many levels, each adding delay and the chance of error.
  11. 8 x $28,000 = $224,000 a year.
  12. Level 1: 1 director; level 2: 5; level 3: 5 x 5 = 25 people.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.