Flashcards · 7137 · Topic 3.2.2

Operations management flashcards

13 cards on Topic 3.2.2. Pick a subtopic or study them all.

Study mode needs JavaScript. Every card is listed below, so you can still cover the answers and test yourself.

All 13 cards

For a quick read-through or printing. Cover the right-hand side to test yourself.

Topic 3.2.2: Operations management

Operations objectives named in 7137
Efficiency, quality, volume of goods and services, flexibility, and environmental impact.
Added value
Selling price less the cost of bought-in inputs. Example: price £85, bought-in materials £52 → £33, which is 38.8% of the price.
Employee productivity, unit costs and capacity utilisation
Employee productivity = output over a time period ÷ number of employees. Unit costs = total costs ÷ number of units of output. Capacity utilisation = actual output ÷ maximum possible output × 100.
7,200 units, 18 staff, total cost £28,800, capacity 9,000. Productivity, unit cost, utilisation?
Productivity = 400 per employee. Unit cost = £4.00. Utilisation = 80%.
Ways to increase productivity, and difficulties
Training, motivation, better equipment, workflow changes, less waste, technology. Difficulties: costs come before gains, staff resistance, pressure on quality, extra output may not sell.
Lean production in 7137
Reducing inventory, re-works, waiting times and transportation times; kaizen (continuous small improvements suggested by staff); and standardised processes.
Benefits and difficulties of JIT
Benefits: lower holding costs, less storage, less cash tied up, less obsolete stock. Difficulties: needs reliable suppliers; delays stop output; no cover for demand spikes; lost bulk discounts.
Network analysis: float time and the critical path
Float time = latest finish time − duration − earliest start time. Example: LFT 9, duration 3, EST 4 → float 2 days. Activities with zero float form the critical path, which sets the shortest project time.
Quality assurance vs checking finished goods
Quality assurance builds quality into every stage to prevent faults. Checking finished goods only detects faults after they are made.
Consequences of poor quality
Returns, wasted materials, lost sales, damaged reputation, compensation, and low staff morale.
Ways of matching output to demand in 7137
Changing production scheduling; increasing or decreasing inventory; part-time, temporary, zero-hours or freelance staff; outsourcing; investment in capital and technology; increasing or decreasing capacity.
Inventory turnover: formula and example
Inventory turnover = cost of sales ÷ average inventories held. Cost of sales £300,000; inventory £22,000 at the start and £28,000 at the end, so average £25,000: turnover = 12 times a year.
Economies and diseconomies of scale in 7137
Economies (unit costs fall with size): technical, purchasing, financial. Diseconomies (unit costs rise with size): problems of control, communication and coordination.