Skip to content
Marlbridge

Practice Questions

AQA A-Level Business (7132): Managing change – Practice Questions

Original practice questions with mark-scheme answers on types of change, force field analysis, delayering, flexible organisations and resistance for AQA A-level Business 7132.

Subject
Business
Level
A LEVELS
Topic
Managing strategic change
Updated

Aligned to AQA A Level Business (7132), For first teaching from September 2023. Official specification .

Syllabus page (what it covers and how it is assessed): AQA A Level Business.

Syllabus points this page covers

7132

  • 3.10.1 Managing change

This page covers 1 of the 4 subtopics in topic 10, Managing strategic change.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (7132).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.

These questions cover section 3.10.1 managing change of the AQA A-level Business (7132) specification. All businesses and figures are invented. Revise first with the study guide and the revision notes.

Section A: Short-answer questions

1. A new law forces a firm to change its packaging. What type of change is this? [1]

A: Internal change

B: External change

C: Incremental change only

D: Organic change

2. Which one of the following is a restraining force in Lewin’s force field analysis? [1]

A: Rivals have already introduced the change

B: Customers are asking for the change

C: Staff fear losing their jobs

D: Potential cost savings

3. Define “delayering”. [2]

4. Name two of Kotter and Schlesinger’s reasons why people resist change. [2]

5. Explain one reason why an organic structure suits a firm in a fast-changing market. [3]

Section B: Structured questions

6. Wyndham Council is considering a four-day working week. The managers score the forces from 1 to 5:

Driving forces: staff demand for flexible work 4; advantage in recruiting 3; rival councils already offer it 2. Restraining forces: cover for public services 4; managers’ doubts 3; complexity of payroll 2.

Calculate the total for each side and comment on the likely ease of change. [4]

7. Explain two actions the council could take to reduce the restraining forces. [4]

8. Wyndham has 640 operational staff. With a span of control of 4, the number of managers needed (all levels) is 214. With a span of 8, it is 93. Calculate the saving if the average cost of a manager is £40,000, and explain one risk of widening the span. [4]

9. Wyndham plans to use more zero-hours contracts for its leisure centre staff. Analyse two effects on the council. [6]

10. Staff at Wyndham do not believe the four-day week will protect their pay. Identify the reason for resistance from Kotter and Schlesinger’s list and explain which approach to overcoming it would be most suitable. [4]

11. Analyse why the move from a mechanistic to an organic structure might be difficult for a long-established public sector organisation. [6]

12. Evaluate the view that the most important factor in successful change is communicating well with staff. [12]

Answers

1. B [1]. The trigger is outside the firm. [1]

2. C [1]. Fear of job losses holds back change; the other options are driving forces. [1]

3. Removing one or more levels [1] of management from the organisation, making it flatter [1]. [2]

4. Any two: parochial self-interest [1]; misunderstanding [1]; low tolerance for change [1]; different assessments of the situation [1]. [2]

5. An organic structure is flat, with decisions made close to customers [1], so the firm can respond quickly to change without waiting for approval through many layers [1]. Broad roles and open communication help staff adapt and share new ideas [1]. [3]

6. Driving total = 4 + 3 + 2 = 9 [1]; restraining total = 4 + 3 + 2 = 9 [1]. The forces are balanced [1], so change will be hard unless the restraining forces are reduced or the driving forces strengthened [1]. [4]

7. Action 1: pilot the four-day week in one department to show that public services can still be covered [1], which reduces the largest restraining force [1]. Action 2: provide briefing and training for managers, and involve them in designing the rota [1], which reduces their doubts and builds ownership [1]. (Credit also: updating the payroll system in advance.) [4]

8. Saving = 214 − 93 = 121 fewer managers [1]; 121 × £40,000 = £4.84m a year [1]. Risk: each manager supervises more staff, so there is less support and supervision [1], which could lower service quality and morale, and redundancy costs reduce the first-year saving [1]. [4]

9. Effect 1: lower costs and more flexibility [1]. Staff can be used only when demand is high, such as at weekends [1], so the council saves on wages in quiet periods and can match staffing to demand [1]. Effect 2: lower commitment and higher turnover [1]. Zero-hours staff have no certainty of income and may leave for more secure jobs [1], which raises recruitment and training costs and may lower service quality [1]. [6]

10. The reason is misunderstanding, or perhaps different assessments of the situation [1]. The most suitable approach is education and communication [1]: explain clearly, with figures, how pay will be protected [1], and answer questions in meetings so staff trust the information [1]. [4]

11. A long-established public body has a tall hierarchy with fixed roles and rules [1], so moving to flat, flexible teams means changing how people work [1]. Staff and managers may fear losing status and security (parochial self-interest) [1]. Accountability to the public and legal duties require clear lines of responsibility, which are harder in an organic structure [1]. A strong culture of following procedures resists change [1], and budgets and funding may not allow quick restructuring [1]. [6]

12. For: poor communication leads to misunderstanding, which is a main cause of resistance [1], so clear explanation reduces fear and builds trust [1]. Staff who understand the reasons are more likely to take part [1]. Communication is cheap compared with negotiation or coercion [1]. Against: communication alone does not remove real losses, such as job cuts, which need negotiation or support [1]. Some resistance comes from self-interest or different views, which information does not change [1]. Leadership, resources, timing and the skill of managers matter as well [1]. Participation gives people ownership that one-way communication does not. Factors: the reasons for resistance [1], the speed required [1], and the trust between staff and managers [1]. Judgement: communication is essential and usually comes first [1], but it is rarely enough; success depends on matching the approach to the cause of the resistance [1]. [12]

Examiner insight: High marks go to answers that name the model, apply it to the case and decide which approach fits, with a reason.

Where marks are usually lost

  • Treating all change as beneficial.
  • Listing approaches without choosing one for the case.
  • Confusing organic and mechanistic structures.
  • Describing delayering only as cost cutting.
  • Failing to link the type of change to its pace and cause.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.