Skip to content
Marlbridge

Revision Notes

AQA GCSE Business (8132): Production processes – Revision Notes

Condensed recall for AQA GCSE Business section 3.3.1: job and flow production, lean techniques, JIT and productivity, with key terms, traps and a self-test.

Subject
Business
Level
GCSE
Topic
Business operations
Updated

Aligned to AQA GCSE Business (8132), For first teaching from September 2017. Official specification .

Syllabus page (what it covers and how it is assessed): AQA GCSE Business.

Syllabus points this page covers

8132

  • 3.3.1 Production processes

Found an error? Report a correction.

Need help with this topic? Request a free trial class for GCSE Business (8132).

These notes condense section 3.3.1 Production processes of the AQA GCSE Business (8132) specification, for first teaching from September 2017. For explanations and a worked example, read the Production processes study guide. To apply the content, use the Production processes practice questions. The Business operations revision notes cover the whole of Topic 3.

Core recall

What the specification lists

  • Methods of production: job and flow. Know when each is appropriate.
  • Efficiency in production: lean production and just in time (JIT). Consider how lean techniques can make production more efficient.

Job and flow side by side

Job production Flow production
What is made One-off items to individual order Large volumes of identical items
When production starts When an order arrives Continuously, ahead of demand
Labour Highly skilled, varied tasks Specialised, often repetitive tasks
Equipment General purpose tools Specialised machinery and production lines
Cost per unit High Low
Price Premium Competitive
Flexibility High Low
Stock of finished goods Little Large
Main risk Slow output, irregular revenue High set-up cost, breakdowns stop the line

Choosing a method: five questions

  1. Does each customer want something different? Job.
  2. Is demand large and steady? Flow.
  3. Will customers wait for their product? Job.
  4. Must the price compete with rivals? Flow.
  5. Can the business afford production-line machinery? Flow needs it.

Lean production in one sentence

An approach to production that aims to cut every kind of waste: overproduction, waiting, unnecessary movement, defects and excess stock.

Lean techniques

  • Just in time (JIT): materials arrive just before use; make to order.
  • Continuous improvement (kaizen): many small improvements suggested by workers.
  • Right first time: check quality at each stage.
  • Workplace layout: reduce movement and waiting.

Lean benefits and drawbacks

Benefits Drawbacks
Lower costs, less waste Relies on reliable suppliers
Less cash tied up in stock No buffer if demand jumps
Faster production Training and time to introduce
Better quality Staff may resist change
Staff involvement More deliveries can raise transport costs

Efficiency calculations

  • Productivity = total output ÷ number of workers
  • Reject (defect) rate = rejected items ÷ total output × 100
  • Percentage change = (new − old) ÷ old × 100

Figures invented: 12 workers make 9,600 items a week. Productivity = 9,600 ÷ 12 = 800 per worker. If output rises to 10,800 with the same staff, productivity = 900, a rise of 12.5%.

  • Finance: flow needs large investment; lean frees cash from stock.
  • Human resources: job needs skilled staff; flow needs fewer skills but risks low motivation; lean needs training and staff involvement.
  • Marketing: job supports premium pricing and personalisation; flow supports low prices and wide distribution.

Key terms

Term Meaning
Production Turning inputs into goods or services
Job production Making one-off products to meet individual customer orders
Flow production Continuous production of large volumes of identical products
Standardised Every unit is the same
Efficiency Producing output using as few resources as possible
Productivity Output per worker in a period
Lean production Production that aims to minimise waste
Just in time (JIT) Materials arrive just as they are needed; little stock held
Kaizen Continuous improvement through small, regular changes
Unit cost The average cost of producing one item

Exam traps

  • Job vs flow confused with JIT vs JIC. Production methods and stock methods are separate decisions.
  • “Flow is always cheaper.” Only per unit, and only with high steady demand.
  • Lean equals JIT only. Name other techniques too.
  • Ignoring people. Flow can demotivate; lean needs staff support.
  • No context. Choose the method that suits the product described.
  • Percentage change from the wrong base. Divide by the old figure.

Self-test

  1. Name the two methods of production in the specification.
  2. Give one example of a product made by job production and one by flow production.
  3. Why is the cost per unit higher in job production?
  4. Give two disadvantages of flow production.
  5. Why does flow production need high, steady demand?
  6. Define lean production.
  7. Name two lean production techniques.
  8. Give one risk of using JIT.
  9. A factory has 25 workers producing 15,000 units a week. Calculate productivity.
  10. Output rises from 15,000 to 16,500 with the same workforce. Calculate the percentage rise in productivity.
  11. Why might workers on a flow production line be less motivated than those in job production?
  12. Which function of a business is most affected by the high set-up cost of flow production?

Answers

  1. Job and flow.
  2. For example: job, a made-to-measure suit; flow, tinned soup.
  3. Skilled labour spends a long time on each item, and materials are bought in small quantities.
  4. Any two: high set-up cost, inflexible, repetitive work, a breakdown stops the line.
  5. The expensive machinery must be used fully to spread its cost over many units; otherwise unit costs rise.
  6. An approach to production that aims to cut waste of all kinds.
  7. Any two: JIT, continuous improvement (kaizen), right first time, reorganising the workplace.
  8. A late delivery can stop production, or there is no spare stock if demand rises.
  9. 15,000 ÷ 25 = 600 units per worker per week.
  10. New productivity 660; (660 − 600) ÷ 600 × 100 = 10%.
  11. They repeat one task many times, which can be boring and gives little sense of achievement.
  12. Finance, because it must raise and budget for the large investment.

Specification reference

AQA GCSE Business (8132), for first teaching from September 2017: section 3.3.1 Production processes.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.