Cambridge AS & A Level Accounting (9706): Costs and Cost Behaviour – Revision Notes

Condensed notes on cost elements, cost behaviour, labour and materials, FIFO and AVCO, and JIT, with a self-test, for Cambridge 9706 Accounting section 2.1.

Subject
Accounting
Level
AS LEVEL
Topic
Cost and management accounting
Updated

Aligned to Cambridge A Level Accounting (9706), 2026-2028. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge A Level Accounting.

Syllabus points this page covers

9706 (AS Level)

  • 2.1 Costs and cost behaviour

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Accounting (9706).

Related: costs and cost behaviour study guide | costs and cost behaviour practice questions

Condensed notes for 2.1 Costs and cost behaviour (2.1.1 Materials and labour), Cambridge AS & A Level Accounting 9706, 2026–2028 series. AS Level content. Figures are invented; amounts in dollars.

The cost ladder

Layer Made of
Prime cost Direct materials + direct labour + direct expenses
Production cost Prime cost + production overheads (indirect materials, labour, expenses)
Total cost Production cost + administration, selling and distribution overheads
  • Direct = economically traceable to one cost unit. Indirect = shared, so it becomes an overhead.
  • Direct expense examples: royalty per unit, hire of equipment for one job, subcontract work on one job.
  • Indirect examples: factory supervisor, lubricants and cleaning materials, factory rent and insurance.
  • Finished goods inventory is valued at production cost, never total cost.

Cost behaviour

Type Total cost Per unit Example
Fixed Constant within the relevant range Falls as output rises Factory rent
Variable Proportional to output Constant Raw materials
Semi-variable Fixed part + variable part Falls as output rises Power with a standing charge
Stepped Constant, then jumps Falls, then rises at each step Supervisors, one per shift

High-low method for a semi-variable cost:

  1. Pick the highest and lowest activity levels (not costs).
  2. Variable cost per unit = change in cost ÷ change in activity.
  3. Fixed cost = total cost at either point − (activity × variable rate).
  4. Forecast = fixed cost + (new activity × variable rate), valid only inside the observed range.

Mini check: 500 units cost 3,900 and 900 units cost 5,500. Variable = 1,600 ÷ 400 = 4.00; fixed = 3,900 − 2,000 = 1,900; at 700 units, 1,900 + 2,800 = 4,700.

Stepped cost rule: steps needed = output ÷ capacity per step, rounded up. 2,100 units with one supervisor per 800 units needs 3 supervisors.

Labour

  • Time rate: hours paid × rate. Simple, but pays for slow work as well as fast.
  • Piece rate: units × rate per unit, often with a guaranteed minimum. Rewards output but can lower quality.
  • Overtime premium (the extra above basic) is an overhead, unless a customer’s rush job caused it, when it is charged to that job.
  • Idle time is paid but unproductive, so it is charged to overheads.
  • Direct labour = productive hours × basic rate.

Materials and inventory valuation

Method Issues priced at Closing inventory Rising prices Falling prices
FIFO Oldest prices first Newest prices Higher profit Lower profit
AVCO periodic One average for the whole period Period average Between the two Between the two
AVCO perpetual Average recalculated after every receipt Latest running average Between the two Between the two
  • Perpetual and periodic FIFO always give the same closing inventory.
  • Perpetual and periodic AVCO usually differ, because the timing of issues changes the average used.
  • Cost of issues = opening inventory + purchases − closing inventory. Use it to check any record.
  • Over the life of the business total profit is the same; only the split between periods changes.

Just in time

Principles: materials arrive as production needs them; small, frequent deliveries; few, reliable suppliers; production pulled by demand; strong quality control.

Benefits Drawbacks
Lower storage and insurance costs Lost bulk discounts
Less cash tied up in inventory More orders and deliveries, so higher ordering costs
Less waste, theft and obsolescence One late or faulty delivery can halt production
Space freed for production Heavy reliance on suppliers and accurate forecasts

Decision method: holding cost saved − discounts lost − extra ordering or delivery costs, then non-financial factors, then a recommendation.

Key terms

Term Meaning
Cost unit The unit of product or service to which costs are charged
Direct cost A cost traced to a cost unit
Overhead An indirect cost that cannot be traced to a single cost unit
Prime cost Total of direct costs
Relevant range Output levels over which the assumed cost behaviour holds
Semi-variable cost A cost with both a fixed and a variable element
Stepped cost A fixed cost that rises in jumps at set activity levels
Overtime premium Pay above the basic rate for overtime hours
Idle time Paid time in which no production takes place
Perpetual inventory A record updated after each receipt and issue
Periodic inventory Inventory valued once at the end of the period
JIT Receiving materials only when production needs them

Exam traps

  • Using the highest and lowest costs in the high-low method when another month has a higher or lower activity level.
  • Rounding a stepped cost calculation down: 2.1 supervisors means 3, not 2.
  • Treating the whole overtime payment as an overhead instead of only the premium.
  • Dividing total goods available by units purchased only, leaving out opening inventory, in periodic AVCO.
  • Not recalculating the average after a receipt, or recalculating it after an issue (an issue does not change the average).
  • Saying FIFO “gives higher profit” without stating that prices are rising.
  • Evaluating JIT on cost alone: a recommendation needs non-financial factors such as supplier reliability.

Self-test

1. Classify a royalty of 0.80 paid for every unit made. 2. Which layer of cost is used to value finished goods inventory? 3. Fixed costs are 24,000. What is the fixed cost per unit at 3,000 and at 4,000 units? 4. 1,000 units cost 7,000 and 1,600 units cost 9,400. Find the variable cost per unit and the fixed cost. 5. Using Question 4, forecast the cost of 1,300 units. 6. One technician (3,200 a month) is needed per 600 units or part. What does 1,450 units cost? 7. A worker is paid 50 hours at 12.00, including 8 overtime hours at time-and-a-half. What is the overtime premium? 8. Why is idle time charged to overheads? 9. Opening 100 units at 4.00; bought 300 at 5.00; issued 250. Find closing inventory by periodic AVCO. 10. Using Question 9, find closing inventory by FIFO. 11. Why do perpetual and periodic FIFO always agree? 12. Give one financial and one non-financial drawback of JIT.

Answers

1. A direct expense (variable). 2. Production cost. 3. 8.00 a unit at 3,000; 6.00 a unit at 4,000. 4. Variable = 2,400 ÷ 600 = 4.00; fixed = 7,000 − 4,000 = 3,000. 5. 3,000 + (1,300 × 4.00) = 8,200. 6. 1,450 ÷ 600 = 2.4, so 3 technicians: 9,600. 7. 8 × 6.00 = 48. 8. No cost unit benefits from it, so it cannot be traced to production. 9. Total 400 + 1,500 = 1,900 for 400 units, average 4.75; 150 × 4.75 = 712.50. 10. The newest 150 units at 5.00 = 750. 11. Under FIFO the units left are always the most recent purchases, whatever the timing of issues. 12. Financial: lost bulk discounts or higher delivery costs. Non-financial: production stops if a supplier is late.

Official syllabus

Cambridge International, AS & A Level Accounting 9706 syllabus for 2026, 2027 and 2028, section 2.1 Costs and cost behaviour.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.