Cambridge A Level Information Technology (ICT): 16.9 Prototyping (9626) – Practice Questions

Original practice questions with marked answers on evolutionary, incremental, throwaway and rapid prototyping for section 16.9 of Cambridge A Level IT 9626.

Subject
ICT
Level
A LEVEL
Topic
System life cycle
Updated

Aligned to Cambridge A Level Information Technology (9626), 2025-2027. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge A Level Information Technology.

Syllabus points this page covers

9626 (A Level)

  • 16.9 Prototyping

This page covers 1 of the 10 subtopics in topic 16, System life cycle.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Information Technology (9626).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.

These questions cover section 16.9 Prototyping of the Cambridge International AS & A Level Information Technology 9626 syllabus for examination in 2025, 2026 and 2027 (version 4). This is A Level only content examined in Paper 3 (Advanced Theory), where calculators are not allowed. All questions can be answered on paper.

Revise first with the study guide and revision notes. The Cambridge A Level IT hub lists every topic.

Questions

1. State the four types of prototyping named in the syllabus. [4]

2. Describe what is meant by a prototype of a system. [2]

3. Give three reasons why a prototype is useful to a development team. [3]

4. A travel agency wants a new system for building holiday packages. The staff cannot say exactly what they need, but say they will “know it when they see it”.

(a) Describe how a throwaway prototype would be used. [3]
(b) Give two advantages of this type of prototype for the travel agency. [2]
(c) Give one disadvantage of this type of prototype. [1]

5. Explain the difference between evolutionary prototyping and throwaway prototyping. [3]

6. A government department is building a large tax-advice system. It has three parts (an online form, a calculator and a help centre), each of which can be built by a separate team.

(a) Name the type of prototyping that suits this project and explain why. [2]
(b) Describe how it would be carried out. [3]
(c) Give one problem that might arise at the end of the project. [1]

7. Explain what is meant by rapid prototyping and give one advantage and one disadvantage. [3]

8. A bank is designing a mobile app. The requirements are changing every month as new features are suggested.

Evaluate the use of evolutionary prototyping for this project. [5]

Answers

1. Evolutionary [1]; incremental [1]; throwaway [1]; rapid. [1] [4]

2. A working model [1] of all or part of the system, built early, that users can try before the full system is built. [1] [2]

3. Any three, one mark each: users can see and try something real, so they can say what they need; misunderstandings are found early when changes are cheap; screen and report designs can be tested with users; risky ideas or technology can be tested; users are involved, so they are more likely to accept the result. [3]

4. (a) A quick prototype with sample data, such as clickable screens for building a package, is built [1]. The staff try it and say what is missing or wrong [1]. The prototype is then discarded and the real system is built using what was learned. [1] [3]
(b) Any two: the staff see something real, so they can say what they want; the requirements become clearer before the real build; the risk of building the wrong system is reduced; the prototype can be built quickly with simple tools. [1 each] [2]
(c) Any one: the effort of building the prototype is wasted; it adds time and cost; staff may think the system is nearly finished. [1] [1]

5. An evolutionary prototype is improved again and again after user feedback [1] until it becomes the finished system [1]; a throwaway prototype is built only to clarify the requirements and is discarded, and the real system is built afresh. [1] [3]

6. (a) Incremental prototyping [1], because the system divides into separate components that can be built at the same time by different teams. [1] [2]
(b) A prototype of each component (form, calculator, help centre) is built by its own team [1], tested and refined with users [1], and the finished components are combined into the whole system. [1] [3]
(c) Any one: the components may not fit together, and integration problems appear late; the way the system was split may turn out to be wrong. [1] [1]

7. Rapid prototyping is building a prototype as quickly as possible, usually with tools that produce screens and simple behaviour fast [1]. Advantage (any one): users give feedback very quickly; misunderstandings are found early; cheap to change. [1] Disadvantage (any one): quality may be poor; features such as validation and security may be missing; users may expect the real system as quickly. [1] [3]

8. Advantages (up to 2 marks): the prototype can be changed to include new features each month [1]; bank staff and customers see working versions and give feedback throughout. [1] Disadvantages (up to 2 marks): there is no clear end date or cost, so the project may run on [1]; the structure may become messy, and security and testing might be neglected, which is serious for a bank. [1] Judgement (1 mark): for example evolutionary prototyping is a good fit because the requirements keep changing, provided there is firm control of the scope, security and testing. [1] Maximum 5. [5] Examiner insight: The strongest answers tie each point to the bank scenario and finish with a conclusion that mentions a condition.

Where marks are usually lost

  • Saying every prototype is discarded.
  • Mixing up incremental prototyping and incremental development.
  • Writing “it is quicker” with no explanation.
  • Naming a type without justifying it.
  • Giving the same advantage for every type.

More on this topic

Frequently asked questions

What should I include when asked why a type of prototyping is needed? Say what situation it suits, such as unclear requirements for evolutionary or throwaway prototyping, or a large system split into parts for incremental prototyping.

Is prototyping examined in Paper 3? Yes. Prototyping is section 16.9 of the A Level content assessed in Paper 3 Advanced Theory.

Official syllabus

Cambridge International AS & A Level Information Technology 9626, syllabus for examination in 2025, 2026 and 2027, version 4, Cambridge University Press & Assessment. Section 16.9: Prototyping.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.