Practice Questions
Cambridge IGCSE ICT (0417): Development and testing – Practice Questions
Twelve original questions with answers on test strategies, test plans, remedial action, normal, abnormal, extreme and live data for Cambridge IGCSE ICT 0417.
- Subject
- ICT
- Level
- IGCSE
- Topic
- Topic 7: The systems life cycle
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Harris Khan (what this means)
Aligned to Cambridge IGCSE ICT (0417), 2026-2028. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge IGCSE ICT.
Syllabus points this page covers
0417
- 7.3 Development and testing
Found an error? Report a correction.
Need help with this topic? Request a free trial class for IGCSE ICT (0417).
These questions cover section 7.3 “Development and testing” of Cambridge IGCSE ICT 0417: the need for testing, test designs and strategies, test plans, test data and live data. All organisations are invented.
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs — Cambridge International holds copyright in its own papers. Use these alongside the official past papers available through your school or Cambridge directly.
Related: Development and testing study guide · Development and testing revision notes
Section A: short answers
1. Define extreme data. [1]
2. Name three test strategies. [3]
3. State the two columns of a test plan that are completed only after a test has been run. [2]
4. A field stores the number of children in a family and accepts whole numbers from 0 to 12. Identify the type of test data each value represents.
(a) 12 [1]
(b) 13 [1]
(c) 3 [1]
5. Give two consequences for a business if a new system is implemented without being tested. [2]
Section B: structured questions
6. Lakeview Gym’s new membership system has a field Age that must accept whole numbers from 16 to 80.
Copy and complete the test plan below with four different tests: one normal, two extreme and one abnormal.
| Test data | Type of test data | Expected outcome |
|---|---|---|
[4]
7. During testing, the value 80 is rejected by the Age field.
(a) State what should be recorded in the test plan as the actual outcome. [1]
(b) Suggest the most likely cause of this fault. [1]
(c) Describe the remedial action that should be taken. [2]
8. The gym’s system has a Password field that must contain between 8 and 16 characters.
(a) Give the extreme test data for this field. [2]
(b) Give two items of abnormal test data and explain why each should be rejected. [2]
9. The gym system has three modules: membership, class bookings and payments.
(a) Explain why each module should be tested separately before the whole system is tested. [2]
(b) Explain why the whole system must still be tested once each module works. [2]
10. Describe how the gym’s output formats should be tested, with an example. [3]
11. Before switching over, the gym enters last month’s real membership payments into the new system.
(a) State the name given to this type of data. [1]
(b) Explain how the results are used to check the system. [2]
(c) Explain why this does not replace testing with normal, abnormal and extreme data. [2]
12. Explain why a test plan should include abnormal data as well as normal data. [3]
Answers
1. Valid data at the upper or lower limit of the accepted range [1]. [1]
2. Testing each module [1]; testing each function [1]; testing the whole system [1]. [3]
3. Actual outcome [1]; remedial action [1]. [2]
4. (a) Extreme [1].
(b) Abnormal [1].
(c) Normal [1]. [3]
5. Any two of: customer or financial data could be lost or corrupted [1]; wrong output such as incorrect invoices could be sent [1]; the business might make wrong decisions [1]; fixing faults while the system is in use costs more time and money [1]; staff and customers lose confidence [1]. Maximum 2. [2]
6. One mark per correct row:
- Normal: any whole number from 17 to 79, such as 35; accepted [1].
- Extreme: 16; accepted [1].
- Extreme: 80; accepted [1].
- Abnormal: such as 15, 81, a decimal such as 30.5, or text such as “thirty”; rejected with an error message [1]. [4]
7. (a) Rejected / an error message was displayed [1].
(b) The range check has been set as “less than 80” instead of “80 or less” [1].
(c) Correct the validation rule so that 80 is included in the range [1], then repeat the test (and the other range tests) and record the new actual outcome [1]. [4]
8. (a) A password of exactly 8 characters [1] and one of exactly 16 characters [1].
(b) Any two, each with reason: a 7-character password, because it is shorter than the minimum [1]; a 17-character password, because it is longer than the maximum [1]; an empty field, because no password has been entered [1]. Maximum 2. [4]
9. (a) If an error is found it can be traced to that module, so it is easier to locate and correct [1]; modules can be tested as soon as they are built, so problems are found early [1].
(b) Errors may only appear when modules work together [1], for example a class booking might not pass correctly to the payments module to produce a charge [1]. [4]
10. Produce each screen display and report from known test data [1]; check that the data shown is correct and complete, and laid out, sorted and totalled as in the design [1]; for example, check that the monthly membership report lists members in surname order with the correct total income at the end [1]. [3]
11. (a) Live data [1].
(b) The results from the old system are already known [1], so the new system’s output, such as the total payments, is compared with them; any difference shows a fault [1].
(c) Last month’s data may not contain unusual or invalid values [1], so it cannot show whether the validation rejects abnormal data or handles the limits of each range correctly [1]. [5]
12. Abnormal data checks that the validation routines reject invalid data [1] and that a suitable error message is shown [1]; normal data only shows that valid data is accepted, so faults that let invalid data into the system would not be found [1]. [3]
Frequently asked questions
Is 0 normal or extreme data if the range starts at 0? If 0 is the lowest accepted value, it is extreme data and should be accepted.
Should every field have extreme data? Only fields with limits, such as ranges or lengths. A presence or format check is tested with normal and abnormal data.
Syllabus reference
Cambridge International, Cambridge IGCSE Information and Communication Technology (0417) syllabus for 2026, 2027 and 2028, Topic 7 “The systems life cycle”, section 7.3 “Development and testing”.
Related resources
-
Revision notes
Cambridge IGCSE ICT (0417): Development and testing – Revision Notes
Revision notes for Cambridge IGCSE ICT 0417 7.3: why test, test designs and strategies, test plans, normal, abnormal and extreme data, live data, self-test.
ICT · Cambridge · IGCSE
Revise topic -
Study guides
Cambridge IGCSE ICT (0417): Documentation
Technical and user documentation for Cambridge IGCSE ICT 0417 section 7.5: purpose, audience and every syllabus-named component explained, with worked examples.
ICT · Cambridge · IGCSE
Read guide -
Practice questions
Cambridge IGCSE ICT (0417): Documentation – Practice Questions
Twelve original questions with answers on the purpose, audience and components of technical and user documentation for Cambridge IGCSE ICT 0417 section 7.5.
ICT · Cambridge · IGCSE
Try questions
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.