Practice Questions
IB DP Geography (DP Geography): Flooding and flood mitigation – Practice Questions
Original practice questions with full answers on storm hydrographs, flood probability, residual risk and flood mitigation strategies for IB DP Geography.
- Subject
- Geography
- Level
- IB
- Topic
- Topic 1: Option A: Freshwater
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to International Baccalaureate IB Diploma Programme Geography (DP Geography), First assessments 2019. Official specification .
Syllabus page (what it covers and how it is assessed): IB Diploma Programme Geography.
Syllabus points this page covers
DP Geography
- 1.2 Flooding and flood mitigation
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – the IB holds copyright in its own papers. Use these alongside the official past papers available through your school or the IB store.
Related: 1.2 study guide and 1.2 revision notes. All data are invented unless a real place is named.
Section A
1. Define the term lag time. [1]
2. Outline what is meant by residual risk behind a flood defence. [2]
3. A river has 59 years of annual maximum flow records. Calculate the recurrence interval of the second-largest flood. [2]
4. State the annual probability of a flood with a recurrence interval of 25 years, as a percentage. [1]
5. Outline one reason why the lead time of a flood warning is often short in a small urban catchment. [2]
Section B
6. The table shows two storms on the same basin. Each delivered 40 mm of rain with peak rainfall at 14:00.
| Storm A | Storm B | |
|---|---|---|
| Baseflow (cumecs) | 3 | 3 |
| Peak discharge (cumecs) | 11 | 27 |
| Time of peak discharge | 21:00 | 17:00 |
(a) Calculate the lag time for each storm. [2]
(b) Calculate the rise from baseflow to peak for each storm. [1]
(c) Storm B occurred after a week of heavy rain. Explain how this accounts for the differences shown. [3]
7. A town’s new houses lie inside the 50-year flood outline.
(a) Calculate the probability that at least one flood of this size occurs during a 25-year period. Show your working. [3]
(b) Suggest two reasons why the true probability may be higher than your answer. [2]
8. Explain how a storage reservoir upstream of a city can reduce flood risk, and one way in which it can fail to do so. [4]
Section C
9. Examine the view that building levees increases flood risk in the long term. [10]
10. With reference to examples, evaluate the effectiveness of relocating communities away from floodplains as a flood mitigation strategy. [10]
Answers
1. The time between peak rainfall and peak discharge [1]. [1]
2. The risk of flooding that remains after a defence is built [1], because a flood larger than the design standard can overtop it, or the defence can breach or fail through poor maintenance [1]. [2]
3. Recurrence interval = (n + 1) / m = (59 + 1) / 2 [1] = 30 years [1]. [2]
4. 1 / 25 = 0.04, so 4 per cent [1]. [1]
5. Impermeable surfaces and drains send rain to the channel within minutes to an hour or two [1], so there is little time between the rain falling and the river peaking, and no long upstream reach where a flood wave can be detected in advance [1]. [2]
6. (a) Storm A: 21:00 - 14:00 = 7 hours [1]. Storm B: 17:00 - 14:00 = 3 hours [1].
(b) Storm A: 11 - 3 = 8 cumecs; Storm B: 27 - 3 = 24 cumecs [1].
(c) After a week of heavy rain the soil was saturated [1], so little of Storm B’s rain could infiltrate and it moved as saturation-excess overland flow, which is fast [1]. More water therefore reached the channel sooner, giving a shorter lag time (3 hours rather than 7) and a rise three times larger (24 cumecs rather than 8) [1]. [6]
7. (a) Annual probability p = 1 / 50 = 0.02 [1]. Probability of no flood in 25 years = 0.98 to the power 25 = 0.60 [1]. Probability of at least one flood = 1 - 0.60 = 0.40, about 40 per cent [1].
(b) Any two [1] each: the record may be too short to include the largest floods; urban growth or deforestation upstream may have made the basin flashier since the record was made; climate change may be increasing heavy rainfall; the calculation assumes each year is independent and conditions are unchanged. [5]
8. The reservoir stores storm runoff and releases it slowly [1], lowering and delaying the flood peak downstream at the city [1]. It can fail if prolonged rain fills its storage before the peak arrives [1], so operators must release large volumes to protect the dam while the city is already flooding (as examined after the 2011 Brisbane floods) [1]. [4]
9. Indicative content:
- For the view: levees confine water to the channel, so floodplain storage is lost and water levels downstream rise [1]; faster flow passes the flood peak to unprotected places [1]; the levee effect encourages building behind defences, increasing exposure [1]; when a flood exceeds the design standard, overtopping or breaching causes deep, sudden flooding that can be worse than undefended flooding [1]; defences need maintenance, and ageing levees become more likely to fail [1].
- Against the view: levees give reliable protection against frequent floods up to their design standard, protecting existing towns where relocation is impossible [1]; risk can be managed if levees are combined with zoning, warnings and spillways that release water onto chosen land [1]; set-back levees, as in the Dutch Room for the River programme, give space to the river while still protecting towns [1].
- Examination: the outcome depends on whether planning restricts building behind the levee and whether the whole basin is managed, not on the levee alone [1].
- Conclusion: a supported judgement, for example that levees used alone tend to raise long-term risk by increasing exposure and residual risk, but used within integrated catchment management they can reduce it [1]. [10]
10. Indicative content:
- Definition and how it works: relocation removes people and property from the hazard zone, reducing exposure rather than changing the flood [1].
- Example: after the 1993 upper Mississippi flood, Valmeyer, Illinois, was rebuilt on higher ground, and federal buy-outs removed many floodplain properties [1].
- Strengths: permanent reduction of damage for those moved [1]; returns floodplain to natural storage, benefiting places downstream [1]; avoids the recurring costs of maintaining and raising defences [1].
- Limitations: high upfront cost of buying homes and building new infrastructure [1]; loss of community ties, heritage and livelihoods tied to the river, so residents may resist [1]; impractical for large cities or places where high ground is scarce [1].
- Equity: voluntary schemes may leave poorer residents behind, or move them to less convenient sites [1].
- Conclusion: highly effective for small, repeatedly flooded settlements with nearby safe land; limited for dense cities, where it works only alongside defences and zoning [1]. [10]
Examiner insight: In Section C, marks reward evaluation that depends on place and scale. A judgement such as “effective for small towns, not for megacities” is stronger than “it is good and bad”.
Where marks are usually lost
- Measuring lag time from the start of rain instead of peak rainfall.
- Treating a 50-year flood as one that happens once in 50 years.
- Forgetting to subtract baseflow when asked for the rise in discharge.
- Evaluating structures only, with no mention of planning, warnings or relocation.
Related resources
-
Subject guides
IB Diploma Programme Geography: Subject Overview
An overview of IB Diploma Programme Geography – interactions between individuals, societies and physical processes across time and space.
Geography · International Baccalaureate · IB
Read course guide -
Study guides
IB DP Geography (DP Geography): Water scarcity and water quality
IB DP Geography Freshwater 1.3 in depth: measuring water stress two ways, who bears scarcity, managing water quality and shared rivers such as the Indus.
Geography · International Baccalaureate · IB
Read guide -
Practice questions
IB DP Geography (DP Geography): Water scarcity and water quality – Practice Questions
Original practice questions with full answers on water stress indicators, unequal scarcity, water quality management and shared rivers for IB DP Geography.
Geography · International Baccalaureate · IB
Try questions
Studying Geography?
This page is free and stays free. Marlbridge is not offering Geography classes at the moment, so there is no tuition to book for it. The free study resources stay open to everyone.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.