Skip to content
Marlbridge

Study Guides

OCR A Level Business (H431): Opportunity cost

Study guide to opportunity cost for OCR A Level Business H431: money, time and capacity, orders at full capacity, owners' forgone income and decisions.

Subject
Business
Level
A LEVELS
Topic
Business objectives and strategic decisions
Updated

Aligned to OCR A Level Business (H431), Version 2.1 (January 2026), for first assessment in 2017; final assessment summer 2027. Official specification .

Syllabus page (what it covers and how it is assessed): OCR A Level Business.

Syllabus points this page covers

H431

  • 1.8 Opportunity cost

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (H431).

This guide covers the Opportunity cost content in the area of study Business objectives and strategy of the OCR A Level Business (H431) specification, Version 2.1 (January 2026), final assessment summer 2027. It is numbered 1.8 on this site; the specification does not number its content. The risk and uncertainty and opportunity cost study guide defines the term and ranks three uses of a sum of money. This page goes further: it applies opportunity cost to time and production capacity as well as money, works through an order at full capacity and an owner’s forgone income, and shows how the idea changes real decisions. All businesses and figures are invented.

Use it with the opportunity cost revision notes and the opportunity cost practice questions. The course hub is OCR A Level Business.

What the specification asks for

Learners should be able to Covered below
explain what is meant by opportunity cost Meaning, and four scarce resources
identify the opportunity cost of a business decision Worked examples 1 and 2
analyse the impact of opportunity cost on business decision making Impact on decisions

The list is short, but the idea runs through the whole course: every investment appraisal, every choice between strategies and every use of staff time has an opportunity cost.

Meaning

Opportunity cost is the benefit of the next best alternative that is given up when a choice is made. It exists because resources are scarce: money, time, space and people can each be used only once at a time.

Two points cause most errors:

  • It is the next best alternative only, not the total of all the alternatives rejected.
  • It is a benefit given up, not money spent. A business can have a large opportunity cost even when it spends nothing, for example by leaving cash idle.

Four scarce resources

Resource Example decision Opportunity cost
Money Spend £50,000 on a new van The return from the next best use, such as repaying a loan and saving interest
Time The owner spends two days a week on bookkeeping The sales or new clients she could have won in that time
Capacity Use a machine for a low-margin order The contribution from the higher-margin work the machine could have done
People Assign the best engineer to an internal project The customer work, and income, that engineer would have delivered

Money is the easiest to value. Time and management attention are often larger but harder to measure, which is why they are overlooked.

Worked example 1: an order at full capacity

Thornfield Joinery makes oak staircases. Its workshop has 2,400 machine hours a year, and all are used. Each staircase takes 60 hours, so it makes 40 a year. Each staircase sells for £6,500 and has variable costs of £3,800.

A hotel offers an order for 120 oak doors at £350 each. Each door has variable costs of £190 and takes 4 machine hours.

Without opportunity cost, the order looks profitable:

  • Contribution per door = 350 − 190 = £160.
  • Total contribution = 120 × 160 = £19,200.

With opportunity cost: the workshop is full, so the doors would replace staircases.

  • Hours needed for the doors = 120 × 4 = 480 hours.
  • Staircases given up = 480 ÷ 60 = 8.
  • Contribution per staircase = 6,500 − 3,800 = £2,700.
  • Opportunity cost = 8 × 2,700 = £21,600.

The order earns £19,200 but costs £21,600 of contribution forgone, so accepting it would reduce profit by £2,400. Fixed costs are unchanged either way, so they do not affect the comparison.

Interpreting. On these figures Thornfield should decline, unless something not in the numbers changes the balance: the hotel might bring regular future work, there might be a gap in staircase orders that leaves hours unused, or Thornfield could rent extra capacity. If the workshop had 480 spare hours, the opportunity cost of those hours would be close to zero, and the order would add £19,200 of contribution. The same order can be a good or a bad decision depending on the opportunity cost of the resources it uses.

Worked example 2: the owner’s forgone income

Ruth owns Dalby Garden Centre. Its accounts show a profit of £40,000 for the year. Ruth has £200,000 of her own money invested in the business and works full time in it, taking no salary beyond the profit.

  • If she worked as a garden centre manager elsewhere, she estimates she would earn £35,000 a year.
  • If her £200,000 were in a savings account at 4%, it would earn £8,000 a year.

Profit after these opportunity costs = 40,000 − 35,000 − 8,000 = −£3,000.

On the accounts, the business looks profitable. Once Ruth’s forgone salary and interest are counted, she is £3,000 a year worse off than if she sold up, invested the money and took a job.

Interpreting. This does not mean Ruth should close. Opportunity cost here is an estimate, and it leaves out non-financial benefits: independence, the satisfaction of running her own business, and the chance that profit will grow. It also assumes the job and the 4% return are actually available. But it changes the question she should ask: not “am I making a profit?” but “is this the best use of my time and money?” A potential buyer of the business would ask the same.

Impact on decisions

Opportunity cost changes decision making in several ways.

  • It forces comparison. A project is judged against the alternatives, not alone. A project that earns 6% looks fine until a safer option earns 8%.
  • It reveals hidden costs. Idle cash, spare space and staff time have value; using them for one purpose means not using them for another.
  • It depends on circumstances. At full capacity, the opportunity cost of an extra order is high; with spare capacity, it is low. The same decision can therefore have different answers at different times.
  • It separates opportunity cost from sunk cost. Money already spent and unrecoverable is a sunk cost. It has no opportunity cost now, because it cannot be used for anything else. Decisions should look only at future costs and benefits.
  • It links to risk. The next best option may be less risky, so the true cost of a risky project includes the safety given up.
  • It links to strategy. Choosing one strategy can close off others. Committing all cash to new shops may mean being unable to respond to an online rival, a cost that is hard to put in figures.

Limitations

  • The next best alternative is often uncertain, so its value is an estimate.
  • Non-financial benefits are hard to compare with financial ones.
  • In large businesses there may be many alternatives, and the next best is not obvious.
  • Managers may underestimate the opportunity cost of their own time.

Common mistakes

  • Adding up all the rejected options.
  • Saying “the opportunity cost is the money spent”.
  • Treating a sunk cost as part of the decision.
  • Naming the alternative without giving its value when figures are available.
  • Assuming an extra order is profitable without checking whether capacity is spare.

Exam technique

To identify an opportunity cost: name the next best alternative and give its value. To analyse its impact: explain how including it changes the decision and why, then link to the case, such as capacity, cash or the owner’s time. Strong answers end with what would change the conclusion.

Practise with the opportunity cost practice questions. Related content: risk and uncertainty and decision making.

Official syllabus

OCR, Advanced GCE in Business (H431), specification Version 2.1 (January 2026), for first assessment in 2017: area of study Business objectives and strategy, content Opportunity cost.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.