Revision Notes
Cambridge International AS & A Level Geography (9696): 1.4 The human impact – Revision Notes
Revision notes for Cambridge 9696 Geography 1.4 The human impact: key terms, processes, worked examples, exam traps and a self-test with answers.
- Subject
- Geography
- Level
- AS LEVEL
- Topic
- Topic 1 – Hydrology and fluvial geomorphology
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to Cambridge A Level Geography (9696), 2025-2026. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge A Level Geography.
Syllabus points this page covers
9696 (AS Level)
- 1.4 The human impact
Condensed recall for 1.4 The human impact on drainage basins: flood risk and its management. For full explanations, read the Core Physical Geography study guide.
Key terms
| Term | Meaning |
|---|---|
| Flood risk | Likelihood of flooding combined with the exposure of people and property |
| Hard engineering | Built structures that control the river |
| Soft engineering | Working with natural processes and land-use planning |
| Floodplain zoning | Restricting what can be built on land likely to flood |
| Afforestation | Planting trees, to increase interception and slow runoff |
| Washland | Floodplain deliberately left to store flood water |
| Recurrence interval | Average time between floods of a given size, such as a “1 in 100 year” flood |
| Natural flood management | Using natural features, such as woodland, leaky dams and wetlands, to slow and store water upstream |
| Abstraction | Removal of water from rivers or groundwater for use |
How people increase flood risk
- Urbanisation: impermeable surfaces and drains cut infiltration and speed runoff, giving a shorter lag time and higher peak.
- Deforestation: less interception and transpiration, more overland flow, and soil erosion that silts channels.
- Agriculture: compaction, ploughing down slopes and removing hedges.
- Channel changes and building on floodplains: put more people and property in harm’s way.
- Draining wetlands: removes natural storage.
People also change the drainage basin in other ways: dams and reservoirs store water and even out flow downstream; abstraction for irrigation, industry and homes lowers flows and water tables; and climate change may make intense rainfall more frequent. Not every human impact raises flood risk: reservoirs and afforestation lower it.
Physical causes alongside human ones
Prolonged or intense rainfall, rapid snowmelt, saturated or frozen ground, steep slopes and impermeable rock all raise flood risk. A flood usually happens when several of these combine, and human changes then make the response faster or put more people in the way.
Management strategies
| Strategy | Type | Advantage | Disadvantage |
|---|---|---|---|
| Dams and reservoirs | Hard | Store flood water, may generate power | Costly, trap sediment, affect habitats |
| Embankments / levées | Hard | Raise channel capacity | Can raise flood height downstream; failure is severe |
| Channel straightening or deepening | Hard | Moves water away faster | Passes the problem downstream |
| Flood relief channels | Hard | Divert excess water | Costly, land needed |
| Flood walls and demountable barriers | Hard | Protect a town centre in a small space | Can be overtopped; give a false sense of security |
| Floodplain zoning | Soft | Cheap, reduces exposure | Needs enforcement; limits development |
| Afforestation | Soft | Reduces runoff | Slow to take effect |
| Washlands and wetland restoration | Soft | Natural storage, habitats | Land taken from other uses |
| Natural flood management upstream | Soft | Slows water; cheap per site; habitat gains | Effect is small in very large floods |
| Forecasting and warnings | Soft | Allow evacuation | Does not stop flooding |
| Property-level protection and insurance | Soft | Reduces damage; spreads cost | Insurance can be unaffordable in high-risk areas |
The levée effect: building defences encourages more development behind them. When an extreme flood overtops the defences, losses are greater than if the land had been left undeveloped.
Required case study
The syllabus asks for a recent river flood event: its causes, its impacts on people and the environment, and an evaluation of attempts to reduce its impact. Prepare one named event with your own checked facts.
Worked case study outline: Cumbria floods, December 2015 (UK, HIC)
- Causes: Storm Desmond brought prolonged, intense rain to already wet uplands of the Lake District; Honister Pass recorded about 341 mm in 24 hours, a UK record at the time. Steep, impermeable upland catchments responded quickly, and rivers including the Eden, Kent and Derwent reached very high levels. Towns such as Carlisle, Keswick, Appleby and Kendal flooded.
- Impacts on people: thousands of homes and businesses flooded; bridges and roads were destroyed or closed, cutting off some communities; power cuts; people displaced for months; high insurance and repair costs.
- Impacts on the environment: riverbank and hillslope erosion, landslides, gravel deposited on farmland, damage to habitats and pollution from flooded sewage works.
- Attempts to reduce impact: Carlisle had flood defences built after severe floods in 2005, but these were overtopped in 2015. Afterwards the Environment Agency and partners produced a Cumbria flood action plan combining raised and extended defences, better warnings and maintenance, and natural flood management upstream (tree planting, leaky dams, peatland restoration).
- Evaluation: defences reduced damage in smaller floods but could not cope with an extreme event; upstream measures are cheaper and bring wider benefits, but their effect on very large floods is uncertain; the event raised the question of whether defence standards should rise as heavy rainfall becomes more likely.
Contrast (MIC): the 2022 Pakistan floods, caused by extreme monsoon rainfall, affected around 33 million people and killed over 1700. Weak embankments, poor drainage and limited warnings in low-lying Sindh made impacts far larger, which shows how development level shapes vulnerability.
Annotated model paragraph
“Evaluate attempts to reduce the impact of one river flood.”
Carlisle’s defences, built after 2005, were overtopped in 2015 (limitation of hard engineering). Upstream natural flood management was added to slow runoff (response), though its effect in extreme floods is uncertain (qualification). A mix of defences, warnings and land management is likely to be most effective (judgement).
Exam traps
- Floods have both human and physical causes; separate them.
- Evaluate: who benefits, who pays, and does the scheme just move the problem?
- Do not claim hard engineering always fails or soft always works.
- “Recent” means you should know a named event with a date, not a general type of flood.
- A “1 in 100 year” flood can happen in two consecutive years; it is an average probability.
Self-test
- Why does urbanisation increase flood risk?
- Give one hard and one soft engineering strategy.
- Why may channel straightening be criticised?
- How does afforestation reduce flood risk?
- What is a washland?
- What must the 1.4 case study evaluate?
- What is the levée effect?
- Give two physical causes of the 2015 Cumbria floods.
- What is natural flood management?
- What does a recurrence interval of 100 years mean?
- Why did the 2022 Pakistan floods have such large impacts?
Answers: 1. Impermeable surfaces and drains reduce infiltration and speed water to the channel. 2. Hard: dam or embankment. Soft: floodplain zoning or afforestation. 3. It moves water faster downstream and can worsen flooding there. 4. Interception and transpiration reduce and delay runoff. 5. Floodplain left to store flood water. 6. Attempts to reduce the impact of the flood. 7. Defences encourage development behind them, so losses are greater when they fail. 8. Intense, prolonged rainfall from Storm Desmond; saturated ground; steep, impermeable catchments. 9. Using woodland, leaky dams, wetlands and peat to slow and store water upstream. 10. A flood of that size has about a 1 per cent chance in any year. 11. Extreme rainfall combined with weak embankments, poor drainage, limited warnings and high vulnerability.
More resources on this topic
Related resources
-
Revision notes
Cambridge International AS & A Level Geography (9696): 1.1 The drainage basin system – Revision Notes
Revision notes for Cambridge 9696 Geography 1.1 The drainage basin system: key terms, processes, worked examples, exam traps and a self-test with answers.
Geography · Cambridge · AS Level
Revise topic -
Revision notes
Cambridge International AS & A Level Geography (9696): 1.3 River channel processes and landforms – Revision Notes
Revision notes for Cambridge 9696 Geography 1.3 River channel processes and landforms: key terms, processes, exam traps and a self-test with answers.
Geography · Cambridge · AS Level
Revise topic -
Study guides
Cambridge International AS & A Level Geography (9696): 1.2 Discharge relationships within drainage basins
Study guide to Cambridge 9696 Geography 1.2: storm and annual hydrograph components, climatic and basin influences, worked calculations and model answers.
Geography · Cambridge · AS Level
Read guide
Studying Geography?
This page is free and stays free. Marlbridge is not offering Geography classes at the moment, so there is no tuition to book for it. The free study resources stay open to everyone.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.