Practice Questions
Cambridge International AS & A Level Geography (9696): 1.4 The human impact – Practice Questions
Original practice questions with marked answers on Cambridge 9696 Geography 1.4: land use, abstraction, recurrence intervals and hard and soft flood management.
- Subject
- Geography
- Level
- AS LEVEL
- Topic
- Topic 1 – Hydrology and fluvial geomorphology
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to Cambridge A Level Geography (9696), 2025-2026. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge A Level Geography.
Syllabus points this page covers
9696 (AS Level)
- 1.4 The human impact
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.
These questions cover 1.4 The human impact in Topic 1, Hydrology and fluvial geomorphology, from Paper 1 Core Physical Geography. All data are fictional unless a question asks you to use your own case study. Revise first with the 1.4 human impact study guide and the 1.4 revision notes.
Section A
1. Define the term “recurrence interval”. [2]
2. Explain how abstraction of groundwater can affect the flow of a river. [3]
3. Outline how a diversion spillway reduces flood risk. [2]
4. Explain why urbanisation can reduce the baseflow of a river. [2]
5. State the probability of a “1 in 50 year” flood occurring in any one year, and explain why two such floods could happen in consecutive years. [3]
6. Explain how a reservoir changes the discharge of a river downstream of its dam. [3]
Section B
7. The annual maximum discharges (cumecs) of the fictional River Orren over 11 years were: 95, 140, 120, 210, 88, 175, 132, 101, 160, 115, 240.
(a) Using T = (n + 1) / m, calculate the recurrence interval of the 175-cumec flood. Show your working. [2]
(b) Calculate the annual probability of a flood of 240 cumecs or more. [2]
(c) Suggest two limitations of using this record to predict future flood risk. [2]
8. The table shows storm hydrographs for the same fictional basin before and after a new town was built, for storms of similar size.
| Before | After | |
|---|---|---|
| Lag time (hours) | 9 | 4 |
| Peak discharge (cumecs) | 40 | 72 |
| Pre-storm baseflow (cumecs) | 6 | 4 |
(a) Calculate the percentage change in peak discharge. Show your working. [2]
(b) Explain the changes shown in the table. [4]
9. Compare the effects of deforestation and afforestation on the stores and flows of a drainage basin. [6]
10. Explain how flood forecasts and warnings reduce the impacts of river floods, and why they do not always succeed. [5]
11. Evaluate the use of soft engineering to reduce the impacts of river floods. [8]
12. With reference to a recent river flood event you have studied, assess the relative importance of physical and human causes of the flood. [10]
Answers
1. The average time interval between floods of a given size or greater [1], calculated from a long record of annual maximum discharges [1]. [2]
2. Pumping water from wells lowers the water table [1]. Less groundwater then seeps into the channel, so baseflow is reduced [1]. In dry periods river flow falls sharply and springs or small streams may dry up [1]. [3]
3. It carries excess water away from the main channel into an overflow channel or storage area [1], so the discharge passing the protected area stays below bankfull [1]. [2]
4. Impermeable surfaces stop water infiltrating and drains carry it quickly to the river [1], so less water percolates to recharge groundwater, lowering the water table that feeds baseflow [1]. [2]
5. 1 / 50 = 2% in any one year [1]. The probability is the same every year, because each year is independent [1], so one flood does not lower the chance of another the next year [1]. [3]
6. The reservoir stores floodwater and releases it gradually, so downstream flood peaks are lower [1]. Releases in dry periods can keep flows higher than before, so the annual regime is flattened [1]. Evaporation from the reservoir and abstraction for supply or irrigation can reduce total discharge downstream [1]. [3]
7. (a) 175 cumecs is ranked 3rd of 11 [1]; T = (11 + 1) / 3 = 4 years [1].
(b) 240 cumecs is ranked 1st, so T = 12 / 1 = 12 years [1]; probability = 1 / 12 = about 8.3% per year [1].
(c) Eleven years is too short to estimate the size of rare, large floods reliably [1]; land-use change or climate change may make past discharges a poor guide to the future [1]. [6]
8. (a) (72 - 40) / 40 x 100 [1] = an 80% increase [1].
(b) Roads, roofs and pavements are impermeable, so infiltration is reduced and overland flow increases [1]. Drains and gutters carry water rapidly to the river, shortening the lag time from 9 to 4 hours [1]. More water arrives at the same time, so the peak rises from 40 to 72 cumecs [1]. Less water recharges groundwater, so baseflow falls from 6 to 4 cumecs [1]. [6]
9. Deforestation removes the interception store, so more rain reaches the ground quickly [1], whereas afforestation increases interception and interception loss [1]. Deforestation reduces transpiration, leaving soils wetter [1], while afforestation increases transpiration and so creates more soil water storage capacity [1]. Deforested soils are often compacted or eroded, reducing infiltration and increasing overland flow [1], while tree roots in afforested areas raise infiltration and throughflow, though only once trees are established [1]. [6]
10. Forecasts based on rainfall radar, river gauges and models predict where and when flooding will occur [1]. Warnings give people time to move to safety, reducing deaths [1], and to move possessions, vehicles and livestock, reducing losses [1]. They may fail if forecasts are inaccurate, especially in small, flashy basins where there is little time [1], or if warnings do not reach people, are not trusted or are ignored [1]. [5]
11. Floodplain zoning keeps housing out of high-risk areas, reducing exposure at low cost [1], but it is hard to apply where towns already occupy the floodplain [1]. Drainage basin management such as tree planting and leaky dams slows runoff [1] and brings wider benefits for wildlife, soils and water quality [1]. However, its effect on very large floods is uncertain and it takes years to work [1]. Wetland conservation stores floodwater, but needs large areas of land that may be valuable for farming [1]. River restoration reconnects rivers to their floodplains and improves habitats [1]. Overall, soft engineering is sustainable and cheap but usually works best alongside warnings and some hard engineering where people are concentrated [1]. [8]
12. Credit located, dated detail from any recent river flood.
Physical causes: identifies the rainfall event, such as its duration, intensity or total, with detail [1]; explains the role of antecedent conditions such as saturated ground [1]; explains how basin characteristics such as steep slopes or impermeable rock increased runoff [1]; considers other physical factors such as snowmelt or tidal conditions where relevant [1].
Human causes: explains how land use such as urbanisation or deforestation increased runoff [1]; explains how building on the floodplain increased exposure to the flood [1]; considers the role of engineering, such as defences that failed or were overtopped, or channel changes upstream [1].
Assessment: recognises that physical causes usually trigger the flood while human causes increase its size or impact [1]; weighs the two for the named event with evidence [1]; reaches a clear, supported judgement on which mattered more [1]. [10]
Where marks are usually lost
- Ranking floods from smallest to largest instead of largest to smallest.
- Saying a 1 in 100 year flood “cannot happen again for 100 years”.
- Explaining urban hydrographs with no reference to the figures given.
- Listing management methods without saying how well they work.
- Writing a flood case study that describes impacts but never assesses causes.
Related resources
-
Revision notes
Cambridge International AS & A Level Geography (9696): 1.2 Discharge relationships within drainage basins – Revision Notes
Revision notes for Cambridge 9696 Geography 1.2 Discharge relationships within drainage basins: key terms, processes, exam traps and a self-test with answers.
Geography · Cambridge · AS Level
Revise topic -
Revision notes
Cambridge International AS & A Level Geography (9696): 1.4 The human impact – Revision Notes
Revision notes for Cambridge 9696 Geography 1.4 The human impact: key terms, processes, worked examples, exam traps and a self-test with answers.
Geography · Cambridge · AS Level
Revise topic -
Revision notes
Cambridge International AS & A Level Geography (9696): 1.1 The drainage basin system – Revision Notes
Revision notes for Cambridge 9696 Geography 1.1 The drainage basin system: key terms, processes, worked examples, exam traps and a self-test with answers.
Geography · Cambridge · AS Level
Revise topic
Studying Geography?
This page is free and stays free. Marlbridge is not offering Geography classes at the moment, so there is no tuition to book for it. The free study resources stay open to everyone.
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.