Skip to content
Marlbridge

Revision Notes

AQA A-Level Business (7132): Improving quality – Revision Notes

Condensed recall for AQA A-level Business 7132 section 3.4.4: quality assurance against quality control, benefits and difficulties of quality, consequences of poor quality, with a self-test.

Subject
Business
Level
A LEVELS
Topic
Operational management
Updated

Aligned to AQA A Level Business (7132), For first teaching from September 2023. Official specification .

Syllabus page (what it covers and how it is assessed): AQA A Level Business.

Syllabus points this page covers

7132

  • 3.4.4 Making operational decisions to improve performance: improving quality

This page covers 1 of the 5 subtopics in topic 4, Operational management.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (7132).

Condensed notes on section 3.4.4 Making operational decisions to improve performance: improving quality of AQA A-level Business (7132, for first teaching from September 2023). The full explanations and the Penhallow Appliances worked example are in the improving quality study guide; exam-style questions are in the improving quality practice set.

Specification content

  • Methods of improving quality, including quality assurance against quality control.
  • The benefits and difficulties of improving quality.
  • The consequences of poor quality.

Key terms

Term Meaning
Quality How well a product or service meets customers’ expectations and needs
Quality control (QC) Checking output to find and remove defective items
Quality assurance (QA) A system that builds quality into every stage to prevent defects
Total quality management (TQM) Business-wide commitment to “right first time”
Quality circle Small group that meets to solve quality problems
Kaizen Continuous improvement through small changes
Benchmarking Comparing performance with the best in the industry
Defect rate Proportion of output that is faulty

QC against QA

Quality control Quality assurance
Focus Find defects Prevent defects
Timing During or after production Throughout: design, suppliers, process
Who Inspectors Everyone
Costs Inspection, rework, scrap Training, systems, design
Culture Checking Ownership and improvement
  • QC strengths: catches defects before customers; simple; gives data. Weaknesses: finds faults after they occur; inspection adds cost but no value; sampling can miss faults.
  • QA features: clear standards; supplier checks; training and empowerment; quality circles; kaizen; benchmarking; TQM.
  • Most firms use both.

Other methods

Better design and materials; better equipment and maintenance; customer feedback and mystery shoppers; automated inspection and sensors.

The four costs of quality

Type Meaning Example
Prevention Stopping defects Training, supplier checks
Appraisal Finding defects Inspection, testing
Internal failure Defects found before delivery Rework, scrap
External failure Defects found by customers Refunds, recalls, lost reputation

External failure is usually the most damaging.

Worked example to remember

20,000 kettles a month.

  • Control: 5% defective = 1,000; inspection catches 90% = 900 reworked at £6 = £5,400; 100 reach customers at £40 = £4,000; inspection £8,000; total £17,400.
  • Assurance: £10,000 on prevention; defect rate 1.5% = 300; 270 reworked at £6 = £1,620; 30 reach customers at £40 = £1,200; inspection £3,000; total £15,820.
  • Saving £1,580 a month, plus fewer lost customers and better morale. The case depends on the defect rate really falling.

Benefits of improving quality

Fewer defects and less waste; fewer returns and claims; satisfaction and loyalty; better reputation and room for higher prices; lower total costs if prevention beats correction; competitive advantage; motivated staff; ability to win demanding contracts.

Difficulties

Cost and time to see returns; cultural change and resistance; conflict with cost, speed or flexibility; customers may not pay more; measurement is hard in services; diminishing returns near perfection.

Consequences of poor quality

Lost sales; damaged reputation (reviews, social media); rework, refunds, recalls; legal action and fines; forced price cuts; low staff morale; lost retailer or supplier contracts; in extreme cases, failure of the business.

Quality in services and sampling

  • In services, a fault cannot be inspected out before the customer sees it, so assurance (recruitment, training, standards, good processes) matters more than control. Feedback, reviews and mystery shoppers show where standards slip.
  • Sampling saves cost and is essential when testing destroys the product. Defect rate = faulty items ÷ sample size × 100. Expected faulty items in a batch = batch size × defect rate.
  • A sample must be random and large enough to be reliable. The acceptable defect rate should reflect the cost of failure and be far lower for safety-critical goods.

How to write a good answer

  • Use “prevent” for assurance and “detect” for control.
  • Apply the method to the product or service in the case.
  • Weigh the cost of improving quality against the cost of failure (rework, refunds, recalls, lost customers), then judge what the business should do.

Exam traps

  • QC detects; QA prevents.
  • Quality does not mean luxury; it means meeting the customer’s needs consistently.
  • QA is not “more inspections”.
  • Evaluate: compare the cost of improving with the cost of failure.
  • Link the method to the business in the case (batch sampling for factories; training for services).

Self-test

  1. Define quality assurance.
  2. Define quality control.
  3. Give one weakness of quality control.
  4. Name two features of a quality assurance system.
  5. What is a quality circle?
  6. Give two benefits of improving quality.
  7. Give two difficulties of improving quality.
  8. Which type of quality cost is a recall of faulty products?
  9. A sample of 500 items contains 15 faulty items. Calculate the defect rate.
  10. Using that rate, how many faulty items would you expect in a batch of 12,000?
  11. Give two consequences of poor quality.
  12. Why might spending more on prevention reduce total quality costs?

Answers

  1. A system that builds quality into every stage of the process to prevent defects.
  2. Checking output to find and remove items that do not meet the standard.
  3. Any one: finds faults only after they occur; inspection adds cost but no value; sampling may miss faults.
  4. Any two: clear standards; supplier checks; training; quality circles; kaizen; benchmarking; TQM.
  5. A small group of workers that meets regularly to find solutions to quality problems.
  6. Any two: fewer defects; fewer returns; customer loyalty; better reputation; competitive advantage.
  7. Any two: cost; time; resistance to change; conflict with cost or speed objectives; measurement difficulty.
  8. External failure.
  9. 15 ÷ 500 × 100 = 3%.
  10. 12,000 × 0.03 = 360 faulty items.
  11. Any two: lost sales; damaged reputation; rework and refund costs; legal action; lower prices.
  12. Prevention reduces defects, so fewer faulty items need rework, scrapping, refunds or recall, and these failure costs, especially external ones, are often larger than the prevention spending.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.