Study Guides
AQA A-Level Business (7132): Managing inventory and supply chains
Study guide to AQA A-level Business 7132 section 3.4.5: matching supply to demand, inventory control charts, choosing suppliers, managing supply chains and outsourcing.
- Subject
- Business
- Level
- A LEVELS
- Topic
- Operational management
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Salman Ahmad (what this means)
Aligned to AQA A Level Business (7132), For first teaching from September 2023. Official specification .
Syllabus page (what it covers and how it is assessed): AQA A Level Business.
Syllabus points this page covers
7132
- 3.4.5 Making operational decisions to improve performance: managing inventory and supply chains
This page covers 1 of the 5 subtopics in topic 4, Operational management.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Business (7132).
This guide goes deeper into section 3.4.5 Making operational decisions to improve performance: managing inventory and supply chains of the AQA AS and A-level Business specification (7132, for first teaching from September 2023). The specification’s content is:
- how to manage supply to match demand and the value of doing so, including outsourcing, temporary and part-time employees and producing to order
- influences on the amount of inventory held, including interpreting inventory control charts, lead time, re-order levels, buffer inventory and re-order quantities
- influences on the choice of suppliers
- how to manage the supply chain effectively and efficiently, and the value of doing so
- the value of outsourcing.
The wider operational management study guide covers the whole topic. The ideas of Just in Time and Just in Case are explained in the efficiency and productivity guide. Companion pages: revision notes and practice questions. All businesses and figures are invented.
Matching supply to demand
Demand is rarely steady. A business that cannot match supply to demand either has unsold goods and idle staff (supply above demand) or lost sales and unhappy customers (demand above supply). Matching the two reduces waste, protects customer service and keeps costs under control. The value is higher profit, better capacity use and a stronger reputation.
Ways of matching supply to demand
| Method | How it works | Advantages | Disadvantages |
|---|---|---|---|
| Outsourcing | A task or production is given to an outside firm | Extra capacity for peaks without investment; access to specialist skills; costs become variable | Less control over quality and timing; supplier may fail; confidentiality risk; possible damage to staff morale |
| Temporary and part-time employees | Staff hired for peaks or flexible hours | Labour costs follow demand; can be hired quickly; fewer long-term costs | Less trained and committed; recruitment and training costs; lower loyalty; quality may vary |
| Producing to order | Goods are made only after a customer places an order | No unsold stock; low inventory costs; products can be customised | Customers wait; peaks of orders may overload capacity; less able to use economies of scale |
| Holding inventory (build up before peaks) | Produce in quiet times and store | Smooths production and staffing; goods ready at once | Storage, insurance and finance costs; risk of obsolescence |
| Flexible capacity and pricing | Overtime, extra shifts, off-peak discounts | Moves demand towards quiet periods | Overtime is costly; discounts reduce margins |
A seasonal retailer might combine several: temporary staff for the Christmas peak, an outsourced warehouse, and discounts in January to shift demand.
Inventory management
Inventory (stock) includes raw materials, work in progress and finished goods. Holding inventory protects against supply problems and demand surges, but it costs money, so businesses try to hold the right amount.
Influences on the amount of inventory held
- Demand: the faster stock sells, the more is needed, and unpredictable demand calls for a bigger buffer.
- Lead time: the time between ordering and receiving; longer lead times need more inventory to cover the wait.
- Reliability of suppliers: unreliable deliveries need more buffer.
- Cost of holding stock: storage space, insurance, security, finance and the risk of damage.
- Nature of the product: perishable or fashionable goods cannot be stored long; durable goods can.
- Cost of running out: if a stock-out stops production or loses key customers, the business holds more.
- Discounts for bulk orders encourage larger orders and higher stock.
- Production method: JIT keeps stocks low; JIC holds more.
- Cash available: stock ties up money.
Inventory control terms
| Term | Meaning |
|---|---|
| Lead time | Time between placing an order and its delivery |
| Buffer inventory | The minimum stock held as a safety margin against unexpected demand or late delivery |
| Re-order level | The stock level at which a new order is placed |
| Re-order quantity | The amount ordered each time |
| Maximum inventory | The highest stock level, reached just after a delivery |
A basic relationship: re-order level = (usage per day × lead time in days) + buffer inventory.
Inventory control charts
An inventory control chart plots stock level against time. It shows stock falling as materials are used, a re-order when the level reaches the re-order level, and stock jumping back up on delivery.
Worked example. A bakery uses 100 kg of flour a day. The lead time for deliveries is 4 days. The buffer is 200 kg. The re-order quantity is 800 kg.
- Re-order level = (100 × 4) + 200 = 600 kg.
- Maximum inventory = buffer + re-order quantity = 200 + 800 = 1,000 kg.
| Day | Stock at start of day (kg) | Event |
|---|---|---|
| 0 | 1,000 | Delivery just arrived |
| 1 | 900 | |
| 2 | 800 | |
| 3 | 700 | |
| 4 | 600 | Reaches re-order level; order placed |
| 5 | 500 | |
| 6 | 400 | |
| 7 | 300 | |
| 8 | 200 | Order arrives; stock rises to 1,000 |
On a chart, this shows a saw-tooth line: a straight fall from 1,000 to 200 over 8 days, then a vertical jump back to 1,000. The horizontal line at 200 is the buffer, and the horizontal line at 600 is the re-order level. The horizontal distance between the point where the stock line crosses the re-order level (day 4) and the delivery (day 8) is the lead time.
What if conditions change?
- If demand rises to 130 kg a day, usage in the 4-day lead time is 130 × 4 = 520 kg. Stock at delivery would be 600 − 520 = 80 kg, so part of the buffer has gone. The re-order level should rise: (130 × 4) + 200 = 720 kg.
- If the lead time lengthens to 6 days at 100 kg a day, usage during the wait is 600 kg and stock at delivery would be 0 kg. The buffer has been used up and any further delay means a stock-out.
Re-order quantity and cost. Annual use is 25,000 kg. Each order costs £60 to place and process, and holding one kg in average inventory costs £3 a year.
- Re-order quantity of 800 kg: orders = 25,000 ÷ 800 = 31.25; ordering cost = 31.25 × £60 = £1,875. Average inventory = 800 ÷ 2 + 200 = 600 kg; holding cost = 600 × £3 = £1,800. Total = £3,675.
- Re-order quantity of 1,600 kg: orders = 15.625; ordering cost = £937.50. Average inventory = 800 + 200 = 1,000 kg; holding cost = £3,000. Total = £3,937.50.
Larger orders mean fewer orders but higher holding costs, so the best quantity balances the two. Here 800 kg is cheaper than 1,600 kg.
Limits of control charts: they assume steady use and a fixed lead time; they say nothing about quality; and modern software that updates stock continuously and orders automatically (technology) is more accurate and responsive than manual charts.
Choosing suppliers
Influences on the choice include:
- Price and payment terms (credit period, discounts).
- Quality and consistency of materials.
- Reliability of delivery and lead time, vital for JIT.
- Flexibility: the ability to cope with changes in volume or specification.
- Location: nearby suppliers cut transport time, cost and carbon emissions.
- Reputation and financial stability: will the supplier survive?
- Ethical and environmental standards: fair labour practices, sustainable materials. Customers and the media increasingly hold businesses responsible for their suppliers’ behaviour.
- Relationship and communication, including data links.
- Using one supplier (strong relationship, bulk discounts, but dependent) or several (less risk, but less loyalty and smaller discounts).
Managing the supply chain
The supply chain is the whole sequence of organisations and activities from raw materials to the final customer: suppliers, manufacturers, distributors, retailers. Managing it effectively means coordinating all of these to deliver the right goods, in the right quantity, at the right time and cost.
Ways to manage it well:
- Share information: sales data, forecasts and stock levels, often through linked IT systems.
- Build long-term relationships and agree clear standards, with a few trusted suppliers.
- Monitor performance (delivery times, defect rates) and audit suppliers.
- Reduce lead times and remove waste, as in lean systems.
- Manage risk: have backup suppliers, avoid single points of failure, and watch for ethical issues.
- Use technology: tracking, automated ordering and analytics.
Value: lower costs, fewer stock-outs, better quality, quicker response to customers, and protection of reputation. Difficulties: global supply chains are long and complex; one failure can halt production; relationships take time to build; ethical standards are hard to check beyond the first supplier; and tight, lean chains have little slack.
The value of outsourcing
Outsourcing means paying another firm to carry out an activity, such as manufacturing, delivery, IT or payroll.
- Benefits: lower costs through the supplier’s economies of scale; access to expertise and technology; flexibility to match demand; managers can concentrate on core strengths; no need for capital investment.
- Drawbacks: less control over quality and timing; dependence on the supplier; the supplier may serve competitors; confidentiality risks; possible hidden costs in managing the contract; effect on morale and local jobs; reputation risk if the supplier behaves unethically.
Outsourcing suits activities that are not core to what makes the business distinctive, or that need specialist skills the firm lacks.
Technique for exam questions
- When asked to interpret a chart, state the re-order level, buffer, lead time and maximum stock, and say what would happen if demand or lead time changed.
- Use calculations to support arguments about cost.
- Evaluate by considering the product (perishable or durable), the reliability of suppliers, the cost of a stock-out against the cost of holding stock, and the importance of control over quality.
Common mistakes
- Mixing up buffer inventory (a minimum) with maximum inventory.
- Forgetting to include the buffer when calculating the re-order level.
- Treating outsourcing as simply cheaper, ignoring loss of control.
- Choosing a supplier on price only.
- Ignoring the ethical and environmental side of supply chains.
- Saying “hold less stock” is always better without discussing stock-outs.
Next: test your recall with the revision notes and practise with the practice questions.
Written against the AQA AS and A-level Business specification (7132), section 3.4.5. Always check the current specification for your examination year.
Related resources
-
Practice questions
AQA A-Level Business (7132): Managing inventory and supply chains – Practice Questions
Original practice questions with mark-scheme answers on inventory control, supplier choice, supply chains and outsourcing for AQA A-level Business 7132.
Business · AQA · A Level
Try questions -
Revision notes
AQA A-Level Business (7132): Managing inventory and supply chains – Revision Notes
Condensed recall for AQA A-level Business 7132 section 3.4.5: matching supply to demand, inventory control charts, suppliers, supply chains and outsourcing, with a self-test.
Business · AQA · A Level
Revise topic -
Study guides
AQA A-Level Business (7132): Setting operational objectives
Study guide to AQA A-level Business 7132 section 3.4.1: the value of operational objectives covering costs, quality, speed of response, flexibility, environmental objectives and added value.
Business · AQA · A Level
Read guide
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.