AQA A-Level Business (7132): Managing inventory and supply chains – Practice Questions

Original practice questions with mark-scheme answers on inventory control, supplier choice, supply chains and outsourcing for AQA A-level Business 7132.

Subject
Business
Level
A LEVELS
Topic
Operational management
Updated

Aligned to AQA A Level Business (7132), For first teaching from September 2023. Official specification .

Syllabus page (what it covers and how it is assessed): AQA A Level Business.

Syllabus points this page covers

7132

  • 3.4.5 Making operational decisions to improve performance: managing inventory and supply chains

This page covers 1 of the 5 subtopics in topic 4, Operational management.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Business (7132).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.

These questions cover section 3.4.5 Making operational decisions to improve performance: managing inventory and supply chains of the AQA A-level Business (7132) specification. All businesses and figures are invented. Revise first with the inventory and supply chains study guide and the inventory and supply chains revision notes.

Section A: Short-answer questions

1. A business uses 40 units of a part each day. The lead time is 5 days and the buffer inventory is 60 units. What is the re-order level? [1]

A: 100 units

B: 200 units

C: 260 units

D: 300 units

2. Which one of the following best describes buffer inventory? [1]

A: The largest amount of stock the business can store

B: The amount ordered each time

C: The minimum stock held as a safety margin

D: The stock at the start of the year

3. Define the term “re-order level”. [2]

4. Explain one advantage to a business of producing to order. [3]

5. Greaves Garden Centre sells compost. It sells 30 bags a day, the lead time is 3 days, the buffer is 50 bags and the re-order quantity is 240 bags.

(a) Calculate the re-order level. [2]

(b) Calculate the maximum inventory. [1]

(c) The supplier’s lead time increases to 5 days. Calculate what would happen to stock when the delivery arrives, assuming orders are still placed at the original re-order level. [2]

6. A workshop uses 12,000 units of a part a year. Each order costs £40 to place. Holding one unit in average inventory costs £2 a year. Buffer inventory is 100 units. Average inventory is the re-order quantity ÷ 2 plus the buffer.

(a) Calculate the total annual ordering and holding cost if the re-order quantity is 1,000 units. [2]

(b) Calculate the total annual ordering and holding cost if the re-order quantity is 2,000 units. [2]

(c) State which re-order quantity the workshop should prefer, and why. [1]

7. Explain one risk of a business relying on a single supplier. [2]

Section B: Structured questions

8. Analyse two benefits to a small online retailer of outsourcing its delivery service. [6]

9. Alpine Rise is a ski resort with very busy winters and a quiet summer. Assess whether employing temporary and part-time staff is the best way for the resort to match supply to demand. [9]

10. Analyse the factors a supermarket chain should consider when choosing suppliers of fresh fruit. [6]

11. Explain two difficulties of managing a supply chain that stretches across several countries. [4]

12. A car manufacturer is deciding whether to hold large buffer inventories of components. Evaluate whether it should do so. [12]

Answers

1. C [1]. (40 × 5) + 60 = 260 units. [1]

2. C [1]. Buffer inventory is the minimum stock kept as protection against late delivery or unexpected demand. [1]

3. The level of stock at which a new order is placed [1], calculated as usage during the lead time plus the buffer inventory [1]. [2]

4. There is no unsold finished stock, so storage costs and the risk of goods becoming obsolete are avoided [1]. Cash is not tied up in stock, so the business has more money for other uses [1]. Products can also be tailored to each customer’s wishes, which may allow a higher price [1]. [3]

5. (a) Usage during lead time = 30 × 3 = 90 bags [1]. Re-order level = 90 + 50 = 140 bags [1].

(b) Maximum inventory = buffer + re-order quantity = 50 + 240 = 290 bags [1].

(c) Usage during 5 days = 30 × 5 = 150 bags [1]. Stock would be 140 − 150 = −10, so the buffer is used up and the centre would run out about a third of a day before the delivery arrives, leaving 10 bags of unmet demand [1]. [5]

6. (a) Orders = 12,000 ÷ 1,000 = 12; ordering cost = 12 × £40 = £480 [1]. Average inventory = 500 + 100 = 600; holding cost = 600 × £2 = £1,200; total = £1,680 [1].

(b) Orders = 6; ordering cost = £240. Average inventory = 1,000 + 100 = 1,100; holding cost = £2,200 [1]; total = £2,440 [1].

(c) 1,000 units, because the total cost is lower (£1,680 against £2,440), the saving on ordering being outweighed by higher holding costs [1]. [5]

7. If the single supplier fails, for example through a strike or financial collapse, the business has no alternative source [1], so production could stop and customers be let down [1]. Accept: a single supplier may use its bargaining power to raise prices. [2]

8. Benefit 1: lower fixed costs and no need for investment [1]. A small retailer does not need to buy vans or employ drivers [1], so costs vary with the number of orders, and cash is saved for stock and marketing [1]. Benefit 2: access to expertise and flexibility [1]. A courier firm has routes, tracking systems and spare capacity [1], so the retailer can cope with peak periods and give customers tracking information without building it itself [1]. [6]

9. For: demand in winter is high and in summer low, so temporary and part-time staff mean wage costs fall when demand falls [1]. Seasonal workers can be recruited quickly and without long-term contracts [1]. It avoids redundancy costs in the summer [1]. Against: seasonal staff may have less training and commitment, so service quality may suffer [1]. Recruiting and training new staff every year is costly and takes time [1]. Skilled instructors may go elsewhere if offered only seasonal work [1]. Other methods may help: off-peak pricing, summer activities or outsourcing some services [1]. Judgement: temporary and part-time staff are a sensible main method for peaks, but the resort should keep a core of permanent skilled staff, and encourage returning seasonal workers to protect quality [1], while developing summer activities so that the resort earns more year round [1]. [9]

10. Quality and freshness [1], because fruit is perishable and customers judge the supermarket on it. Reliability and speed of delivery [1], because late delivery means waste and empty shelves [1]. Price and payment terms [1], which affect margins. Location and transport [1], as nearer suppliers give fresher produce and lower transport emissions. Ethical and environmental standards [1], since customers expect fair labour practices and sustainable farming. [6]

11. Difficulty 1: length and complexity [1]. Delays at borders, shipping problems or events in one country can interrupt supply, with long lead times meaning large buffers or the risk of stock-outs [1]. Difficulty 2: controlling quality and ethical standards [1]. The business cannot easily inspect distant suppliers, so poor working conditions or environmental damage may go unnoticed, harming its reputation [1]. Accept: exchange rate changes, different laws, communication difficulties. [4]

12. For: a large buffer protects against late deliveries or a supplier’s failure, so the production line is not stopped [1]. A stop in production is very costly because of idle staff and missed delivery dates [1]. Components can be bought in bulk at a discount [1]. It protects against sudden demand rises [1]. Against: holding large stocks costs money in storage space, insurance and finance [1]. Parts may become obsolete if designs change [1]. Large inventories hide problems such as poor quality or unreliable suppliers [1]. It conflicts with lean production aims [1]. Components may be damaged or stolen [1]. Factors: how reliable the suppliers are and how long the lead times, the cost of a stoppage compared with holding costs, and how quickly designs change [1]. Judgement: a moderate buffer is wise for critical, long-lead-time components, because the cost of stopping the line is high [1], but not for items that are cheap to get quickly or likely to become outdated; the buffer should be reviewed regularly using supplier performance data [1]. [12]

Examiner insight: Show the buffer inventory calculation in the re-order level, and always link inventory choices to the cost of running out in the case.

Where marks are usually lost

  • Leaving the buffer out of the re-order level.
  • Treating buffer inventory as the same as maximum inventory.
  • Saying outsourcing is always cheaper, with no mention of control.
  • Choosing suppliers on price alone.
  • Suggesting “hold less stock” without weighing stock-outs.
  • Not applying general points to the business named.