Practice Questions
AQA A-Level Business (7132): Setting operational objectives – Practice Questions
Original practice questions with mark-scheme answers on operational objectives, added value and trade-offs between objectives for AQA A-level Business 7132.
- Subject
- Business
- Level
- A LEVELS
- Topic
- Operational management
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Salman Ahmad (what this means)
Aligned to AQA A Level Business (7132), For first teaching from September 2023. Official specification .
Syllabus page (what it covers and how it is assessed): AQA A Level Business.
Syllabus points this page covers
7132
- 3.4.1 Setting operational objectives
This page covers 1 of the 5 subtopics in topic 4, Operational management.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Business (7132).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs – examination boards hold copyright in their own papers. Use these alongside the official past papers from your board or school.
These questions cover section 3.4.1 Setting operational objectives of the AQA A-level Business (7132) specification. All businesses and figures are invented. Revise first with the operational objectives study guide and the operational objectives revision notes.
Section A: Short-answer questions
1. A product sells for £25 and uses £9 of bought-in materials. What is its added value? [1]
A: £9
B: £16
C: £25
D: £34
2. Which one of the following is an environmental operational objective? [1]
A: Cut the time taken to deliver orders from three days to one
B: Reduce the defect rate to under 1%
C: Reduce the amount of packaging waste sent to landfill by 30%
D: Increase the number of products offered
3. Define the term “flexibility” in operations. [2]
4. Explain one risk to a business of setting a strict cost-reduction objective. [3]
5. Pelham Pottery sells a mug for £14. The bought-in clay, glaze and packaging cost £5.60 per mug.
(a) Calculate the added value per mug in pounds and as a percentage of the selling price. [2]
(b) A new design allows Pelham to sell the mug at £16 with no change in bought-in costs. Calculate the new added value as a percentage of the selling price. [2]
(c) Explain one way, other than raising the price, in which Pelham could increase added value. [2]
6. A bottling firm spends £150,000 a year on plastic. Currently 10% of this is wasted. It sets an objective to cut waste to 6%.
(a) Calculate the annual saving in the cost of wasted plastic. [2]
(b) Explain one reason, other than cost, why the firm may set this objective. [2]
7. Explain what is meant by an “order winner”. [2]
Section B: Structured questions
8. Analyse two ways in which a strong quality objective could benefit a restaurant chain. [6]
9. Skyline Air is a low-cost airline. It is considering giving priority to a speed-of-response objective (fast turnaround of aircraft) over its cost objective. Assess whether it should do so. [9]
10. Analyse how operational objectives need to be linked to marketing decisions in a business that promises next-day delivery. [6]
11. Explain two possible conflicts between operational objectives. [4]
12. Evaluate whether environmental objectives should be as important as cost objectives for a manufacturer. [12]
Answers
1. B [1]. £25 − £9 = £16. [1]
2. C [1]. Cutting waste to landfill reduces harm to the environment; the other options concern speed, quality and product range. [1]
3. The ability of the business to change its output quickly [1], for example the volume produced, the mix of products or the specification of a product [1]. [2]
4. A strict cost objective may lead managers to cut corners [1], for example by buying cheaper materials or reducing staff training [1], which could harm quality, increase returns and complaints, and damage the brand, so that the lost sales outweigh the savings [1]. Credit also: lower staff morale; reduced flexibility. [3]
5. (a) £14 − £5.60 = £8.40 [1]; 8.40 ÷ 14 × 100 = 60% [1].
(b) Added value = £16 − £5.60 = £10.40 [1]; 10.40 ÷ 16 × 100 = 65% [1].
(c) Reduce the cost of bought-in inputs, for example by negotiating cheaper clay or reducing wasted materials [1], which widens the gap between the selling price and the input cost [1]. [6]
6. (a) Current waste = 10% × £150,000 = £15,000 [1]. New waste = 6% × £150,000 = £9,000, so the saving is £6,000 a year [1].
(b) Customers and investors increasingly expect businesses to cut waste, so a good record protects the brand’s reputation [1]. Alternatively, the firm may face laws or taxes on plastic use [1]. [4]
7. A feature of the product or service that makes customers choose it over rivals [1], for example the lowest price for a budget airline or the best quality for a luxury hotel [1]. [2]
8. Benefit 1: customer loyalty and reputation [1]. Consistent food and service lead to satisfied customers who return and recommend the chain [1], which cuts the cost of attracting new customers [1]. Benefit 2: ability to charge higher prices [1]. Customers who see high quality will pay more [1], which raises profit margins and added value per meal [1]. Credit also: fewer complaints and refunds; less waste from errors. [6]
9. For: faster turnaround means aircraft spend less time on the ground and more time earning revenue [1], which can lower the cost per passenger-seat and so support the cost objective [1]. Punctual flights improve customer satisfaction and reduce compensation payments [1]. Against: speed may require more ground staff and equipment, raising costs [1]. Rushed turnarounds may risk safety checks, quality and delays when things go wrong [1]. A low-cost airline’s customers choose it mainly for price, so cost is the order winner and speed is a qualifier [1]. If fares rise because of higher costs, customers may switch [1]. Judgement: Skyline should not put speed above cost but should aim for turnaround speed that reduces cost per seat [1], because the two objectives support each other up to a point beyond which extra spending on speed brings little benefit [1]. [9]
10. Marketing’s promise of next-day delivery becomes an operational speed-of-response objective [1]. Operations needs enough stock and capacity to meet demand across the range [1], and suitable transport and order-processing systems [1]. If operations cannot deliver, customers will be disappointed and the brand’s reputation will be damaged [1]. Marketing needs to know the cost of next-day delivery before setting prices or promotions [1], and the two functions should agree the cut-off times and areas covered [1]. [6]
11. Conflict 1: cost against quality [1]. Using better materials or more thorough inspection improves quality but increases unit costs [1]. Conflict 2: cost against flexibility [1]. Producing small, varied batches to meet different orders is more expensive per unit than long runs of a standard product, so economies of scale are lost [1]. Accept speed against quality, or cost against environmental objectives, with explanation. [4]
12. For: environmental objectives can reduce costs through less waste and energy use, so they support cost objectives [1]. Customers and investors increasingly care about sustainability, so a green image can win sales [1]. Laws and taxes on pollution and waste make non-compliance costly [1]. Failing to act can harm reputation and cause long-term loss [1]. Environmental aims can also motivate staff and help to attract recruits [1]. Against: environmental improvements can need expensive equipment, raising costs in the short run [1]. If the manufacturer competes mainly on price, customers may not pay more for greener products [1]. Cost cuts are easier to measure and may be more urgent for survival [1]. Some firms cannot afford to lead on environmental issues [1]. Factors: the industry’s regulation, the firm’s customers, and its financial position [1]. Judgement: the two should be treated as close in importance in the long run, as many environmental measures reduce costs [1], but a business in financial difficulty may need to prioritise cost in the short term while meeting legal minimums [1]. [12]
Examiner insight: Strong answers say which objective is the order winner for the business in the case and test the argument against that.
Where marks are usually lost
- Confusing added value with profit.
- Writing objectives with no measure.
- Describing the six objectives without choosing those that fit the business.
- Ignoring conflicts between objectives.
- Using “quality” to mean expensive rather than meeting customers’ expectations.
- Forgetting that environmental measures can reduce costs.
Related resources
-
Revision notes
AQA A-Level Business (7132): Setting operational objectives – Revision Notes
Condensed recall for AQA A-level Business 7132 section 3.4.1: operational objectives, added value, trade-offs between objectives, and a self-test.
Business · AQA · A Level
Revise topic -
Study guides
AQA A-Level Business: Operational management (7132)
Study guide to operational management for AQA A-Level Business: objectives, productivity, capacity, lean, quality, inventory and supply chains.
Business · AQA · A Level
Read guide -
Practice questions
AQA A-Level Business: Operational management (7132) – Practice Questions
Original short-answer, calculation and case-study practice for AQA A-Level Business operational management, with worked answers and examiner insights.
Business · AQA · A Level
Try questions
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.