Skip to content
Marlbridge

Practice Questions

Cambridge A Level Information Technology (9626): Modelling and simulations – Practice Questions

Twelve original Cambridge 9626 IT section 9.1 questions with answers on what-if analysis, goal seek, computer models and simulations.

Subject
ICT
Level
AS LEVEL
Topic
Topic 9 – Modelling
Updated

Aligned to Cambridge A Level Information Technology (9626), 2025-2027. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge A Level Information Technology.

Syllabus points this page covers

9626 (AS Level)

  • 9.1 Modelling and simulations

This page covers all 1 subtopics in topic 9, Modelling.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Information Technology (9626).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs; examination boards hold copyright in their own papers. Use these alongside the official past papers available free from your board.

Related: Modelling and simulations study guide

These questions are for section 9.1 Modelling and simulations (Topic 9, AS Level) of Cambridge International AS & A Level Information Technology (9626), 2025–2027. All organisations are invented.


Section A

1. Define the term computer model. [2]

2. Describe what is meant by what-if analysis. [2]

3. State two reasons why a computer model of a nuclear reactor is used instead of experiments on a real reactor. [2]

4. Describe what goal seek does. [2]

5. Give two uses of what-if analysis. [2]

Section B

6. A school uses a spreadsheet model to plan a charity concert. Each ticket costs 5 pounds to produce and is sold for 12 pounds. The fixed cost of the hall is 600 pounds. The profit is calculated as units sold × (price − cost per ticket) − fixed cost.

(a) Calculate the profit when 200 tickets are sold. [2]

(b) Calculate the profit when 150 tickets are sold, and when 250 are sold. [2]

(c) The school wants a profit of 1000 pounds from 200 tickets. Calculate the ticket price needed. [3]

(d) State which feature of spreadsheet software would find this price automatically, and name the cells it uses. [2]

(e) Calculate the smallest number of tickets that must be sold at 12 pounds to avoid a loss. [2]

7. Explain why the fixed cost, ticket price and cost per ticket in the model of Question 6 should be placed in separate labelled cells rather than typed into the profit formula. [3]

8. A supermarket models queues at its tills. On average 120 customers arrive each hour. Each till serves 30 customers an hour.

(a) Calculate the number of tills needed so that the tills can serve all arriving customers. [2]

(b) Describe how what-if analysis could help the manager plan for a busy Saturday. [3]

9. Describe three characteristics of modelling software. [3]

10. A flight school wants to train pilots to cope with engine failure. Explain two advantages of using a flight simulator and one disadvantage. [5]

11. An analyst builds a spreadsheet model to forecast the population of a town. Evaluate how effective a spreadsheet is for this model. [6]

12. The council uses a simulation to plan the response to a flood. Discuss the advantages and disadvantages of using the simulation rather than relying on past experience. [6]


Answers

1. A simplified representation of a real situation or system [1] that uses variables, rules and relationships in a computer to predict or imitate its behaviour [1]. [2]

2. Changing the input values of a model [1] and observing the effect on the results, to answer questions such as “what would happen if…?” [1]. [2]

3. Any two from: it is too dangerous to experiment on a real reactor [1]; real experiments are expensive [1]; accidents would have serious consequences [1]; the model can be run many times with the same conditions [1]. [2]

4. The user selects a target result [1] and one input cell, and the software changes that input until the result is reached (it works backwards) [1]. [2]

5. Any two from: financial forecasting [1]; population growth [1]; climate change [1]; weather systems [1]; queue management [1]; traffic flow [1]; construction [1]. [2]

6. (a) 200 × (12 − 5) − 600 = 200 × 7 − 600 = 1400 − 600 = 800 pounds [2] (one mark for the method, one for the result).

(b) 150 tickets: 150 × 7 − 600 = 450 pounds [1]. 250 tickets: 250 × 7 − 600 = 1150 pounds [1].

(c) 200 × (price − 5) − 600 = 1000, so 200 × (price − 5) = 1600 [1]; price − 5 = 8 [1]; price = 13 pounds [1].

(d) Goal seek [1]. The profit cell is the target (set to 1000) and the price cell is the cell that changes [1].

(e) The profit is zero when units × 7 = 600, so units = 600 / 7 = 85.7 [1]. At least 86 tickets must be sold [1]. [11]

7. If the values are in separate labelled cells, a user can change one value and the profit updates immediately [1], which makes what-if analysis quick [1]. Typing numbers into the formula hides them and risks errors when they change, because the formula must be edited each time [1]. [3]

8. (a) 120 / 30 = 4 tills [2] (one mark for the method).

(b) The manager changes the number of arriving customers to the expected Saturday figure [1] and the number of tills [1], and observes the effect on the waiting time, to decide how many staff are needed [1]. [5]

9. Any three from: allows variables and rules to be set and changed [1]; recalculates automatically when inputs change [1]; stores and processes large amounts of data quickly [1]; shows results as tables, graphs and charts [1]; saves and compares scenarios [1]; tools such as goal seek [1]. [3]

10. Advantage 1: pilots can practise emergencies safely, without risk to people or aircraft [1], which could not be done with a real engine failure [1]. Advantage 2: it is cheaper than using a real aircraft and fuel [1]. Disadvantage: the simulation is not exactly the same as a real flight, so trainees may react differently when in real danger [1], and a simulator is expensive to build [1]. Award the marks for two advantages (one developed) and one disadvantage (developed) to a maximum of five. [5]

11. Effective: familiar and cheap; formulas recalculate when inputs such as birth rate change [1]; charts show the future growth clearly [1]; what-if analysis allows different scenarios to be compared [1]. Limitations: population depends on many things that are hard to predict, such as migration and government policy, so results are estimates [1]; errors in formulas or assumptions are hard to see [1]; a large or complex model may be slow or need specialist software [1]. Conclusion: suitable for a simple forecast for one town if assumptions are clear and the results are treated as estimates [1]. Any six marks. [6]

12. Advantages: different floods can be tested safely, without a real disaster [1]; plans can be improved before an emergency happens [1]; the simulation can be repeated with different weather, river levels or times [1]. Disadvantages: the model cannot include every factor, so it may be wrong [1]; it relies on accurate data about rivers and buildings [1]; building and running it is expensive [1]. Conclusion: it should be used together with experience and expert judgement [1]. Any six marks. [6]

Where marks are usually lost

  • Not showing the working in a profit or break-even calculation.
  • Describing goal seek as “finding the best answer” instead of finding the input for a chosen result.
  • Naming a use of modelling without saying what is modelled.
  • Saying a simulation is exactly the same as the real situation.
  • Missing the conclusion in an evaluate or discuss question.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.