Cambridge A Level Information Technology (ICT): 16.8 Methods of software development (9626) – Revision Notes

Condensed revision notes on section 16.8 of Cambridge A Level IT 9626: waterfall, iterative, incremental, RAD and agile compared, with a self-test.

Subject
ICT
Level
A LEVEL
Topic
System life cycle
Updated

Aligned to Cambridge A Level Information Technology (9626), 2025-2027. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge A Level Information Technology.

Syllabus points this page covers

9626 (A Level)

  • 16.8 Methods of software development

This page covers 1 of the 10 subtopics in topic 16, System life cycle.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Information Technology (9626).

For full explanations and a worked example, read the section 16.8 study guide first. These notes condense section 16.8 Methods of software development of the Cambridge International AS & A Level Information Technology 9626 syllabus for examination in 2025, 2026 and 2027 (version 4). It is A Level only content, examined in Paper 3 (Advanced Theory).

Test yourself with the practice questions. The Cambridge A Level IT hub has every topic and the free diagnostics show where to start.

The idea

All methods use the same stages (analysis, design, build, test, and so on). A method is a way of arranging them in time. The choice depends on how clear the requirements are, how fast the system is needed, how far users can take part and how costly mistakes are.

The five methods

Method Process in one line
Waterfall Stages in a fixed order; each is finished and signed off before the next; little going back
Iterative Build a rough version of the whole system; test and review; repeat to refine it
Incremental Split the system into parts; build, test and deliver each part; add to what exists
RAD Quick prototypes, user workshops, reusable components, fixed short time-boxes
Agile Short sprints with working software each time; small team; backlog; daily meetings; customer involved; change welcome

Advantages and disadvantages

Method Advantages Disadvantages
Waterfall Simple; clear milestones and documents; easy to plan cost and time Changes are hard; users see the product late; early mistakes found late
Iterative Changes can be included; problems found early; feedback on real versions No clear end point; cost hard to predict; needs version control
Incremental Parts delivered early; easy to test small pieces; lower risk Parts must fit together, so overall planning is needed; integration work; whole system takes longer
RAD Fast; users involved; reusable parts save effort Needs skilled staff and tools; users must be available; quality and documentation may suffer; unsuitable for large or critical systems
Agile Quick working software; flexible; feedback each sprint Cost and final features hard to predict; needs constant customer involvement; less documentation

Which method suits which situation?

Situation Method
Requirements clear and fixed; errors very costly (such as medical device control) Waterfall
Requirements unclear and likely to change; customer available Agile or iterative
System can be split into independent modules; some features needed first Incremental
Needed quickly; users free for workshops; not too large or critical RAD

Iterative vs incremental

  • Iterative: repeat and refine the whole system.
  • Incremental: add finished parts.
  • They can be combined: each increment is built iteratively.

Worked example

A council needs a system to report potholes. It wants a basic web form in two months, then the possibility of an app and a map view later, depending on use.

  • Incremental suits it: the form is delivered first as increment 1, the map view and app follow as later increments.
  • Agile also suits: short sprints, feedback from council staff after each sprint.
  • Waterfall is a poor fit: the future features are unknown, so a full design now would be guesswork.

Must-know distinctions

  • Waterfall (one pass, in order) vs iterative (repeat the cycle).
  • Iterative (refine the whole) vs incremental (add parts).
  • RAD (speed, prototypes, workshops) vs agile (sprints, backlog, change).
  • Documentation: heavy in waterfall, light in agile and RAD.

Quick self-test

  1. In which method are stages completed in strict order?
  2. Give one disadvantage of waterfall.
  3. What is a sprint?
  4. Which method delivers a system module by module?
  5. Name two features of RAD.
  6. Why is agile unsuitable if the customer cannot take part?
  7. A project has fixed requirements and strict safety rules. Which method?
  8. Give one advantage of the incremental method.
  9. What does “time-boxed” mean?
  10. State the difference between iterative and incremental development.

Answers

  1. Waterfall.
  2. Any one: hard to change requirements; users see the product late; early errors found late.
  3. A short, fixed period (often one to four weeks) in which the team builds a set of features and delivers working software.
  4. Incremental.
  5. Any two: prototypes; user workshops; reusable components or tools; strict time limits; strong user involvement.
  6. Agile relies on customer feedback every sprint, so without it the team may build the wrong thing.
  7. Waterfall.
  8. Any one: useful parts delivered early; easier to test small pieces; lower risk.
  9. Each stage has a fixed, short deadline that is not extended.
  10. Iterative repeats the cycle to refine the whole system; incremental builds and delivers it part by part.

Exam technique

  • Name the method, describe how it works in the scenario, then give a point for and against.
  • Look for clues: fixed or changing requirements, separate modules, tight deadline, users available, safety-critical use.
  • Use the key terms: sprint, backlog, increment, iteration, prototype, time-box, sign-off.
  • For “evaluate” or “recommend”, compare at least two methods and finish with a clear choice and a reason.

Where marks are usually lost

  • Mixing up iterative and incremental.
  • Giving the same advantage (“it is quick”) for every method.
  • Recommending a method with no link to the scenario.
  • Saying waterfall “has no testing” or agile “has no planning”.
  • Giving only advantages.
  • Describing RAD without mentioning prototypes and user involvement.

Frequently asked questions

When is waterfall the right choice? When the requirements are clear and stable and mistakes would be costly, because its fixed stages and documents give control and traceability.

Why is agile popular? It delivers working software early and often, and lets customers change their minds between sprints.

Can methods be combined? Yes. For example, a system may be built in increments, with each increment developed in short agile sprints.

Official syllabus

Cambridge International AS & A Level Information Technology 9626, syllabus for examination in 2025, 2026 and 2027, version 4, Cambridge University Press & Assessment. Section 16.8: Methods of software development.