Skip to content
Marlbridge

Revision Notes

Cambridge IGCSE Commerce (0715): Outsourcing – Revision Notes

Recall notes for Cambridge IGCSE Commerce 0715 section 2.2: contract manufacturing, contract logistics, reasons for growth, risks and cost comparison method.

Subject
Commerce
Level
IGCSE
Topic
Topic 2 – Commercial Operations
Updated

Aligned to Cambridge IGCSE Commerce (0715), 2028. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge IGCSE Commerce.

Syllabus points this page covers

0715

  • 2.2 Outsourcing

Found an error? Report a correction.

Need help with this topic? Request a free trial class for IGCSE Commerce (0715).

Condensed notes for section 2.2 of Cambridge IGCSE Commerce (0715): the growth of outsourcing through contract manufacturing and logistics. For the worked cost comparisons, use the outsourcing study guide.

The syllabus statement

2.2.1 names one idea, the growth of outsourcing, in two forms: contract manufacturing and logistics. Link it back to 1.2.2: in-house gives control of quality and information; outsourcing gives expertise and cost savings.

Two forms side by side

Contract manufacturing Contract logistics
What is handed over Making the product or its parts Storing, handling and moving the goods
What the business keeps Design, brand, marketing, selling Products, brand, customer relationship
Typical users Electronics, clothing, cosmetics, toy brands Online sellers, retailers, manufacturers shipping goods
Main appeal No factory or machinery needed; specialist skills No warehouse or vehicles needed; pay per order
Main worry Quality and confidentiality Delivery standards and customer experience
Two panels. In contract manufacturing a brand owner who designs, brands and sells sends an agreed design to a specialist factory that makes the goods. In contract logistics the brand owner sends stock to a logistics firm, which stores and packs it in a warehouse, then delivers it by truck to the customer.
Contract manufacturing and contract logistics are the two outsourcing areas the syllabus names.

Process of contract manufacturing

Specification, then quotation and contract, then sample approval, then production and inspection, then delivery.

Five numbered stages: specification, quotation and contract, sample approval, production and inspection, and delivery. Stages 3 and 4 are marked as the points where quality is checked.
The brand owner controls quality through the specification, the sample and inspection before shipping.

Services in contract logistics

Receiving, storage, picking and packing, transport and delivery, returns handling, stock records shared online.

Several client firms send stock into one logistics firm, which receives, stores, picks and packs, and delivers goods to customers. Returns come back to be checked and restocked, and stock records are shared with clients online.
Sharing one warehouse and network across many clients lowers each client’s cost per order.

Seven reasons for growth (cause, then effect)

  1. Globalisation of production: many manufacturers compete for contracts, so prices fall and choice rises.
  2. Better transport: container ships and air freight make distant production practical.
  3. Digital communication: designs, orders and reports are shared instantly, so contractors can be managed remotely.
  4. Ecommerce growth: online sellers need fast picking, packing and delivery that specialists already provide.
  5. Specialisation: firms focus on core activities like design and marketing.
  6. Cost pressure: no capital tied up in factories, warehouses or vans.
  7. Flexibility: extra capacity can be bought for peak seasons only.
Seven causes each linked to an effect: globalisation of production, better transport, digital communication, growth of ecommerce, specialisation, pressure on costs and flexibility, with what each lets a business do.
Explain each cause and the effect it has on the business.

Risks and controls

Risk Control
Poor quality Specification, sample approval, inspection
Late delivery Contract dates, penalties, safety stock
Copying of designs Confidentiality clauses
Reliance on one firm Use more than one contractor
Ethical scandal at contractor Factory audits, careful choice of contractor
Six risks, each paired with a way to reduce it: falling quality, late delivery, copied designs, dependence on one contractor, reputation damage at the contractor and less contact with customers.
Every outsourcing risk has a matching safeguard the business can put in the contract or process.

Cost comparison method

  1. List every in-house cost: equipment or rent, labour, materials, utilities.
  2. List every outsourcing cost: contract price, plus transport, inspection and any fees.
  3. Total each column.
  4. Divide by units or orders for cost per unit.
  5. State the saving, then weigh non-cost factors before recommending.

Pattern to remember: contract logistics charged per order suits low or uneven volumes; an in-house warehouse with fixed monthly costs becomes cheaper per order as volume rises.

Mini check (invented figures): own warehouse $9,000 a month; contract logistics $4.50 per order. Equal cost at 9,000 / 4.50 = 2,000 orders a month. Below 2,000, outsource; above 2,000, in-house is cheaper on cost alone.

Two cost columns for 5,000 phone covers. In-house: lease 6,000, labour 9,000, materials 6,000 and utilities 1,000 give $22,000, or $4.40 a cover. Outsourced: contract 17,500, transport 1,500 and inspection 800 give $19,800, or $3.96 a cover.
Outsourcing saves $2,200 a year once transport and inspection are included (invented figures).
A graph of monthly cost against orders. The own warehouse is a flat $12,500; contract logistics rises at $5.40 per order, costing $5,400 at 1,000 orders and $16,200 at 3,000. The lines cross at about 2,315 orders.
Below about 2,315 orders a month contract logistics is cheaper; above it the own warehouse costs less (invented figures).

Key terms

Term Meaning
Outsourcing Paying another business to carry out an activity the business could do itself
Contract manufacturing Another firm makes products to the business’s specification
Contract logistics Another firm stores, handles and delivers the business’s goods
Third-party logistics provider A specialist firm offering contract logistics to other businesses
Specification Detailed description of the design, materials and quality required
Core activity What the business does best and depends on, such as design or branding
Confidentiality clause Part of a contract forbidding the contractor to share information
Safety stock Extra stock held in case a delivery is late

Exam traps

  • Outsourcing is not the same as moving abroad; the contractor may be local.
  • “Cheaper” is not an explanation. Say why: economies of scale, lower wages, shared warehouses.
  • In calculations, include the hidden outsourcing costs: transport, inspection, fees.
  • Do not mix up the two forms: making the goods versus storing and moving them.
  • Evaluation needs a recommendation tied to the business’s volume, quality needs and secrets.

Self-test

  1. State the two forms of outsourcing named in 2.2.
  2. Define contract manufacturing.
  3. Define contract logistics.
  4. Give two activities a contract logistics firm can carry out.
  5. Explain how the growth of ecommerce has increased the use of contract logistics.
  6. Explain how digital communication has helped the growth of contract manufacturing.
  7. Give one risk of contract manufacturing and one way to reduce it.
  8. Why might a business with seasonal demand prefer contract logistics?
  9. Name two costs a business must add to a contract manufacturer’s price when comparing options.
  10. A firm’s own warehouse costs $7,200 a month. A logistics firm charges $4 per order. At how many orders a month are the costs equal?
  11. Which benefit of in-house production from 1.2.2 is most at risk when a secret recipe is outsourced?
  12. Give one reason a business with very high, steady order volumes might keep logistics in-house.

Answers

  1. Contract manufacturing and contract logistics.
  2. Paying another firm to make products or components to the business’s own design and specification.
  3. Paying a specialist firm to store, handle, transport and deliver the business’s goods.
  4. Any two: receiving stock, storage, picking and packing, delivery, handling returns, stock records.
  5. Online sellers must pick, pack and deliver many small orders quickly; specialists already have the warehouses and delivery networks, so it is cheaper than building their own.
  6. Designs, orders and quality reports can be sent instantly and video calls used, so a business can manage a manufacturer in another place.
  7. Risk: poor quality, late delivery, copied designs or an ethical scandal. Control: specification and inspection, delivery penalties, confidentiality clauses or audits.
  8. It pays only for the orders sent, so it does not own warehouse space that stands empty out of season.
  9. Any two: transport, inspection, fees, insurance.
  10. 7,200 / 4 = 1,800 orders.
  11. Control of information.
  12. Fixed warehouse costs are spread over many orders, giving a lower cost per order than the logistics firm’s charge; it also keeps control of delivery standards.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.