Skip to content
Marlbridge

Practice Questions

Cambridge IGCSE Environmental Management (0680): Flooding – Practice Questions

Twelve original questions with mark-scheme answers on the causes, impacts, management and opportunities of flooding for Cambridge IGCSE 0680 sub-topic 6.3.

Level
IGCSE
Topic
Topic 6: Natural hazards
Updated

Aligned to Cambridge IGCSE Environmental Management (0680), 2027-2029. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge IGCSE Environmental Management.

Syllabus points this page covers

0680

  • 6.3 Flooding

Found an error? Report a correction.

Need help with this topic? Request a free trial class for IGCSE Environmental Management (0680).

These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs — Cambridge International holds copyright in its own papers. Use these alongside the past papers available free from your board.

Related: Flooding study guide | Flooding revision notes

These questions cover sub-topic 6.3 of Cambridge IGCSE Environmental Management (0680, 2027-2029): causes and impacts of flooding, strategies before, during and after a flood, and the opportunities floods provide. Places and figures in the sources are invented.


Section A

1. State what is meant by saturated soil. [1]

2. Name two causes of coastal flooding. [2]

3. State two opportunities that flooding provides to people. [2]

4. Describe what is meant by land use zoning in flood management. [2]

5. Name two pieces of information used to monitor the risk of a river flood. [2]

Section B

6. Explain how land relief can increase the risk of flooding. [3]

7. Source: The invented town of Brenholt has grown from 8,000 to 35,000 people in 25 years. Woodland on the hills above the town has been cleared for housing and roads, and a new shopping centre with a large car park was built on the floodplain.
(a) Using the source, explain two reasons why the risk of flooding in Brenholt has increased. [4]
(b) Suggest one reason why the town council may find land use zoning difficult to introduce now. [1]

8. A storm drops 25 mm of rain on a catchment of 4 km². Calculate the volume of rain in cubic metres. If 70% becomes surface run-off, calculate the volume of run-off. Show your working. [3]

9. Explain how flooding can lead to an outbreak of water-related disease. [3]

10. Explain why farmers in many river valleys benefit from regular floods. [3]

11. Discuss the benefits and limitations of changing the structure of buildings to reduce the impacts of flooding. [4]

12. “Strategies before a flood are more effective than strategies after it.” Discuss this statement. [6]


Answers

1. Soil whose pore spaces are full of water, so no more water can soak in [1].

2. Any two: storm surges [1]; tsunamis [1]; rise in sea level due to climate change [1]. [max 2]

3. Deposition of nutrient-rich silt on farmland [1]; recharge of surface water and ground water stores [1].

4. Controlling which land uses are allowed in different areas [1], so that homes, schools and hospitals are kept off land at high risk of flooding, which is used instead for parks, playing fields or farming [1].

5. Any two: river level readings from gauges [1]; rainfall amounts or rainfall radar [1]; weather forecasts of storms [1]; soil moisture. [max 2]

6. Steep slopes cause rainfall to flow downhill quickly [1], so water reaches the river in a short time and its level rises rapidly [1]; low-lying, flat land at the bottom of valleys or near the coast is where water collects and drains away slowly, so it floods [1].

7. (a) Any two explained, 2 marks each: clearing woodland on the hills [1] removes interception and water uptake by trees, so more rain runs off quickly towards the town [1]; new housing, roads and the car park are impermeable surfaces [1], so less water infiltrates and drains carry it rapidly to the river [1]; building the shopping centre on the floodplain [1] puts property where water naturally spreads and reduces space for floodwater [1]; cleared hillsides may erode, silting the river and reducing channel capacity. [max 4]
(b) Any one: buildings such as the shopping centre already stand on the floodplain and cannot easily be moved; the growing population needs land for housing; businesses and landowners may oppose restrictions. [1]

8. 25 mm = 0.025 m and 4 km² = 4,000,000 m² [1]; volume of rain = 0.025 × 4,000,000 = 100,000 m³ [1]; run-off = 100,000 × 0.70 = 70,000 m³ [1].

9. Floodwater mixes with sewage from overflowing drains and toilets [1] and enters wells and drinking-water supplies [1]; people drink the contaminated water and catch diseases such as cholera, and standing water left behind allows mosquitoes to breed [1].

10. As the river spreads over its floodplain the water slows down [1] and deposits the fine, nutrient-rich silt it was carrying [1], which renews soil fertility and raises crop yields; floods also recharge ground water and surface stores used for irrigation in the dry season [1].

11. Benefits: raised floors, stilts, waterproof walls and high electrical sockets keep water out of living space or reduce damage [1], so families can return and recover quickly after the water drains [1]. Limitations: adapting existing homes is expensive, especially for low-income households [1]; it protects individual buildings but not roads, crops or water supplies, so other strategies are still needed [1]. [4]

12. Award up to 6 for a balanced discussion with a judgement. For: monitoring and warning give time to evacuate and move belongings [1]; land use zoning keeps people off the floodplain, preventing damage altogether [1]; flood-resistant buildings and preparation reduce losses every time a flood occurs [1]. Against: flash floods may give too little warning for before-flood strategies to work [1]; after-flood strategies such as shelters, rebuilding and international aid are still essential for people who lose homes, food and clean water [1]; rebuilding can include flood-resistant designs, so after-flood action also reduces future risk [1]. Judgement: before-flood strategies prevent more loss, but both are needed [1]. [max 6]


Where marks are usually lost

  • Explaining causes as “more rain” rather than linking to infiltration, run-off or channel capacity.
  • Not using the source details, such as the cleared hills or the car park on the floodplain.
  • Forgetting to convert millimetres to metres or square kilometres to square metres.
  • Describing land use zoning as building flood walls.
  • One-sided answers to “discuss” statements.

Frequently asked questions

Are these Flooding questions from Cambridge past papers? No. They are original questions written for Marlbridge and do not copy past papers or their mark tariffs. Use them alongside the past papers for Cambridge IGCSE Environmental Management (0680).

Do I need to know hard and soft engineering for 6.3? The 6.3.3 list names eight strategies, from monitoring and warning to international aid. Focus on those, with a benefit and a limitation for each.

How do I convert rainfall into a volume? Change the rainfall into metres and the area into square metres, then multiply. One millimetre is 0.001 m, and one square kilometre is 1,000,000 m².

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.