Cambridge IGCSE ICT (0417): Implementation – Revision Notes

Revision notes for Cambridge IGCSE ICT 0417 7.4: direct changeover, parallel running, pilot running and phased implementation, how to choose, and a self-test.

Subject
ICT
Level
IGCSE
Topic
Topic 7: The systems life cycle
Updated

Aligned to Cambridge IGCSE ICT (0417), 2026-2028. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge IGCSE ICT.

Syllabus points this page covers

0417

  • 7.4 Implementation

Found an error? Report a correction.

Need help with this topic? Request a free trial class for IGCSE ICT (0417).

Section 7.4 of Cambridge IGCSE ICT 0417 covers the four methods of changing from an old system to a new one. You need the characteristics, uses, advantages and disadvantages of each. These notes are for recall; the implementation study guide works through choosing a method for a scenario, and the implementation practice questions test it.

Syllabus coverage

Syllabus wording Recall
System implementation: four methods Direct changeover, parallel running, pilot running, phased implementation
For each Characteristics, uses, advantages, disadvantages

The four methods on one page

Method What happens Use when Main advantage Main disadvantage
Direct changeover Old system stops; new one starts the same day Small organisation; low risk; old system cannot continue Cheapest and quickest; benefits at once No fall-back if the new system fails
Parallel running Both systems run together; outputs compared Failure would be serious (money, health, legal) Old system is a fall-back; errors found by comparison Most expensive: work done twice
Pilot running Whole new system in one branch first, then the rest Several similar branches or departments Failure affects only one site Other sites wait; pilot site may not be typical
Phased implementation One part of the system at a time, across the organisation System splits into clear modules Failure affects only one part Slow; old and new parts must share data

Extra points for each method

Direct changeover

  • All staff must be trained before the changeover date.
  • Data must be fully transferred before the switch.
  • Highest risk of the four methods.

Parallel running

  • Staff workload doubles; overtime or temporary staff may be needed.
  • Staff can learn the new system while the old one still works.
  • The old system is stopped only when the new one has proved reliable.

Pilot running

  • Staff at the pilot site become experienced and can train others.
  • Faults found at the pilot site are fixed before roll-out.
  • Cheaper than parallel running everywhere.

Phased implementation

  • Each part is checked before the next is introduced.
  • Problems are easy to trace to the part just introduced.
  • Only possible if the system can be divided into parts.

Pilot versus phased

Pilot Phased
How much of the system first? All of it One part
Where first? One site Everywhere
Example Full new library system in one branch library Book loans module in all branches, then reservations module

Choosing a method: quick guide

  • Lives, money or legal records at risk → parallel running (or a pilot with parallel running at the pilot site).
  • Small, single site, low risk, low budget → direct changeover.
  • Many similar branches → pilot running.
  • Clear modules → phased implementation.

Always justify with a fact from the scenario and, for top marks, say why another method is less suitable.

Ranking the methods

Factor Lowest Highest
Cost Direct Parallel
Risk of losing data or service Parallel Direct
Time to complete Direct Phased (and pilot across many sites)

Key terms

Term Meaning
Implementation Changing over from the old system to the new one
Direct changeover Replacing the old system with the new one immediately
Parallel running Running old and new systems together for a time
Pilot running Introducing the whole system at one site first
Phased implementation Introducing the system one part at a time
Fall-back A working system that can be used if the new one fails
Roll-out Introducing the system to the remaining sites after a pilot

Exam traps

  • Pilot = whole system, one place. Phased = one part, everywhere. Swapping these is the most common error.
  • “Safer” needs a reason: the old system is still available.
  • “Cheaper” needs a reason: work is not duplicated.
  • Do not recommend parallel running automatically. Weigh its cost against the risk in the scenario.
  • A one-site organisation cannot pilot in the usual sense: there is no other site to roll out to.
  • Implementation is not testing. Testing comes first, in development and testing.

Self-test

  1. Name the four methods of implementation.
  2. Which method has no fall-back if the new system fails?
  3. Give one disadvantage of parallel running.
  4. Describe pilot running.
  5. Describe phased implementation.
  6. Which method is the cheapest? Give a reason.
  7. Why is parallel running suitable for a payroll system?
  8. A chain of 12 cinemas is installing a new booking system. Which method would you suggest and why?
  9. A school’s new system has separate modules for attendance, reports and fees. Which method suits it?
  10. Give one advantage of phased implementation.
  11. Why might a pilot site not show every problem?
  12. Give two things that must be in place before a direct changeover.

Self-test answers

  1. Direct changeover, parallel running, pilot running, phased implementation.
  2. Direct changeover.
  3. Any one of: expensive; work done twice; heavy staff workload; benefits delayed.
  4. The whole new system is introduced at one site or department first, then at the others.
  5. The new system is introduced one part at a time across the organisation.
  6. Direct changeover, because work is not duplicated and it is completed at once.
  7. Payroll errors would affect staff pay, so the old system is kept as a fall-back and outputs can be compared.
  8. Pilot running, because the cinemas are similar, so one can test the system and limit failure to one site.
  9. Phased implementation, one module at a time.
  10. Any one of: failure affects only one part; staff learn gradually; each part checked before the next.
  11. It may not be typical: it might be smaller, quieter or have more experienced staff than other sites.
  12. Trained staff and fully transferred data.

Syllabus reference

Cambridge International, Cambridge IGCSE Information and Communication Technology (0417) syllabus for 2026, 2027 and 2028, Topic 7 “The systems life cycle”, section 7.4 “Implementation”.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.