Study Guides
Cambridge O Level Accounting (7707): Manufacturing accounts
Study guide to O Level Accounting 7707 section 5.4: direct and indirect costs, prime cost, factory overheads, work in progress and factory cost of production.
- Subject
- Accounting
- Level
- O LEVELS
- Topic
- Preparation of financial statements
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Javaid Iqbal Sabri (what this means)
Aligned to Cambridge O Level Accounting (7707), 2027-2029. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge O Level Accounting.
Syllabus points this page covers
7707
- 5.4 Manufacturing accounts
Found an error? Report a correction.
Want a teacher for this? Marlbridge teaches Accounting online. Request a free trial class.
This guide goes deeper into section 5.4 Manufacturing accounts of the Cambridge O Level Accounting 7707 syllabus for examination in 2027, 2028 and 2029. The syllabus lists “direct and indirect costs”, “direct material, direct labour, prime cost and factory overheads”, “how to make adjustments for work in progress”, “how to calculate factory cost of production”, how to prepare “manufacturing accounts, statements of profit or loss and statements of financial position”, and the adjustments detailed in 5.1.
The shared manufacturing accounts study guide explains each section of the account. This page adds a fuller worked example with costs that must be split between factory and office, an accrual inside the manufacturing account, and a check on how work in progress moves the figures. Recall the essentials with the manufacturing accounts revision notes and test yourself with the manufacturing accounts practice questions. All businesses and figures are invented, and amounts are in dollars.
Why a manufacturer needs an extra account
A trader buys finished goods and sells them. A manufacturer buys raw materials, pays people to turn them into products and runs a factory. Its cost of sales cannot simply use “purchases”, because most of the cost of each product is created inside the business. The manufacturing account collects every factory cost for the year and produces one figure, the factory cost of production. That figure takes the place of purchases in the statement of profit or loss.
Direct and indirect costs
A direct cost can be traced to each unit made. An indirect cost is incurred for the factory as a whole and cannot be traced to a single unit.
| Cost | Direct or indirect | Section of the manufacturing account |
|---|---|---|
| Timber used in each cabinet | Direct | Direct material |
| Carriage inwards on raw materials | Direct | Added to cost of raw materials |
| Wages of machine operators paid per cabinet made | Direct | Direct labour |
| Wages of the factory supervisor | Indirect | Factory overheads |
| Factory electricity | Indirect | Factory overheads |
| Depreciation of factory machinery | Indirect | Factory overheads |
| Office salaries | Not a factory cost | Statement of profit or loss |
| Carriage outwards on goods sold | Not a factory cost | Statement of profit or loss |
The test for the last two rows is location and purpose: a cost belongs in the manufacturing account only if it is incurred in making goods. Selling and administration costs stay in the statement of profit or loss.
The four building blocks
- Cost of raw materials consumed = opening inventory of raw materials + purchases of raw materials + carriage inwards - closing inventory of raw materials.
- Prime cost = direct material + direct labour.
- Factory overheads: all indirect factory costs, added to prime cost.
- Work in progress adjustment: add opening work in progress, deduct closing work in progress. The result is the factory cost of production.
Work in progress is partly made goods. Goods unfinished at the start were finished this year, so their cost is added. Goods unfinished at the end will be finished next year, so their cost is carried forward.
Worked example: Kestrel Joinery
Kestrel Joinery makes kitchen cabinets. Its year ends on 31 December 2028.
| Item | $ |
|---|---|
| Inventory at 1 January 2028: raw materials | 14,200 |
| Inventory at 1 January 2028: work in progress | 9,600 |
| Inventory at 1 January 2028: finished goods | 21,000 |
| Purchases of raw materials | 96,500 |
| Carriage inwards on raw materials | 2,300 |
| Direct wages paid | 118,000 |
| Indirect factory wages | 34,500 |
| Factory power | 18,400 |
| Rent of premises | 30,000 |
| Insurance of premises | 6,000 |
| Office salaries | 46,000 |
| Selling expenses | 12,300 |
| Revenue | 455,000 |
Additional information at 31 December 2028:
- Closing inventories: raw materials $16,800; work in progress $8,100; finished goods $24,500.
- Direct wages of $2,000 are owing.
- Rent is shared three-quarters factory, one-quarter office. Insurance is shared two-thirds factory, one-third office.
- Factory machinery cost $120,000 and is depreciated at 10% a year on cost. Office equipment depreciation is $3,000.
Workings. Direct labour = 118,000 + 2,000 = $120,000. Factory rent = 30,000 x 3/4 = $22,500; office rent $7,500. Factory insurance = 6,000 x 2/3 = $4,000; office insurance $2,000. Machinery depreciation = 10% x 120,000 = $12,000.
Kestrel Joinery
Manufacturing account for the year ended 31 December 2028
USD USD
Cost of raw materials
Inventory of raw materials 1 January 2028 14,200
Purchases of raw materials 96,500
Carriage inwards 2,300
113,000
Less Inventory of raw materials 31 Dec 16,800
Cost of raw materials consumed 96,200
Direct labour 120,000
Prime cost 216,200
Factory overheads
Indirect factory wages 34,500
Factory power 18,400
Rent (factory share) 22,500
Insurance (factory share) 4,000
Depreciation of factory machinery 12,000
91,400
307,600
Add Work in progress 1 January 2028 9,600
317,200
Less Work in progress 31 December 2028 8,100
Factory cost of production 309,100
Kestrel Joinery
Statement of profit or loss for the year ended 31 December 2028 (extract)
USD USD
Revenue 455,000
Cost of sales
Inventory of finished goods 1 January 2028 21,000
Factory cost of production 309,100
330,100
Less Inventory of finished goods 31 Dec 24,500
305,600
Gross profit 149,400
Less Expenses
Office salaries 46,000
Rent (office share) 7,500
Insurance (office share) 2,000
Selling expenses 12,300
Depreciation of office equipment 3,000
70,800
Profit for the year 78,600
In the statement of financial position, all three inventories appear under current assets: raw materials $16,800, work in progress $8,100 and finished goods $24,500, a total of $49,400. The $2,000 of direct wages owing is an other payable.
How work in progress moves the figures
Suppose Kestrel’s closing work in progress had been valued at $10,100 instead of $8,100. The factory cost of production would fall by $2,000 to $307,100. Cost of sales would fall by $2,000, and gross profit and profit for the year would each rise by $2,000. Current assets would rise by the same $2,000. This is the same logic as an error in closing inventory: an overstated closing figure overstates profit.
Adjustments from 5.1 in a manufacturing business
The 5.1 adjustments work as usual, with one extra decision: which account receives the charge.
- An accrued or prepaid factory cost adjusts the manufacturing account; an office one adjusts the statement of profit or loss.
- Depreciation of factory machinery and buildings is a factory overhead; depreciation of office equipment and delivery vehicles is an expense in the statement of profit or loss.
- Irrecoverable debts and the allowance for irrecoverable debts relate to selling, so they are never in the manufacturing account.
- A shared cost is split only in the proportion the question gives.
Common mistakes
- Putting carriage inwards in factory overheads, or carriage outwards in the manufacturing account.
- Adding closing work in progress instead of deducting it.
- Using finished goods inventory in the manufacturing account; it belongs in cost of sales.
- Missing the second half of a split cost, so the office share never reaches the statement of profit or loss.
- Leaving out a subtotal label such as “Prime cost”, which the question may reward separately.
Exam technique
Paper 2 questions on manufacturing may ask you to prepare the manufacturing account alone, or to complete a partly drawn statement. Label every subtotal: cost of raw materials consumed, prime cost, total factory overheads and factory cost of production. A calculate question such as “calculate prime cost” needs only the direct material and direct labour lines, but show each one. For explain questions, link the cost to its purpose: “the supervisor’s wages are indirect because they cannot be traced to any single cabinet, so they are a factory overhead”. In Paper 1, a common distractor puts a selling cost into factory overheads, so classify each cost before adding.
The syllabus asks for factory cost of production; it does not list a manufacturing profit, so goods move to cost of sales at cost. For the wider topic, see the preparation of financial statements study guide and the O Level Accounting 7707 subject guide.
Related resources
-
Revision notes
IGCSE Accounting: Analysis and Interpretation — Revision Notes
Quick recall for Cambridge IGCSE Accounting 0452 Topic 6: ten ratios, reading them, profit versus cash, comparing businesses, users and statement limits.
Accounting · Cambridge · IGCSE, O Level
Revise topic -
Practice questions
Cambridge O Level Accounting (7707): Manufacturing accounts – Practice Questions
Original O Level Accounting 7707 practice on manufacturing accounts: classifying costs, prime cost, work in progress, factory cost of production and errors.
Accounting · Cambridge · O Level
Try questions -
Revision notes
Cambridge O Level Accounting (7707): Manufacturing accounts – Revision Notes
Revision notes for O Level Accounting 7707 section 5.4: cost classification, the manufacturing account layout, work in progress, exam traps and a self-test.
Accounting · Cambridge · O Level
Revise topic
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.