Practice Questions
Edexcel International A Level Accounting (YAC11): Labour costs – Practice Questions
Ten original labour cost questions for Edexcel IAL Accounting (YAC11) 1.4.4-1.4.6: productivity, day work, piecework, bonus schemes, earnings and employer cost, with full answers.
- Subject
- Accounting
- Level
- AS LEVEL
- Topic
- Introduction to costing
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Javaid Iqbal Sabri (what this means)
Aligned to Pearson Edexcel A Level Accounting (YAC11), 2015-onwards. Official specification .
Syllabus page (what it covers and how it is assessed): Pearson Edexcel A Level Accounting.
Syllabus points this page covers
YAC11 (AS Level)
- 1.4.4-1.4.6 Labour costs
This page covers 1 of the 4 subtopics in topic 1.4, Introduction to costing.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Accounting (YAC11).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs, because examination boards hold copyright in their own papers. Use these alongside the official past papers available free from your board.
These questions cover outcomes 1.4.4 to 1.4.6 (labour productivity, methods of remuneration, employee earnings and employer cost) in Unit 1 of Pearson Edexcel International A Level Accounting (YAC11). All amounts are in dollars and all businesses are invented. Tax and pension rates are invented for practice.
Related: Labour costs study guide | Introduction to costing revision notes
Section A
1. Define labour productivity. [2]
2. A factory made 7,200 units in 900 labour hours. Labour is paid 12 an hour. Calculate the output per labour hour and the labour cost per unit. [3]
3. An employee works 38 hours at a basic rate of 15 an hour and 7 hours of overtime at time and a half. Calculate gross pay. [3]
4. A piece rate of 0.75 per unit is paid, with a guaranteed minimum of 300 a week. Calculate the pay for a week in which the employee makes (a) 380 units and (b) 460 units. [3]
5. State two disadvantages of piecework for an employer. [2]
Section B
6. An employee at Kestrel Fabrics worked 38 hours at 16 an hour and 6 hours of overtime at 24 an hour. Income tax is deducted at 20% of gross pay and the employee’s pension contribution is 5% of gross pay. The employer pays social security of 10% of gross pay and a pension contribution of 5% of gross pay.
(a) Calculate the employee’s gross pay and net pay. [4]
(b) Calculate the total cost of the employee to Kestrel Fabrics. [2]
7. In a bonus scheme, the allowed time is 0.25 hours per unit. A worker making 240 units took 50 hours at 16 an hour. The bonus is 50% of the value of the time saved at the hourly rate. Calculate the time saved, the bonus and the worker’s total earnings. [4]
8. A group of six workers has a target of 4,000 units a week. The group made 4,900 units. A group bonus of 0.15 is paid for each unit above target and is shared equally. Calculate the bonus for each worker. [3]
9. Hale Plastics pays a worker 10 an hour for a 40-hour week under day work. An alternative is piecework at 0.80 per unit with a guaranteed minimum of 400 a week.
(a) Calculate the labour cost per unit under each method when output is 450 units and when output is 600 units. [4]
(b) Recommend which method Hale Plastics should use, giving two reasons. [4]
10. Evaluate the use of a group bonus scheme compared with an individual bonus scheme. [6]
Answers
1. The amount of output produced [1] for each unit of labour input, usually per labour hour or per employee [1].
2. Output per hour 7,200 ÷ 900 = 8 units [1]; labour cost 900 × 12 = 10,800 [1]; cost per unit 10,800 ÷ 7,200 = 1.50 [1].
3. Basic pay 38 × 15 = 570 [1]; overtime rate 15 × 1.5 = 22.50, so 7 × 22.50 = 157.50 [1]; gross pay 570 + 157.50 = 727.50 [1].
4. (a) 380 × 0.75 = 285, which is below the guarantee, so pay is 300 [2]
(b) 460 × 0.75 = 345 [1]
5. Any two: quality may fall as workers rush [1]; the employer may need extra inspection [1]; pay is uncertain for workers, which may reduce morale [1]; a guaranteed minimum means the employer pays even when output is low [1]; workers may resist new methods that change the piece rate [1].
6. (a) Basic pay 38 × 16 = 608 [1]; overtime 6 × 24 = 144 [1]; gross pay 752, tax 150.40 and pension 37.60 give net pay 752 − 150.40 − 37.60 = 564.00 [2].
(b) Employer’s social security 75.20 and pension 37.60 [1]; total cost 752 + 75.20 + 37.60 = 864.80 [1].
7. Allowed time 240 × 0.25 = 60 hours [1]; time saved 60 − 50 = 10 hours [1]; bonus 10 × 16 × 50% = 80 [1]; total earnings 50 × 16 + 80 = 800 + 80 = 880 [1].
8. Units above target 4,900 − 4,000 = 900 [1]; bonus pool 900 × 0.15 = 135 [1]; each worker 135 ÷ 6 = 22.50 [1].
9. (a)
| Output | Day work | Piecework |
|---|---|---|
| 450 units | 400 ÷ 450 = 0.89 | 450 × 0.80 = 360, so the guarantee of 400 applies: 400 ÷ 450 = 0.89 |
| 600 units | 400 ÷ 600 = 0.67 | 600 × 0.80 = 480; 480 ÷ 600 = 0.80 |
Day work cost 400 at both outputs [1]; piecework cost 400 at 450 units [1]; piecework cost 480 at 600 units [1]; cost per unit values [1].
(b) Reasons for day work: labour cost per unit falls as output rises, giving 0.67 at 600 units compared with 0.80 under piecework [1]; the employer does not pay more when output is high [1]. Reasons for piecework: it rewards effort and may motivate workers to produce more [1]; the cost per unit is fixed at 0.80 once output passes 500 units [1]. Any recommendation with two supported reasons earns 4 marks; a recommendation without a reason earns none.
10. For a group scheme: it encourages co-operation and helps where individual output cannot be measured [1]; it avoids disputes over who contributed to a team job [1]. Against: a hard-working worker may gain little if others do not work [1]; individual schemes link reward to effort more directly [1]; group schemes may encourage group pressure on weaker workers [1]. Judgement: the choice depends on the work; a group scheme suits work done by a team, while an individual scheme suits separate tasks where time can be measured [1].
Where marks are usually lost
- Paying overtime at the basic rate (Question 3).
- Ignoring the guaranteed minimum (Questions 4 and 9).
- Giving the whole value of the time saved to the worker instead of 50% (Question 7).
- Treating the employee’s tax as an extra cost to the employer (Question 6).
- Dividing a group bonus by the wrong number of workers.
- Writing a recommendation with no supporting figures.
Approaching these questions
Build pay in stages: basic, overtime, bonus, gross, deductions, net. For employer cost, start from gross pay and add only the employer’s own contributions. For comparisons, calculate the cost per unit at each output and then make a decision using the numbers.
Frequently asked questions
Are these Edexcel YAC11 questions from past papers? No. They are original questions on outcomes 1.4.4 to 1.4.6, written for revision. Use them alongside the official past papers.
Which tax and pension rates should I use in the exam? Use the rates in the question. The rates in these questions are invented.
Related resources
-
Study guides
Edexcel International A Level Accounting (YAC11): Overhead costs
Study guide to overhead costs for Edexcel IAL Accounting (YAC11): cost behaviour, apportionment, service departments, absorption rates and under or over absorption.
Accounting · Pearson Edexcel · AS Level
Read guide -
Practice questions
Edexcel International A Level Accounting (YAC11): Overhead costs – Practice Questions
Ten original overhead cost questions for Edexcel IAL Accounting (YAC11) 1.4.7-1.4.11: behaviour, apportionment, service departments, absorption rates and over or under absorption, with answers.
Accounting · Pearson Edexcel · AS Level
Try questions -
Study guides
Edexcel International A Level Accounting (YAC11): Valuation of inventory
Study guide to inventory valuation for Edexcel IAL Accounting (YAC11): FIFO, LIFO and NRV, perpetual and periodic methods, and the effect on profit and the statement of financial position.
Accounting · Pearson Edexcel · AS Level
Read guide
Get free revision emails (optional)
Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.