Skip to content
Marlbridge

Study Guides

Edexcel International A Level Accounting (YAC11): Labour costs

Study guide to labour costs for Edexcel IAL Accounting (YAC11): labour productivity, day work, piecework, bonus schemes, employee earnings and employer cost.

Subject
Accounting
Level
AS LEVEL
Topic
Introduction to costing
Updated

Aligned to Pearson Edexcel A Level Accounting (YAC11), 2015-onwards. Official specification .

Syllabus page (what it covers and how it is assessed): Pearson Edexcel A Level Accounting.

Syllabus points this page covers

YAC11 (AS Level)

  • 1.4.4-1.4.6 Labour costs

This page covers 1 of the 4 subtopics in topic 1.4, Introduction to costing.

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Accounting (YAC11).

This guide covers outcomes 1.4.4 Labour productivity, 1.4.5 Methods of remuneration, day work, piecework, individual and group bonus schemes and 1.4.6 Employer cost and employee earnings under different remuneration methods. They sit in Topic 1.4, Introduction to costing, in Unit 1 (The Accounting System and Costing) of the Pearson Edexcel International Advanced Subsidiary/Advanced Level in Accounting (YAC11), Specification Issue 2, September 2018. This is International AS content. All amounts are in dollars and every business named is invented. The tax and pension rates are invented for practice; in an exam, use the rates given in the question.

Use it with the introduction to costing revision notes and the labour costs practice questions. Labour cost becomes part of job cost in the job costing guide.

What the specification asks for

Outcome Wording What you must be able to do
1.4.4 Labour productivity Calculate and interpret output per hour and labour cost per unit
1.4.5 Day work, piecework, individual and group bonus schemes Calculate pay under each method and describe their advantages and disadvantages
1.4.6 Employer cost and employee earnings Calculate gross pay, deductions, net pay and the full cost to the employer

1.4.4 Labour productivity

Labour productivity measures how much output labour produces. The usual measure is output per labour hour.

Productivity = units produced ÷ labour hours worked

Labour cost per unit = total labour cost ÷ units produced

Example. In week 1 a workshop made 4,800 units in 600 labour hours. In week 2 it made 5,400 units in 640 hours. Labour costs 12 an hour.

Week 1 Week 2
Units 4,800 5,400
Hours 600 640
Units per hour 8.00 8.44
Labour cost (hours × 12) 7,200 7,680
Labour cost per unit 1.50 1.42

Productivity rose by (8.4375 − 8) ÷ 8 × 100 = 5.5%, and the labour cost per unit fell from 1.50 to 1.42, even though total labour cost rose by 480. Higher productivity lowers unit cost when the hourly rate stays the same.

Productivity can rise through better training, better machinery, better motivation or better organisation of work. It can fall through poor materials, idle time, machine breakdown or low morale. Do not assume that a rise in total labour cost is bad. It may be caused by more output.

1.4.5 Methods of remuneration

Day work (time rate)

The employee is paid for the hours worked, whatever the output. Overtime is usually paid at a higher rate, such as time and a half (1.5 times the normal rate).

  • Advantages: simple to calculate; income is predictable for the worker; encourages care over quality.
  • Disadvantages: no direct reward for effort, so output may be low; needs supervision.

Piecework

The employee is paid a fixed amount for each unit completed. Many schemes add a guaranteed minimum wage so that the employee is not penalised by materials shortages or breakdowns.

  • Advantages: pay is linked to output, so it motivates workers; labour cost per unit is fixed; less supervision of effort.
  • Disadvantages: quality may fall; pay is uncertain; workers may resist new methods; it needs good records of output.

Individual bonus scheme

A basic wage is paid for the time worked. A bonus is added when the employee completes the work in less than the allowed time. The bonus is a share of the time saved, valued at the hourly rate. In the example below the worker receives 50% of the time saved.

Group bonus scheme

A bonus is paid for the output or time saved by a team. It is shared equally or in proportion to basic pay. It encourages co-operation, but an individual who works hard may gain little if others do not.

A worked comparison

A worker is paid 14 an hour for a 40-hour week. A standard rate of 12 units an hour is used to set allowed time. Piecework is paid at 1.20 per unit with a guaranteed minimum of 480 a week. The bonus scheme gives 50% of the value of time saved.

Output in the week Allowed time Time saved Day work Piecework Bonus scheme
360 units 30 hours 0 560 480 (guarantee) 560
480 units 40 hours 0 560 576 560
600 units 50 hours 10 hours 560 720 630

Workings. Allowed time = output ÷ 12. For 600 units: 600 ÷ 12 = 50 hours, so time saved = 50 − 40 = 10 hours. Bonus = 10 × 14 × 50% = 70, so pay = 560 + 70 = 630. Piecework: 600 × 1.20 = 720; 480 × 1.20 = 576; 360 × 1.20 = 432, which is below the guarantee, so 480 is paid.

Labour cost per unit for the same three outputs:

Output Day work Piecework Bonus scheme
360 units 1.56 1.33 1.56
480 units 1.17 1.20 1.17
600 units 0.93 1.20 1.05

At low output the guarantee makes piecework cost more than the rate suggests (480 ÷ 360 = 1.33). At high output day work gives the lowest cost per unit to the employer (560 ÷ 600 = 0.93) but the worker earns the least. The bonus scheme shares the saving: the employer’s cost per unit falls to 1.05 and the worker gains 70.

1.4.6 Employee earnings and employer cost

Gross pay is the total earned before deductions. Net pay is what the employee receives after deductions such as income tax and the employee’s pension contribution. The employer cost is more than gross pay because the employer also pays its own contributions.

Example (rates invented for practice). An employee works 40 hours at 14 and 5 hours of overtime at time and a half.

$
Basic pay 40 × 14 560.00
Overtime 5 × 14 × 1.5 = 5 × 21 105.00
Gross pay 665.00
Income tax at 20% (133.00)
Employee pension at 4% (26.60)
Net pay 505.40

The employer also pays social security at 10% of gross pay (66.50) and a pension contribution of 5% (33.25).

$
Gross pay 665.00
Employer’s social security 10% 66.50
Employer’s pension 5% 33.25
Total employer cost 764.75

The employee’s tax and pension are not an extra cost to the employer: they are part of gross pay, kept back and paid to the authorities on the employee’s behalf. Employer cost = gross pay + the employer’s own contributions.

In costing, the part of the pay that relates to production time is direct labour. Time spent idle, in training or on supervision is indirect labour and goes into overheads.

Choosing a remuneration method

Match the method to the work:

  • Day work suits work that is hard to measure or where quality matters more than speed.
  • Piecework suits repetitive work with easily counted units.
  • Individual bonus suits work where time standards can be set and effort affects the result.
  • Group bonus suits work done by a team, where individual output cannot be measured.

An evaluation answer should consider the effect on cost per unit, quality, morale, supervision cost and fairness.

Common mistakes

  • Treating overtime as paid at the normal rate.
  • Applying the guaranteed minimum after adding a bonus, or forgetting the guarantee altogether.
  • Confusing time taken with time allowed. Time saved is allowed time − actual time.
  • Giving the whole value of the time saved to the worker when the scheme shares it.
  • Including the employee’s deductions in the employer cost as extra expenses.
  • Leaving out the employer’s own contributions in the employer cost.
  • Calculating labour cost per unit by dividing by hours instead of units.
  • Saying that a method is “best” without a context.

Exam technique

  • Calculate questions need separate lines for basic pay, overtime, bonus, gross pay, deductions and net pay.
  • Show the working for time saved before the bonus.
  • When comparing methods, use numbers for employer and employee, then give a judgement.
  • Explain a disadvantage with a consequence, such as “piecework may reduce quality because workers rush, so the business faces more rejects and higher costs”.

More resources on this topic

Introduction to costing revision notes | Labour costs practice questions | Job costing study guide | Introduction to costing overview guide

Official syllabus

Pearson Edexcel International Advanced Subsidiary/Advanced Level in Accounting (YAC11) specification, Issue 2, September 2018, Unit 1, topic 1.4, outcomes 1.4.4 to 1.4.6: qualifications.pearson.com.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.