Skip to content
Marlbridge

Revision Notes

Cambridge IGCSE Commerce (0715): Global supply chain management – Revision Notes

Recall notes for Cambridge IGCSE Commerce 0715 section 3.2: chain types, upstream and downstream, suppliers, benefits, six risks and risk assessment steps.

Subject
Commerce
Level
IGCSE
Topic
Topic 3 – Globalisation of Trade
Updated

Aligned to Cambridge IGCSE Commerce (0715), 2028. Official specification .

Syllabus page (what it covers and how it is assessed): Cambridge IGCSE Commerce.

Syllabus points this page covers

0715

  • 3.2 Global supply chain management

Found an error? Report a correction.

Need help with this topic? Request a free trial class for IGCSE Commerce (0715).

Condensed notes for section 3.2 of Cambridge IGCSE Commerce (0715). For a mapped chocolate supply chain and a scored risk assessment, use the global supply chain management study guide.

Definitions first

  • Global supply chain: businesses in more than one country that together turn raw materials into a product and deliver it to consumers.
  • Global supply chain management: planning and controlling the whole chain so goods flow at the right cost, quality and time.

Two types (learn the exact order)

Simple Complex
Supplier → manufacturer → consumer Supplier → agent → wholesaler → retailer → consumer
Fewer stages, lower added costs, more control More stages, wider reach, more points of failure
Two vertical chains. Simple: supplier (upstream), manufacturer (enterprise), consumer (downstream). Complex: supplier, agent, wholesaler, retailer, consumer.
A complex chain adds agents, wholesalers and retailers to a simple one.

Three parts of the chain

Part Direction Contains
Upstream Into the business Suppliers of raw materials and components; inbound transport
The enterprise Inside the business Production, assembly, stock control
Downstream Out to the consumer Warehousing, outbound transport, wholesalers, retailers, delivery

Memory hook: a river flows downstream to the sea, as goods flow down to the consumer.

Three columns viewed from the business. Upstream is everything flowing in, such as cocoa farmers, a sugar producer and shipping. The enterprise is the business’s own activities, such as roasting, moulding and packaging. Downstream is everything flowing out, through transport, wholesalers and supermarkets to consumers.
Upstream flows in, the enterprise makes, downstream flows out to the consumer.

Why suppliers matter

Quality of inputs, reliability of delivery, cost of purchases, new ideas, and the brand’s ethical reputation.

Five supplier factors feed into the business and its brand: quality, reliability, cost, innovation, and ethics and reputation. Because of them, businesses build long-term relationships with key suppliers, share sales forecasts and check factories.
A business is only as good, as reliable and as ethical as its suppliers.

Four benefits (syllabus wording)

  1. Lower cost of production: each stage where it is most efficient; less waste.
  2. Lower labour costs: labour-intensive stages in lower-wage countries.
  3. Lower cost of purchasing: best-value suppliers worldwide; bulk buying.
  4. Advancement in logistics and communication: containers, tracking and digital systems make long chains workable.

Six risk categories with examples

Category Examples
Environmental Pollution, deforestation
Natural disasters Floods, earthquakes, storms, drought
Financial Supplier bankruptcy, exchange rate changes, rising costs
Ethical Child labour, unsafe factories, very low pay
Technological Cyber attacks, system failure, outdated components
Political War, unrest, new tariffs, quotas, embargoes, law changes

Mnemonic: “Every New Factory Expects Technical Problems”: Environmental, Natural disasters, Financial, Ethical, Technological, Political.

Six cards for environmental, natural disaster, financial, ethical, technological and political risk. Each gives examples, such as floods, child labour or cyber attacks, and a possible effect, such as ports closed, reputation damage or production halted.
Each risk category has typical examples and a typical effect on the business.

Risk assessment in four steps

  1. Identify what could go wrong at each stage.
  2. Judge likelihood and impact (for example, score each 1 to 5 and multiply).
  3. Rank the risks to see which matter most.
  4. Plan actions: second supplier, safety stock, insurance, audits, cyber security, fixed-price contracts.

Why it is important: acts before problems happen; directs spending to the biggest risks; protects reputation; keeps customers supplied; reassures lenders, insurers and major customers.

Mini example (invented): risk A likelihood 4, impact 3 = 12; risk B likelihood 2, impact 5 = 10. Deal with risk A first.

A five-by-five grid of likelihood against impact with four risks plotted. Flood scores 3 × 5 = 15, child labour 2 × 5 = 10, a hacked ordering system 2 × 4 = 8 and a currency change 4 × 2 = 8, each with its action.
Multiplying likelihood by impact ranks the risks: the flood (15) comes first (invented scores).

Tracing one disruption along the chain

Analyse questions reward showing how a problem moves. Example: a flood closes a component supplier’s factory.

  1. Upstream: components stop arriving.
  2. Enterprise: the assembly line runs out of parts and stops; workers are idle; fixed costs continue.
  3. Downstream: wholesalers and retailers receive no stock; shelves empty.
  4. Consumer: buyers switch to rival brands; sales and reputation suffer.

The further upstream the problem, the more stages it affects.

Benefits versus risks: the trade-off

Long global chains bring the four cost benefits, but every extra country and stage adds distance, more suppliers to check and more exposure to the six risks. Evaluation answers should weigh the saving against the risk for the named business, then recommend a balance, such as keeping a low-cost distant supplier while adding a nearer back-up supplier.

Key terms

Term Meaning
Supply chain Sequence of businesses and activities from raw materials to consumer
Global supply chain Supply chain with stages in more than one country
Upstream Suppliers and inputs flowing into the business
Downstream Distribution of output to the consumer
The enterprise The business’s own production and stock activities
Agent Intermediary arranging trade for a principal for commission
Risk assessment Identifying, judging and planning for possible problems
Safety stock Extra stock kept in case supplies are delayed
Supplier audit A check of a supplier’s working conditions, quality and environmental practice

Exam traps

  • Upstream = inputs; downstream = distribution. Do not reverse them.
  • The complex chain includes the agent; candidates often omit it.
  • Name the risk category and give a fitting example; “a problem in the chain” earns little.
  • Environmental risk is not the same as natural disasters.
  • A tariff or embargo is a political risk.
  • “Why is risk assessment important” needs reasons (prevention, priorities, reputation), not just a definition.

Self-test

  1. Give the stages of a simple supply chain.
  2. Give the stages of a complex supply chain.
  3. Which part of the chain includes the suppliers of raw materials?
  4. Which part includes delivery to retailers?
  5. State two reasons why suppliers are important.
  6. Name the four benefits of global supply chain management in the syllabus.
  7. A supplier’s country introduces an embargo. Which category of risk is this?
  8. A supplier is found to employ children. Which category of risk is this?
  9. Give one example of a technological risk.
  10. Define risk assessment.
  11. Give two reasons why risk assessment is important.
  12. Risk C scores likelihood 3 and impact 4; risk D scores likelihood 5 and impact 2. Which should be dealt with first?

Answers

  1. Supplier, manufacturer, consumer.
  2. Supplier, agent, wholesaler, retailer, consumer.
  3. Upstream.
  4. Downstream.
  5. Any two: quality of inputs; reliable delivery; cost of purchases; innovation; ethical reputation.
  6. Lower cost of production, lower labour costs, lower cost of purchasing, advancement in logistics and communication.
  7. Political.
  8. Ethical.
  9. Any one: cyber attack; failure of ordering or tracking systems; a component becoming outdated.
  10. Identifying what could go wrong in the supply chain, judging how likely and serious each risk is, and planning how to reduce it.
  11. Any two: acts before problems occur; focuses spending on the most serious risks; protects reputation; keeps customers supplied; reassures lenders and customers.
  12. Risk C: 3 x 4 = 12, which is higher than risk D’s 5 x 2 = 10.

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.