Practice Questions
Edexcel International A Level Accounting (YAC11): Job costing – Practice Questions
Nine original job and batch costing questions for Edexcel IAL Accounting (YAC11) 1.4.12-1.4.13: job cost sheets, pricing, batch costs and work in progress, with full answers.
- Subject
- Accounting
- Level
- AS LEVEL
- Topic
- Introduction to costing
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Javaid Iqbal Sabri (what this means)
Aligned to Pearson Edexcel A Level Accounting (YAC11), 2015-onwards. Official specification .
Syllabus page (what it covers and how it is assessed): Pearson Edexcel A Level Accounting.
Syllabus points this page covers
YAC11 (AS Level)
- 1.4.12-1.4.13 Job costing
This page covers 1 of the 4 subtopics in topic 1.4, Introduction to costing.
Found an error? Report a correction.
Need help with this topic? Request a free trial class for A Level Accounting (YAC11).
These are original questions written for Marlbridge, for revision and practice on this content. They are not reproduced past-paper questions, and they do not replicate the exam’s exact structure, question count or mark tariffs, because examination boards hold copyright in their own papers. Use these alongside the official past papers available free from your board.
These questions cover outcomes 1.4.12 and 1.4.13 (characteristics of job costing, and job costing of batch production and customer orders) in Unit 1 of Pearson Edexcel International A Level Accounting (YAC11). All amounts are in dollars and all businesses are invented.
Related: Job costing study guide | Introduction to costing revision notes
Section A
1. State two characteristics of job costing. [2]
2. Identify the source document from which each cost is recorded on a job cost sheet.
(a) Direct materials [1]
(b) Direct labour [1]
3. A job needed materials of 640, 28 hours of direct labour at 15 an hour and a subcontractor charge of 90. Overheads are absorbed at 7 per direct labour hour. Calculate the total cost of the job and the selling price using a mark-up of 40% on cost. [5]
4. Using the total cost from Question 3, calculate the selling price needed to earn a profit margin of 20% of the selling price. [3]
5. State the mark-up on cost that is equivalent to a profit margin of 20%. [2]
Section B
6. Orchard Print makes canvas bags in batches. Batch 12 is 800 bags. The costs are:
- materials 1.80 per bag
- direct labour 50 hours at 13 an hour
- set-up cost 220 for the batch
- overhead absorbed at 5 per machine hour; the batch used 40 machine hours
(a) Calculate the total cost of the batch. [5]
(b) Calculate the cost per bag, and the selling price per bag if a mark-up of 35% is applied (both to the nearest cent). [3]
(c) A batch of 1,600 bags would need 90 labour hours and 70 machine hours, with the same set-up cost. Calculate the cost per bag and explain why it differs. [5]
7. Job 301 was quoted on these estimates: materials 900, direct labour 40 hours at 14 an hour, and overhead of 8 per labour hour. The job actually used materials of 960 and 44 labour hours at 14 an hour. Overhead is still absorbed at 8 per labour hour.
(a) Calculate the estimated cost and the actual cost. [4]
(b) Calculate the difference and state the percentage by which the actual cost exceeded the estimate (one decimal place). [2]
8. At the year end two jobs were incomplete. Job 410 had materials of 350 and 12 labour hours at 14 an hour. Job 411 had materials of 210 and 5 labour hours at 14 an hour. Overhead is absorbed at 8 per labour hour. Calculate the value of work in progress and state where it is shown in the financial statements. [5]
9. Evaluate the suitability of job costing for a business that produces standard products in large quantities. [6]
Answers
1. Any two: each job is a separate order, often made to a customer’s specification [1]; costs are collected for each job on a job cost sheet [1]; a job number identifies the costs [1]; overheads are added using an absorption rate [1]; the profit on each job can be found [1].
2. (a) Materials requisition note [1]
(b) Time sheet or job card [1]
3. Direct labour 28 × 15 = 420 [1]; prime cost 640 + 420 + 90 = 1,150 [1]; overheads 28 × 7 = 196 [1]; total cost 1,150 + 196 = 1,346 [1]; selling price 1,346 × 1.40 = 1,884.40 [1].
4. Cost is 80% of the selling price [1]; selling price 1,346 ÷ 0.80 [1] = 1,682.50 [1].
5. A margin of 20% means profit is 20 for every 80 of cost [1]; mark-up = 20 ÷ 80 = 25% [1].
6. (a) Materials 800 × 1.80 = 1,440 [1]; labour 50 × 13 = 650 [1]; set-up cost 220 [1]; overheads 40 × 5 = 200 [1]; total 2,510 [1].
(b) Cost per bag 2,510 ÷ 800 = 3.14 [1]; selling price 3.1375 × 1.35 = 4.24 [1] (4.24 to the nearest cent) [1].
(c) Materials 1,600 × 1.80 = 2,880; labour 90 × 13 = 1,170; set-up 220; overheads 70 × 5 = 350; total 4,620 [3]; cost per bag 4,620 ÷ 1,600 = 2.89 [1]. The set-up cost of 220 is spread over more bags (0.14 per bag instead of 0.28), so the cost per bag falls [1].
7. (a) Estimated cost: materials 900 + labour 560 (40 × 14) + overhead 320 (40 × 8) = 1,780 [2]. Actual cost: materials 960 + labour 616 (44 × 14) + overhead 352 (44 × 8) = 1,928 [2].
(b) Difference 1,928 − 1,780 = 148 [1]; 148 ÷ 1,780 × 100 = 8.3% [1].
8. Job 410: 350 + 12 × 14 (168) + 12 × 8 (96) = 614 [2]. Job 411: 210 + 5 × 14 (70) + 5 × 8 (40) = 320 [2]. Total work in progress 934, shown as inventory in current assets in the statement of financial position [1].
9. For job costing: it gives a detailed cost for every order and shows which are profitable [1]; it helps price quotations where each order differs [1]. Against: standard products are made in large quantities and do not need a cost sheet for each unit [1]; recording each job is slow and costly [1]; batch or process costing gives the cost per unit more simply [1]. Judgement: job costing is not suitable for standard products; batch costing or process costing would be better, although job costing might be used for special orders [1].
Where marks are usually lost
- Leaving out overhead from the total cost (Questions 3 and 7).
- Confusing mark-up with margin (Questions 4 and 5).
- Dividing the batch cost by the wrong number of units (Question 6).
- Forgetting overhead when valuing work in progress (Question 8).
- Writing that the larger batch costs less in total, when it is the cost per unit that falls (Question 6).
Approaching these questions
Use the job cost sheet layout: direct materials, direct labour, direct expenses, prime cost, overhead, total cost, profit, price. Write a working for each line. For batches, find the total, then divide by the number of units. State whether you are using mark-up or margin before you calculate the price.
Frequently asked questions
Are these Edexcel YAC11 questions from past papers? No. They are original questions on outcomes 1.4.12 and 1.4.13, written for revision. Use them alongside the official past papers.
Is a customer order always a job? Usually, yes. Each order has its own number and cost sheet, so its profit is known.
Related resources
-
Study guides
Edexcel International A Level Accounting (YAC11): Labour costs
Study guide to labour costs for Edexcel IAL Accounting (YAC11): labour productivity, day work, piecework, bonus schemes, employee earnings and employer cost.
Accounting · Pearson Edexcel · AS Level
Read guide -
Practice questions
Edexcel International A Level Accounting (YAC11): Labour costs – Practice Questions
Ten original labour cost questions for Edexcel IAL Accounting (YAC11) 1.4.4-1.4.6: productivity, day work, piecework, bonus schemes, earnings and employer cost, with full answers.
Accounting · Pearson Edexcel · AS Level
Try questions -
Study guides
Edexcel International A Level Accounting (YAC11): Overhead costs
Study guide to overhead costs for Edexcel IAL Accounting (YAC11): cost behaviour, apportionment, service departments, absorption rates and under or over absorption.
Accounting · Pearson Edexcel · AS Level
Read guide