Condensed recall on discharge for AQA A Level Law 7162: exact and substantial performance, actual and anticipatory breach, frustration and the 1943 Act.

Subject
Law
Level
A LEVELS
Topic
Topic 4: Law of contract
Updated

Aligned to AQA A Level Law (7162), For teaching from September 2017 onwards, A-level exams 2019 onwards. Official specification .

Syllabus page (what it covers and how it is assessed): AQA A Level Law.

Syllabus points this page covers

7162

  • Discharge of a contract

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Law (7162).

Condensed notes on the three methods of discharge in the specification. For full explanation and a worked scenario, use the discharge of a contract study guide.

The answer route in one line

What happened? → performed exactly or substantially? → breach (actual or anticipatory; repudiatory?) → innocent party’s election → or frustration (event after formation, no fault, radically different, not excluded) → consequences (damages, or the 1943 Act).

Performance

Rule: performance must be complete and exact.

Case Point
Cutter v Powell (1795) Entire contract; sailor died before voyage ended; nothing recoverable
Re Moore and Landauer (1921) Tins packed 24 instead of 30 to a case; whole consignment rejected

Exceptions

Exception Case Point
Substantial performance Hoenig v Isaacs (1952) Price less cost of fixing minor defects
Not substantial Bolton v Mahadeva (1972) Fume-producing heating system; nothing payable
Severable contract — Payment due for each completed part
Accepted partial performance Sumpter v Hedges (1898) Must be a genuine choice to accept; no payment for half-built buildings left on land
Prevented performance Planché v Colburn (1831) Quantum meruit for work done before the other party abandoned the contract
Tender of performance Startup v Macdonald (1843) Valid offer to perform, wrongly refused, counts as performance
Two strict-rule cases: Cutter v Powell, where a sailor’s widow recovered nothing because the voyage was not completed, and Re Moore and Landauer, where wrongly packed tins could be rejected. Below, bars show Hoenig v Isaacs, where the price was payable less the cost of defects of about £56 on a £750 contract, and Bolton v Mahadeva, where serious defects meant nothing was payable.
The strict rule is harsh; substantial performance earns the price less the cost of repairs.
Four further exceptions. Severable contracts: payment for each completed stage. Acceptance of partial performance: only with a genuine choice to accept (Sumpter v Hedges). Prevented performance: a reasonable sum on a quantum meruit (Planché v Colburn). Tender of performance: a wrongly refused offer to perform counts (Startup v Macdonald).
Stages, genuine acceptance, prevention and tender can all earn payment.

Breach

  • Actual breach: failure to perform when due, defective performance, or making performance impossible.
  • Anticipatory breach: before performance is due, a party shows it will not perform.
  • Repudiatory breach (breach of condition, serious innominate breach, renunciation) gives a choice: terminate and sue, or affirm. A minor breach gives damages only.
Case Point
Hochster v De la Tour (1853) Courier told in May he would not be needed in June; could sue at once
Frost v Knight (1872) Engagement broken off before the agreed condition occurred; immediate claim
White and Carter v McGregor (1962) Innocent party may affirm, perform and claim the price
Avery v Bowden (1855) Affirming keeps the contract alive; later frustration by war removed the claim
Actual breach happens when performance is due; anticipatory breach before it is due. A repudiatory breach, meaning breach of a condition, a serious breach of an innominate term or a refusal to perform, lets the innocent party choose to terminate and claim damages or affirm and continue. A minor breach gives damages only.
A repudiatory breach gives a choice: terminate or affirm. A minor one gives damages only.
A timeline from contract to repudiation to the date performance is due. In Hochster v De la Tour the courier was told in May he would not be needed from 1 June. Option 1: accept the repudiation and sue at once, with damages assessed by reference to the performance date and a duty to mitigate (Hochster; Frost v Knight). Option 2: affirm and wait, as in White and Carter v McGregor, but at the risk shown in Avery v Bowden, where war frustrated the contract and the claim was lost.
Accepting lets you sue at once; affirming keeps the contract alive for both sides.

Frustration

Test: an event after formation, without fault, makes performance impossible, illegal or radically different (Lord Radcliffe, Davis Contractors v Fareham UDC, 1956).

Applies Case
Subject matter destroyed Taylor v Caldwell (1863): music hall burned down
Personal contract, illness Robinson v Davison (1871): pianist; Condor v Baron Knights (1966): drummer
Supervening illegality Metropolitan Water Board v Dick Kerr (1918)
Purpose defeated Krell v Henry (1903): coronation procession cancelled
Long interruption Jackson v Union Marine Insurance (1874)
Does not apply Case
More expensive or slower Davis Contractors (1956): 22 months instead of 8
Longer route Tsakiroglou v Noblee Thorl (1962): Suez Canal closure
Purpose only partly defeated Herne Bay Steam Boat v Hutton (1903): fleet still visible
Self-induced Maritime National Fish (1935); The Super Servant Two (1990)
Risk provided for Force majeure or other express clause governs

Effects: contract ends automatically at the time of frustration. Law Reform (Frustrated Contracts) Act 1943:

  • s1(2): money paid is recoverable; money payable ceases to be payable; court may allow expenses up to the sum paid or payable before frustration.
  • s1(3): just sum for a valuable benefit (other than money) received before frustration (BP Exploration v Hunt (No 2)).
Five categories of frustration with cases: destruction of the subject matter (Taylor v Caldwell), death or incapacity in a personal contract (Robinson v Davison; Condor v Baron Knights), supervening illegality (Metropolitan Water Board v Dick Kerr), purpose defeated (Krell v Henry) and long interruption (Jackson v Union Marine Insurance). The test from Davis Contractors is performance radically different from what was undertaken.
An event after formation, without fault, that makes performance radically different.
Bars show Davis Contractors, where a job planned for 8 months took 22 and cost more but was not frustrated. Four further limits: harder or dearer is not enough (Tsakiroglou); the purpose must be wholly defeated (Herne Bay Steam Boat v Hutton, contrasted with Krell v Henry); self-induced frustration does not count (Maritime National Fish; The Super Servant Two); and an express clause such as force majeure governs instead.
More time, more cost or a partly defeated purpose is not frustration.
The Law Reform (Frustrated Contracts) Act 1943. Section 1(2): money paid before frustration is recoverable and money payable ceases to be payable, but the court may allow the payee expenses up to that amount. Section 1(3): a party who received a valuable non-money benefit may be ordered to pay a just sum (BP Exploration v Hunt).
Money comes back, less allowed expenses; other benefits are paid for with a just sum.

Key terms

Term Meaning
Discharge Release of the parties from future obligations
Entire contract One requiring complete performance before payment is due
Substantial performance Performance complete apart from minor defects
Quantum meruit A reasonable sum for work done
Repudiatory breach A breach serious enough to give the right to terminate
Anticipatory breach A refusal to perform shown before performance is due
Affirmation Election to continue the contract after a repudiatory breach
Frustration Discharge by a later event, without fault, that makes performance radically different
Self-induced frustration Where a party’s own choice causes the event; no frustration

Exam traps

  • Saying breach automatically ends the contract; the innocent party elects.
  • Forgetting that affirmation keeps the contract alive for both sides (Avery v Bowden).
  • Treating a price rise or delay as frustration.
  • Missing a choice by the defendant that makes the frustration self-induced.
  • Leaving out recovery of money under s1(2) of the 1943 Act.
  • Confusing substantial performance with acceptance of partial performance; the second needs a genuine choice to accept.

Self-test

  1. What was the effect of the entire contract in Cutter v Powell?
  2. Why could the buyers reject the goods in Re Moore and Landauer?
  3. How did Hoenig v Isaacs differ from Bolton v Mahadeva?
  4. Why did the builder recover nothing in Sumpter v Hedges?
  5. What is anticipatory breach, and which case allows an immediate claim?
  6. What are the innocent party’s two options after a repudiatory breach?
  7. What risk of affirming does Avery v Bowden show?
  8. State Lord Radcliffe’s test for frustration.
  9. Why was the contract in Krell v Henry frustrated but not in Herne Bay Steam Boat v Hutton?
  10. Why was Davis Contractors v Fareham UDC not a case of frustration?
  11. What is self-induced frustration? Give a case.
  12. What does s1(2) of the Law Reform (Frustrated Contracts) Act 1943 provide?

Answers: 1. The sailor’s widow recovered nothing because the voyage was not completed. 2. Tins were packed 24 to a case instead of 30, so performance was not exact. 3. In Hoenig the defects were minor, so there was substantial performance; in Bolton the heating system was seriously defective, so there was not. 4. The landowner had no genuine choice about accepting half-built buildings on his land. 5. A refusal to perform shown before performance is due; Hochster v De la Tour. 6. Terminate and claim damages, or affirm and continue. 7. The contract stays alive for both parties, so a later frustrating event can remove the claim. 8. Performance would be “a thing radically different from that which was undertaken by the contract”. 9. In Krell the sole purpose was to watch the procession; in Herne Bay the fleet could still be viewed, so the purpose was not wholly defeated. 10. The work only took longer and cost more, which is not radically different performance. 11. Where a party’s own choice causes the event; Maritime National Fish v Ocean Trawlers (1935) or The Super Servant Two (1990). 12. Money paid before frustration is recoverable, sums payable cease to be payable, and the court may allow the payee expenses up to the amount paid or payable.

More resources on this topic

Discharge of a contract study guide | Discharge of a contract practice questions | Law of contract revision notes

Related resources

Get free revision emails (optional)

Occasional emails with practice questions, worked explanations and links to free resources for the qualification and subjects you choose. No spam, and you can unsubscribe from any email. The free tools on this site never need an email.