Practice Questions
Cambridge IGCSE Environmental Management (0680): Extraction of rocks, ores and minerals – Practice Questions
Original practice questions with full answers on mining methods, ore grade, extraction decisions, impacts and land restoration for Cambridge IGCSE 0680.
- Subject
- Environmental Management
- Level
- IGCSE
- Topic
- Topic 1 – Natural Resources
- Author
- Marlbridge Academic Team
- Updated
- Reviewed by
- Azam Siddique (what this means)
Aligned to Cambridge IGCSE Environmental Management (0680), 2027-2029. Official specification .
Syllabus page (what it covers and how it is assessed): Cambridge IGCSE Environmental Management.
Syllabus points this page covers
0680
- 1.2 Extraction of rocks, ores and minerals
Found an error? Report a correction.
Need help with this topic? Request a free trial class for IGCSE Environmental Management (0680).
These are original questions written for Marlbridge to practise sub-topic 1.2. They are not past-paper questions and do not copy the exam’s structure, question count or mark tariffs. Use them alongside the official past papers for Cambridge IGCSE Environmental Management (0680).
Related: Extraction of rocks, ores and minerals study guide | Extraction revision notes | Natural Resources practice questions
Section A
1. Define an ore. [1]
2. State what is meant by overburden. [1]
3. Name the two subsurface extraction methods in the syllabus. [2]
4. Describe how bioleaching recovers metal from low-grade ore. [2]
5. State two advantages of surface extraction compared with subsurface extraction. [2]
6. Name two land restoration strategies and two ways of repurposing land after extraction. [4]
Section B
7. A zinc deposit contains 400,000 tonnes of ore with an ore grade of 2.5% zinc.
(a) Calculate the mass of zinc in the deposit. Show your working. [2]
(b) Calculate the mass of rock left over as waste once all the zinc has been extracted. [1]
(c) Explain two factors, other than ore grade, that could lead a company to decide not to mine this deposit. [4]
8. Describe how strip mining is carried out, and explain why it is suited to a coal seam lying close to the surface. [3]
9. A mining company is comparing two possible copper sites. The information is invented for practice.
| Site A | Site B | |
|---|---|---|
| Ore grade | 0.8% | 1.6% |
| Distance to nearest railway | 5 km | 300 km (no road) |
| Climate | Mild, rain all year | Ground frozen for most of the year |
| Land use | Farmland near a town | Uninhabited tundra |
Suggest which site the company is more likely to develop. Justify your answer using the information. [4]
10. Explain how a large open-pit mine can affect water supplies in the surrounding area. [4]
11. Describe what an environmental impact assessment is, and explain why a government may require one before allowing a mine to open. [3]
12. A quarry has closed and part of the pit has filled with water. The local council must choose between using the pit for landfill or turning it into a lake for recreation and a nature reserve. Discuss the benefits and limitations of each option. [6]
Answers
1. Rock containing minerals and metals [1].
2. The soil and rock lying above a deposit, which must be removed to reach it [1].
3. Deep mining [1]; shaft mining [1].
4. Bacteria break down the ore [1] and release metal compounds into a solution (leachate), from which the metal is recovered [1].
5. Any two: lower cost per tonne [1]; safer for workers (no risk of tunnel collapse or underground gases) [1]; recovers a larger proportion of the deposit [1]; large machines can move large quantities quickly [1].
6. Restoration, any two: replacement of overburden [1]; soil improvement [1]; bioremediation [1]; tree planting [1]. Repurposing, any two: landfill [1]; lakes [1]; recreation [1]; nature reserves [1]. Maximum 2 for each group.
7. (a) 400,000 × 0.025 (or 400,000 × 2.5 ÷ 100) [1] = 10,000 tonnes [1].
(b) 400,000 − 10,000 = 390,000 tonnes [1].
(c) Two factors, each with an explanation, 2 marks each:
- Cost and profit: if the price of zinc is low, income may not cover extraction, processing and restoration costs [1], so the company would make a loss [1].
- Accessibility and terrain: a remote or mountainous site needs new roads or railways [1], raising the cost of bringing in machinery and taking out ore [1].
- Environmental impact assessment: the EIA may show serious harm, for example to a river or protected habitat [1], so permission is refused or conditions make the project too expensive [1].
- Supply and demand: if supply already meets demand [1], the extra zinc may not sell at a profitable price [1].
- Geology or climate: a deep or steeply angled deposit or extreme climate raises costs [1] and may make extraction unsafe or seasonal [1].
8. Overburden is removed in a long strip to expose the seam, and the coal is dug out [1]; the overburden from the next strip is placed in the gap left by the previous one [1]. It suits a shallow seam because only a thin layer of overburden must be moved, so the coal can be reached cheaply without tunnels [1].
9. Site A is more likely [1]. Justification, any three:
- It is only 5 km from a railway, so ore can be transported cheaply, whereas Site B would need a 300 km route built [1].
- The mild climate allows work all year; frozen ground at Site B would slow work and damage equipment [1].
- Although Site B’s grade is double, Site A’s lower grade may be offset by much lower transport and building costs [1].
- Credit an argument for Site B if fully justified: higher grade halves the ore to be processed and there are no nearby residents to be affected [1].
- A limitation of Site A: farmland and a town nearby mean noise, dust and loss of farmland, so the EIA may impose costly conditions [1].
Maximum 4.
10. Any four:
- Processing ore and suppressing dust use large volumes of water [1], which can lower river levels or ground water available to farms and homes [1].
- Pumping water out of a deep pit lowers the local water table [1], so nearby wells may dry up [1].
- Rain washing over exposed rock and spoil carries sediment into rivers [1], making water cloudy and harming aquatic life [1].
- Chemicals used in processing, or toxic metals in tailings, can leak into rivers and ground water [1], making water unsafe to drink [1].
11. An EIA is a study of the likely effects of a proposed project on the environment and people, carried out before permission is given [1]. It identifies harmful impacts so that they can be avoided or reduced, or the project refused [1], and lets the government and local people make an informed decision [1].
12. Levels-based. Credit up to 6 from:
- Landfill benefits: provides space to dispose of the area’s waste [1]; earns income from waste disposal fees, which can pay for landscaping [1].
- Landfill limitations: leachate may pollute ground water, especially as the pit already contains water [1]; methane may be released, and lorries bring noise and smell [1].
- Lake and nature reserve benefits: creates wetland habitat and increases biodiversity [1]; provides recreation and tourism income [1]; cheaper because the pit is already filling with water [1].
- Lake and nature reserve limitations: steep, deep pit sides can be dangerous for swimmers [1]; water may be polluted by minerals from the quarry [1]; income may be smaller than from landfill [1].
- Judgement that weighs both, for example the lake is safer because water in the pit makes landfill pollution likely [1].
Maximum 6; an answer that covers only one option scores no more than 3.
Where marks are usually lost
- Question 4: describing plants instead of bacteria. Phytomining uses plants; bioleaching uses bacteria.
- Question 7(a): using 2.5 instead of 0.025, giving an answer 100 times too large. Check that the zinc is a small fraction of the ore.
- Question 9: choosing a site without using the figures. Each justification mark needs a piece of information from the table.
- Question 10: writing “it pollutes water” without the cause (sediment, chemicals or tailings) and the effect.
- Question 12: discussing only one option, or giving benefits without limitations.
Related resources
-
Revision notes
Cambridge IGCSE Environmental Management: Land — Revision Notes
Recall notes on soils and crop growth, food production and soil erosion for Topic 2 Land of Cambridge IGCSE Environmental Management 0680, 2027-2029 series.
Environmental Management · Cambridge · IGCSE
Revise topic -
Revision notes
Cambridge IGCSE Environmental Management (0680): Extraction of rocks, ores and minerals – Revision Notes
Recall notes on mining methods, extraction factors, impacts and land restoration for 1.2 Extraction of rocks, ores and minerals, Cambridge IGCSE 0680.
Environmental Management · Cambridge · IGCSE
Revise topic -
Study guides
Cambridge IGCSE Environmental Management (0680): Formation of rocks
How granite, basalt, limestone, sandstone, shale, marble and slate form, the eight rock cycle processes and rock permeability for Cambridge IGCSE 0680.
Environmental Management · Cambridge · IGCSE
Read guide