Edexcel International A Level Law (YLA1): Discharge of Contract: Performance, Agreement, Breach and Frustration – Revision Notes

Condensed notes on discharge by performance, agreement, breach and frustration, the 1943 Act, leading cases, traps and a self-test, for YLA1 content area 2.1.4.

Subject
Law
Level
A LEVELS
Topic
Paper 2 – The Law in Action
Updated

Aligned to Pearson Edexcel A Level Law (YLA1), Issue 4, November 2021. Official specification .

Syllabus page (what it covers and how it is assessed): Pearson Edexcel A Level Law.

Syllabus points this page covers

YLA1

  • 2.1 The market

Found an error? Report a correction.

Need help with this topic? Request a free trial class for A Level Law (YLA1).

Condensed for the final weeks. These notes cover the discharge bullet of content area 2.1.4: “discharge of contract – performance – agreement – breach – frustration, including the Law Reform (Frustrated Contracts) Act 1943”. For the full explanation, use the discharge of contract study guide; the whole market section is in the market revision notes.

Four ways a contract ends

Method Core rule Leading case
Performance Must be complete and exact Cutter v Powell (1795)
Agreement Both agree to end it; needs consideration or a deed Accord and satisfaction
Breach Repudiatory breach gives the option to end the contract Poussard v Spiers; Hong Kong Fir [1962]
Frustration Later event, no one’s fault, makes performance impossible or radically different Taylor v Caldwell (1863); Davis Contractors [1956]
A contract is discharged when the parties’ obligations end, by performance, agreement, breach or frustration. Performance and agreement are the normal, peaceful endings; breach and frustration are where disputes arise and where Paper 2 questions concentrate.
Performance and agreement end a contract peacefully; breach and frustration produce the disputes.

Performance: exceptions to the strict rule

  • Substantial performance: price less cost of defects (Hoenig v Isaacs [1952]); not where defects are serious (Bolton v Mahadeva [1972]).
  • Divisible contracts: pay for each completed part.
  • Freely accepted partial performance: reasonable sum; but no free choice in Sumpter v Hedges [1898].
  • Prevented performance: reasonable sum (Planché v Colburn (1831)).
  • Tender of performance: refused tender discharges the tenderer (Startup v Macdonald (1843)).
The strict rule from Cutter v Powell (1795) requires complete and exact performance. Exceptions: substantial performance (Hoenig v Isaacs) but not where defects are serious (Bolton v Mahadeva); divisible contracts; freely accepted part performance (contrast Sumpter v Hedges); prevention (Planché v Colburn); and refused tender of performance (Startup v Macdonald).
Exact performance is the rule; five exceptions soften it.

Agreement

  • Bilateral: both still owe obligations; mutual release is consideration.
  • Unilateral: one has performed; the other needs new consideration (accord and satisfaction) or a deed.
  • Terms of the contract: notice periods, conditions.
  • Novation: a new contract replaces the old.
An agreement to end a contract needs consideration. In bilateral discharge both parties still have obligations, so mutual release is consideration on both sides. In unilateral discharge one party has already performed, so the other must give something new or use a deed: accord and satisfaction. Contracts can also end under their own terms or by novation.
Ending a contract by agreement still needs consideration, unless a deed is used.

Breach

Breach of warranty .............. damages only
Breach of condition ............. damages + option to end
Breach of innominate term ....... option to end only if the innocent party
                                  loses substantially the whole benefit
                                  (Hong Kong Fir)
Anticipatory breach ............. sue now (Hochster v De La Tour)
                                  or wait, at your own risk (Avery v Bowden)
                                  or perform and claim the price if a
                                  legitimate interest (White and Carter)
Every breach gives a right to damages, for example breach of a warranty (Bettini v Gye). Only a repudiatory breach gives the innocent party the option to treat the contract as ended: breach of a condition (Poussard v Spiers), a breach of an innominate term that deprives them of substantially the whole benefit, or renunciation. In Hong Kong Fir a ship unseaworthy for some weeks of a two-year charter was not serious enough.
Every breach gives damages; only a repudiatory breach gives the option to end the contract.
When a party announces before performance that they will not perform, the innocent party may sue immediately (Hochster v De La Tour) or wait for the date of performance. Waiting carries risk: in Avery v Bowden war frustrated the contract and the right to sue was lost. In White and Carter v McGregor the innocent party performed and claimed the price, given a legitimate interest.
The innocent party chooses: sue at once, or keep the contract alive and bear the risk.

Frustration

Frustrating events

Event Case
Destruction Taylor v Caldwell (1863)
Illness or death in a personal contract Robinson v Davison (1871); Condor v Baron Knights [1966]
Supervening illegality Fibrosa [1943]
Government intervention or long delay Metropolitan Water Board v Dick Kerr [1918]
Main purpose defeated Krell v Henry [1903]

Not frustrated

Reason Case
Purpose only partly defeated Herne Bay Steam Boat v Hutton [1903]
More expensive or difficult Davis Contractors v Fareham UDC [1956]; Tsakiroglou v Noblee Thorl [1962]
Self-induced Maritime National Fish v Ocean Trawlers [1935]; The Super Servant Two [1990]
Foreseen or covered by a force majeure clause The contract allocates the risk
A contract is frustrated by an event after formation, no one’s fault, that makes performance impossible, illegal or radically different (Davis Contractors). Frustrating events: destruction (Taylor v Caldwell), death or incapacity (Robinson v Davison; Condor v Baron Knights), supervening illegality (Fibrosa), government intervention (Metropolitan Water Board v Dick Kerr) and purpose defeated (Krell v Henry). Not frustrated: purpose only partly defeated (Herne Bay), more difficult or expensive (Davis; Tsakiroglou), self-induced (Maritime National Fish; The Super Servant Two), or foreseen or covered by a term.
Frustration is narrow: a harder, dearer or self-induced problem does not end the contract.

The 1943 Act

  • s 1(2): money paid before frustration is recoverable; money payable ceases to be payable; the court may allow the payee to keep or recover expenses, up to the sum paid or payable (Gamerco v ICM [1995]: no deduction allowed).
  • s 1(3): a party who received a valuable benefit other than money pays a just sum (BP Exploration v Hunt (No 2) [1979]).
  • Background: Fibrosa allowed recovery only for total failure of consideration; the Act followed in the same year.
At common law loss lay where it fell, and Fibrosa allowed recovery only on a total failure of consideration. Under the 1943 Act, s 1(2) makes money paid before the event recoverable and money payable cease to be payable, with a discretion to allow expenses up to that amount (none were allowed in Gamerco). Under s 1(3) a party who obtained a valuable non-money benefit may have to pay a just sum (BP v Hunt).
The Act unpicks payments fairly; any allowance for expenses is the court’s choice.
Kemi paid a £1,000 deposit with £2,000 due on the night; the lead singer is injured. The contract is probably frustrated because incapacity of the key performer makes performance radically different (Robinson v Davison; Condor v Baron Knights). Under s 1(2) the £1,000 is recoverable and the £2,000 ceases to be payable; the court may let the band keep up to £300 for expenses if just.
Frustrated, then s 1(2): deposit back, balance cancelled, expenses at the court’s discretion.

Model evaluation paragraph

The doctrine of frustration is deliberately narrow: Davis Contractors and Tsakiroglou show that increased cost or difficulty is not enough, which protects certainty and stops parties escaping bad bargains. The cost of that narrowness is that some parties remain bound in hardship, but the 1943 Act softens the effect of frustration where it does apply, by returning advance payments and giving the court discretion over expenses, as in Gamerco*. Together they balance certainty with fairness, though the broad discretion in s 1(2) makes outcomes hard to predict.*

Key terms

Term Meaning
Discharge The ending of contractual obligations
Substantial performance Performance complete except for minor defects
Divisible contract Contract with separately payable parts
Accord and satisfaction An agreement to release one party, supported by new consideration
Repudiatory breach A breach serious enough to allow the innocent party to end the contract
Anticipatory breach Announcing non-performance before it is due
Innominate term A term whose breach is judged by its consequences
Frustration Discharge by a later event that makes performance impossible or radically different
Self-induced frustration An event caused by a party’s own choice; not frustration
Force majeure clause A term allocating the risk of specified events

Exam traps

  • An event before the contract is common mistake, not frustration.
  • More expensive ≠ frustrated.
  • Only repudiatory breach gives the option to end the contract.
  • The innocent party chooses whether to accept an anticipatory breach.
  • The 1943 Act’s expenses rule is discretionary and capped at the sum paid or payable.

Self-test

  1. What was decided in Cutter v Powell?
  2. Distinguish Hoenig v Isaacs from Bolton v Mahadeva.
  3. Why did the builder in Sumpter v Hedges recover nothing for the unfinished buildings?
  4. What does Startup v Macdonald show?
  5. What is accord and satisfaction?
  6. What test did Hong Kong Fir set for innominate terms?
  7. What are the innocent party’s options after an anticipatory breach?
  8. Why did the claimant lose in Avery v Bowden?
  9. Why was Herne Bay Steam Boat v Hutton not frustrated, unlike Krell v Henry?
  10. Why was the contract not frustrated in Tsakiroglou?
  11. What does s 1(2) of the 1943 Act provide?
  12. What was decided about expenses in Gamerco v ICM?

Answers: 1. A sailor who died before completing a voyage earned nothing under a lump-sum contract; performance must be complete. 2. In Hoenig defects were minor, so substantial performance allowed the price less repair costs; in Bolton the heating system was seriously defective, so nothing was payable. 3. The landowner had no real choice but to accept the half-finished buildings on his land, so there was no free acceptance. 4. A valid tender of performance that is refused discharges the party who tendered. 5. An agreement to release a party from obligations (accord) supported by new consideration (satisfaction). 6. Whether the breach deprived the innocent party of substantially the whole benefit of the contract. 7. Sue immediately, or affirm and wait for the date of performance (and, with a legitimate interest, perform and claim the price). 8. He waited after the anticipatory breach, and war broke out and frustrated the contract before performance was due. 9. The boat could still be used to cruise round the fleet, so the purpose was not wholly defeated; in Krell the only purpose was to view the procession. 10. The closure of the Suez Canal made shipping longer and more expensive but not radically different. 11. Money paid before the frustrating event is recoverable, money payable ceases to be payable, and the court may allow expenses up to that sum. 12. The court allowed no deduction for the band’s expenses and ordered the full advance to be repaid.

Test yourself further with the discharge of contract practice questions.